650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.

Slides:



Advertisements
Similar presentations
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Superconducting Spoke Resonator Cavities and Cryomodules
FNAL Superconducting RF Program Sergei Nagaitsev.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
650 MHz Cryomodule Design, 21 Feb 2011Page 1650 MHz Cryomodule Design, 21 Feb 2011Page 1 Project X Cryomodules Tom Peterson and Yuriy Orlov with material.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
SLHC WG3 (Cryomodule) summary & plan with recommendation to the CB V.Parma, CERN TE-MSC P. DUTHIL, IN2P3-CNRS 3rd SPL collaboration meeting, CERN
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
325 MHz Spoke Cavity Prototype Cryomodule Project X Front-end Meeting Bob Webber November 3, 2010.
SSR1 Summary Harry Carter & Tom Peterson 19 November 2010.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
LCLS-II Cryomodule Design
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Tom Peterson -- Cryomodules Integration of cryomodules into the Project X cryo system -- design comments and issues Tom Peterson 3 Jan 2011.
CERN – Zanon discussions
WP5 Elliptical cavities
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Progress and Issues with VTS Upgrade
Project X: Cryogenic Segmentation Issues
BDS Cryogenic System RDR Status and EDR Plans
ILC Cryogenic Systems Draft EDR Plan
V. Veshcherevich Cornell University
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
HIE-LINAC status report
ILC Cryogenics -- Technical Design Report Planning
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
HWR and Test Cryomodule for China ADS
Presentation transcript:

650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson (Fermilab) for the cavity and cryomodule design team

650 MHz, Beta = 0.9, 11 April 2012Page 2 Project X Reference Design Cryomodules for CW linac

650 MHz, Beta = 0.9, 11 April 2012Page 3 SectionFreqEnergy (MeV)Cav/mag/CMType HWR (  G =0.1) /8/1HWR, solenoid SSR1 (  G =0.22) /8/ 2SSR, solenoid SSR2 (  G =0.47) /20/4SSR, solenoid LB 650 (  G =0.61) /14/75-cell elliptical, doublet HB 650 (  G =0.9) /19/195-cell elliptical, doublet ILC 1.3 (  G =1.0) /28 /289-cell elliptical, quad Page 3  =0.11  =0.22  =0.4  =0.61  = MHz MeV  = GHz 3-8 GeV 650 MHz GeV CW Pulsed MHz MeV SRF Linac Technology Map

650 MHz, Beta = 0.9, 11 April 2012Page 4 Design approach CW cavities and cryomodules with as much as 25 W per cavity at 2 K and tight constraints on cavity frequency present some different problems from TESLA/ILC cryomodules –Over 200 W at 2 K per cryomodule (Project X beta=0.9) as opposed to about 12 W at 2 K per cryomodule (ILC estimate) We have (draft) requirements documents and fundamental cryomodule parameter lists Analyses, modeling, and reviews of various concepts based on existing designs Estimated heat per cryomodule 2 K –Static: 9 W –Dynamic: 200 W 5 K –Static: 15 W –Dynamic: 11 W 70 K –Static: 177 W –Dynamic: 80 W

650 MHz, Beta = 0.9, 11 April 2012Page 5 Cavity requirements (from 650 MHz Superconducting Cavity Functional Requirement Specification)

650 MHz, Beta = 0.9, 11 April 2012Page 6 Cavity status in the U.S. 650 MHz, beta = 0.9, cavity preliminary design –Six single-cell cavities have been fabricated at AES –Four 5-cell cavities on order from AES –Also have an order for single cells at RI –Cavity design with stiffening rings is still being optimized for minimal df/dP with tunability (present version very low df/dP but perhaps too stiff) Helium vessel conceptual design –First design using blade tuner concept –Considering also end lever tuner options –Considering also flanged joint to 2-phase pipe

650 MHz, Beta = 0.9, 11 April 2012Page MHz, beta = 0.9, cavity fabrication in the U.S. Six single cell 650 MHz Nb cavities have just been received from AES –Photo of one at left with 1.3 GHz 9-cell cavities

8 650 MHz β=0.9 SCRF Cavities in India MHz (  =0.9) Single cell cavity Design for manufacturing has been completed. Design & development of fixture and tooling is in progress. Initial development of Forming tool & half cell forming is on going 650 MHz  =0.9 single cell cavity 3-D Models 650 MHz  =0.9 single cell cavity 2-D Drawing RRCAT Indore Slide from Avinash Puntambekar

99 1st Prototype Die- Punch Set Prototype forming dies for 650 MHz,  = 0.9 SRF cavity RRCAT Indore Beginning of forming trials in copper Half cell inner side view Half cell outer side view Die-Punch setHalf cell inner side view Slide from Avinash Puntambekar

10 2 nd Die-Punch set Based on the forming trails from the first Die-punch set, a second set of Die-Punch is under machining. More forming trials will be taken using 2 nd Die-punch set. These half cells will be trimmed at work-shop. This will be followed by CMM measurements. Based on the report forming on Niobium will be taken in next one month. RRCAT Indore Slide from Avinash Puntambekar

650 MHz, Beta = 0.9, 11 April 2012Page 11 Helium vessel concepts Very large helium vessel and large 2-phase pipe result in overly large assembly, difficult to handle and test –Helium vessel shown with demountable 2-phase helium pipe via proven diamond seal and flange (which seals SF helium to cavity vacuum in vertical tests). Also shown with scaled-up slim blade tuner Large diameter helium vessel results in large forces on blade tuner –Developing end lever tuner conceptual designs

650 MHz, Beta = 0.9, 11 April 2012Page 12 Cryomodule style and segmentation Very high heat flux (over 200 W per CM) and relatively short linac (not large quantities nor multi-km long strings) ==> –Need separated liquid management over one or a few cryomodules –Prefer small heat exchangers, distributed with cryomodules –Prefer stand-alone cryomodules, allowing warm magnets and instrumentation between cryomodules like at SNS Stand-alone CM ==> –“300 mm” pipe is unnecessary for helium flow –“300 mm” pipe or equivalent may, however, be beneficial as vapor buffer to help pressure stability –May combine “300 m” pipe function and 2-phase pipe function Not need 300 mm pipe for helium flow ==> –Empty 300 mm pipe may serve as support “backbone” or –Different support structure (posts, tension rods, space frame)

650 MHz, Beta = 0.9, 11 April 2012Page 13 Summary from cryomodule requirements document 1.1 The baseline design concept includes cryomodules closed at each end, individual insulating vacuums, with warm beam pipe and magnets in between cryomodules such that individual cryomodules can be warmed up and removed while adjacent cryomodules are cold. 1.2 Provide the required insulating and beam vacuum reliably 1.3 Minimize cavity vibration and coupling of external sources to cavities 1.4 Provide good cavity alignment (<0.5 mm) 1.5 Allow removal of up to 250 W at 2 K per cryomodule (We have chosen to limit cryomodules to no more than 250 W average total power to 2 K.) 1.6 Protect the helium and vacuum spaces including the RF cavity from exceeding allowable pressures. 1.7 Intercept significant heat loads at intermediate temperatures above 2.0 K to the extent possible in full CW operation 1.8 Provide high reliability in all aspects of the cryomodule (vacuum, alignment stability, mechanics, instrumentation) including after thermal cycles 1.9 Provide excellent magnetic shielding for high Q Minimize cost (construction and operational)

650 MHz, Beta = 0.9, 11 April 2012Page 14 Cryomodule requirements -- major components Eight (8) dressed RF cavities Eight RF power input couplers One intermediate temperature thermal shield Cryogenic valves –2.0 K liquid level control valve –Cool-down/warm-up valve –5 K thermal intercept flow control valve Pipe and cavity support structure Instrumentation -- RF, pressure, temperature, etc. Heat exchanger for 4.5 K to 2.2 K precooling of the liquid supply flow Bayonet connections for helium supply and return Nominally 5 K to 8 K thermal intercept helium circuit Nominally 40 K to 80 K thermal radiation shield and intercepts

650 MHz, Beta = 0.9, 11 April 2012Page 15 Slot lengths 650 MHz cavities at 2 K Warm magnets and instrumentation 11.3 meters

650 MHz, Beta = 0.9, 11 April 2012Page 16 Design considerations Updated heat load estimates Cooling arrangement for integration into cryogenic system –Selection of operational temperatures and pressures Pipe sizes for steady-state and emergency venting –Low steady-state vapor velocities –Venting within maximum allowable working pressures Pressure stability factors –Liquid volume, vapor volume, liquid-vapor surface area as buffers via evaporation or condensation for pressure change –Valve and pipe positioning to avoid oscillations Thermal intercept arrangements and optimal flow strategy Alignment and support stability Thermal contraction and fixed points with closed ends Etc.

650 MHz, Beta = 0.9, 11 April 2012Page 17 Cryomodule cooling scheme

650 MHz, Beta = 0.9, 11 April 2012Page 18 Cavity assembly concept (Yuriy Orlov) In this concept, 300 mm pipe serves as the 2-phase helium pipe, also providing a large vapor buffer volume.

650 MHz, Beta = 0.9, 11 April 2012Page 19 Cryomodule concept -- end view

650 MHz, Beta = 0.9, 11 April 2012Page 20 Cryomodule concept -- cryo connections and valves

650 MHz, Beta = 0.9, 11 April 2012Page 21 Cryomodule concept -- access port side

650 MHz, Beta = 0.9, 11 April 2012Page 22 Cryomodule concept -- coupler side

23 Cavities : Eight Cavities of 650MHz Diameter : meters Length : 12 meters Weight : 7-8 Tons Cavities : Eight Cavities of 650MHz Diameter : meters Length : 12 meters Weight : 7-8 Tons 3-D Model: 650MHz cryomodule Developed at RRCAT Status of 650 MHz Cryomodule and HTS-2 Development Efforts under IIFC Slide from Prashant Khare Extensive work at RRCAT on Thermal shield analyses Support structure analyses and mechanical modeling Vacuum vessel design

650 MHz, Beta = 0.9, 11 April 2012Page 24 Summary We have prototype beta = 0.9, 650 MHz niobium cavities at Fermilab (single cell) and in fabrication (5 cell) –Cavity design still being optimized for stiffness, df/dP and tunability Also a significant effort and good progress for single cell production at RRCAT in Indore, India Helium vessel details depend on some remaining design decisions –Tuner style (end or blade tuner) –Verification of RF power input coupler –Integration into cryomodule, connection to 2-phase pipe Requirements imply (in our opinion) stand-alone cryomodules –Separated insulating vacuum –2 K cooling of the cavities with heat exchanger at the cryomodule –Single temperature level of thermal radiation shield, two temperature levels of thermal intercepts –Warm magnets between cryomodules

650 MHz, Beta = 0.9, 11 April 2012Page 25 Priorities, plans 650 MHz cavity development will continue –Nb cavity design for df/dP, tuning, vertical tests of prototypes –650 MHz input coupler design and prototyping –Tuner conceptual design work and prototyping –Helium vessel conceptual design work and prototyping 650 MHz cryomodule development is a low priority relative to 650 MHz cavities and our SRF work at other frequencies –325 MHz cryomodule for PXIE and associated development work will come first –1.3 GHz program to assemble, install and operate ILC-type cryomodules CM-2 (type 3+), CM-3 and CM-4 (both type 4) with electron beam will continue –650 MHz cryomodule will remain in a conceptual design stage for a few years –Cryomodule design will combine ideas from among the collaborating laboratories