Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 9 th of February, 2016 4 th Steering Committee.

Slides:



Advertisements
Similar presentations
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
Advertisements

1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 29 th of April, st Steering Committee.
Romanian Court of Accounts years of existence.
Project Manager: Manolo Clar, SCP/RAC Contact SCP/RAC: Enrique Villamore Phone. (+34) Sub-component 2.3: Environmentally.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
PRESENTATION IV Cycle of the Structured Dialogue.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
CAR PROJECT SIX MONTH WORKPLAN FITZ-ROY DRAYTON CRIMINAL ASSET RECOVERY PROJECT IN SERBIA.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Resident Twinning Adviser Skopje, 28 th of April, 2015 Activities and expected results.
Republic of Serbia BENCHMARKING AND SETTING ENVIRONMENTAL COMPLIANCE AND ENFORCEMENT INDICATORS Ministry of Science and Environmental Protection Directorate.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
2010 Workplan, Budget and Activity Reports Project Implementation Review Workshop and the second Steering Committee Meeting of the UNEP/GEF Project “Piloting.
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 6 th of November, 2015.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
Twinning SR07-IB-EN-02 Funded by the European Union Twinning on Natura 2000 Objectives and expected results 1 Funded by the European Union.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 30 th of October, rd Steering Committee.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Statistical Cooperation with ENP-South Twelfth meeting of the Management Group on Statistical Cooperation March 2010 Luxembourg Agenda item 6.1.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Твининг пројекат Европске Уније Успостављање механизма за спровођење ММR *** Twinning project Establishment of a mechanism for implementation of MMR Пројекат.
Component D: Activity D.3: Surveys Department EU Twinning Project.
Twinning Environmental Inspection: Progress, ideas and collaboration proposals Twinning project - MK 10 IPA EN (MK 10 IB EN 01) ENEA – ENforcing.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 22 nd of April, th Steering Committee.
Monitoring Visit to NatRisk Project
The CED’s & DED’s role in the Tenure & Promotion of Agents
Prof. dr. Giedrius Vanagas
BENCH-CAN Internal evaluation 2nd semester
THE EU CIRCULAR ECONOMY PACKAGE: THE GOVERNANCE?
UNECE Aarhus Convention Secretariat
Improved Regional Statistics in the Republic of Moldova
Improving the Garment Sector in Lao PDR:
Sri Lanka's Experience with ICAO TCB Projects
A Step by step guidance for permitting and inspection
PRESENTATION OF MONTENEGRO
First Partners’ Meeting
Legal Research Group (LRG)
EQAVET Annual Network Meeting
Prof. dr. Giedrius Vanagas
TURKEY MINISTRY of ENVIRONMENT AND FORESTRY
Marine Strategy Framework Directive (MSFD)
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
GBV survey: progress EUROSTAT 20 March 2018.
years of existence.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Commission Action Plan on Environmental Compliance and Governance
State of play endocrine disruptors
CEOS Workplan Steven Hosford LSI-VC-5 Agenda Item #1.3 February 2018
GUIDANCE ON (NEEI) AND NATURA 2000 ___________________________________________________________________ TERMS OF REFERENCE N2K GROUP.
Marine Strategy Framework Directive (MSFD)
Prof. dr. Giedrius Vanagas
Study on the Experience and Actions of the Main European Actors Active in the Field of Development Education and Awareness Raising (DEAR) Karina Chircu.
MIG-P orientation debate
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
Fitness Check of EU Freshwater Policy
5.b3 Monitoring & Reporting 2019
ECM Step Program Report November 2012
Water Director's Meeting December 2013, Vilnius DG Environment
Presentation transcript:

Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 9 th of February, th Steering Committee

OUTLINE Twinning Project ENEA – ENforcing Environmental Acquis 4 th quarter assessment (12 October 2015 – 11 January 2016) Programme for next 6 months (12 January – 11 July 2016) Addendum 2 Quarterly Report 4 Operative Side Letter 5 Outputs delivered to Steering Committee

Coordination Twinning Project ENEA – ENforcing Environmental Acquis  Meetings: multiple, within missions, with stakeholders, including Inspection Council Info exchange continues Main outputs & conclusions so far communicated and forwarded 4 th QUARTER:  Coordination with TA project supporting local level & Twinning IED Coordination meeting organised by MoEPP  sharing & review of relevant docs E-inspection software team  communicate with SEI Coordination with training programme of TA project Mutual participation in workshops of Twinning & TA in November & December

Communication Twinning Project ENEA – ENforcing Environmental Acquis  Website:  SEI banner now visible in MoEPP’s website  First promotional video published online  Estimate of visibility materials to be prepared in following months 4 th QUARTER:

Progress vs. Work Plan Twinning Project ENEA – ENforcing Environmental Acquis 4 th QUARTER:

Progress vs. Work Plan Twinning Project ENEA – ENforcing Environmental Acquis Good 4 th QUARTER:

Activities Twinning Project ENEA – ENforcing Environmental Acquis 4 th QUARTER: October (starting 12 th )  Steering Committe 3  Activity 1.3, mission 3: preparation of training materials  RTA Training in Brussels, October  Activity 1.2, mission 7: factsheets for industrial sectors  Activity 1.2, mission 4: last mission for general inspection manual  Activity 1.2, mission 5: check lists for some waste streams

Activities Twinning Project ENEA – ENforcing Environmental Acquis 4 th QUARTER: December November  Updates to Addendum 2 upon request of CFCD  Activity 2.1, mission 6: other supporting materials & training on planning (IRAM)  Activity 3.1, follow-up of mission 1: BPMS assessment & 1 st recommendations  Draft Addendum 2 & meetings with Inspection Council  Activity 2.2, mission 5: 4 one-day workshops on inspection cycle  Activity 2.1, mission 4: workshop & 1 st draft of Law for Inspection on Environment  Activity 1.2, mission 10: 2 nd mission to finalise IPPC/BAT guidelines  Activity 1.2, mission 8: 2 nd mission to finalise factsheets for industrial sectors

Activities Twinning Project ENEA – ENforcing Environmental Acquis Main outputs  SEI’s BPMS assessment & first proposals for next steps  Trainings on IRAM & Inspection Cycle  SEI - Twinning website  Draft sector inspection checklists & factsheets (12 sectors)  Inspection manual 4 th QUARTER:  Workshop & draft Law for Inspection on Environment  Draft proposals for indicators to evaluate inspectorate & inspectors

Activities Twinning Project ENEA – ENforcing Environmental Acquis Other outputs  Addendum 2  Translation of Spanish templates for multiannual insp. plan & annual programme  First promotional video in FIIAPP’s web 4 th QUARTER:

Participation BC experts Twinning Project ENEA – ENforcing Environmental Acquis 140 BC participants in meetings held in missions  A lot of drafting (to continue until February 2016) 4 th QUARTER:

Expenditures Twinning Project ENEA – ENforcing Environmental Acquis In 4 th quarter ~ 19 % of activities’ budget As planned Savings in flight tickets 4 th QUARTER:

Twinning Project ENEA – ENforcing Environmental Acquis Inspection Council activity should get the attention of EC QUARTERLY REPORT Central planning & control of inspectors  new Law should come into force Addendum 2: training  needs urgent endorsement Inspection Council should address Twinning docs sent, to align to EU best practices  Paragraph slightly reformulated Overload in planning & reporting, evaluation of inspectors with financial penalties...

Twinning Project ENEA – ENforcing Environmental Acquis QUARTERLY REPORT Managers in SEI, MoEPP, CFCD, DEU & SEA should continue pushing for a change in Law for Insp. Supervision Review & implement recommendations for improvement  2 nd update: deleted recommendation about E-inspection project, as it was cancelled

PROGRAMME NEXT 6 MONTHS February  Activity 1.2, mission 12: 2 nd mission to finalise leaflet operators & comm strategy  Activity 1.2, mission 11: 1 st mission leaflet operators & communication strategy  Activity 3.1, mission 2: proposals for BPMS improvement January  Activity 2.1, start of mission 8: control & remediation of old polluted sites  Activity 1.2, start of mission 6: 2 nd mission for check lists waste streams  Steering Committee 4  Activity 2.1, mission 7: other supporting documents Twinning Project ENEA – ENforcing Environmental Acquis

PROGRAMME NEXT 6 MONTHS  TRAINING Twinning Project ENEA – ENforcing Environmental Acquis March June April-May March-May April-May July

PROGRAMME NEXT 6 MONTHS Twinning Project ENEA – ENforcing Environmental Acquis April  Activity 2.2, mission 6: training based on inspection to pilot installation (region 3) March  Activity 1.3, mission 7: 3 one-day trainings on comm. skills & team building  Activity 1.3, mission 4: 2 two-days trainings on industrial processes (regions 1 & 2)  Activity 1.4, mission 3: study visit to The Netherlands  Activity 1.3, mission 6: training based on inspection to pilot installation (region 1)  Activity 1.3, mission 5: 2 two-days trainings on industrial processes (regions 3 & 4)

PROGRAMME NEXT 6 MONTHS Twinning Project ENEA – ENforcing Environmental Acquis  Updated project’s brochure May  Activity 2.2, mission 7: training based on inspection to pilot installation (region 2)  Activity 1.3, mission 8: 3 one-day trainings on comm. skills & team building April  Activity 3.1, mission 3: training on use of IRAM software  Steering Committee 5: 22 nd April  Activity 3.1, mission 4: further work on BPMS (to be defined in missions )

PROGRAMME NEXT 6 MONTHS Twinning Project ENEA – ENforcing Environmental Acquis  Activity 2.1, mission 10: second training on sampling & monitoring June  Activity 2.1, mission 9: first training on sampling & monitoring  Activity 2.2, mission 7: training based on inspection to pilot installation (region 4) July(until 11 th )  Closure event

OPERATIVE SIDE LETTER 5 Twinning Project ENEA – ENforcing Environmental Acquis  Side letter 10: expert for mission flights for act. 1.2  Explicit approval of OSL is very welcome  Included Marc du Maine in act. 1.3

COMMENTS TO OUTPUTS DELIVERED TO ST.C.? Twinning Project ENEA – ENforcing Environmental Acquis & – 12 sector & waste inspection checklists – Guidance on “mirror code waste” classification – Issues to comply with EU legislation on soil protection – Guidance on BAT on storage of hazardous and non-hazardous waste – Indicators to evaluate inspectors & Inspectorate – BPMS assessment and first proposals for next steps – Report related to the draft Law, and Table of Concordance – Procedure & minutes template for small incident/accident – Draft Law for Inspection on Environment – IRAM’s users guide

ADDENDUM 2 Twinning Project ENEA – ENforcing Environmental Acquis All your support is needed! Need for urgent endorsement  Study tour in April  participation of RTA Assistant and of 11 th participant  Training missions in March  RTA affected

Thank you very much ! Благодарам многу! Twinning Project ENEA – ENforcing Environmental Acquis