Outage of Generator Transformer due to High DGA. BRIEF HISTORY 200 MVA 400 kV GT erected at site. After satisfactory pre-commissioning checks GT was successfully.

Slides:



Advertisements
Similar presentations
Inspection & Preventive maintenance of breakers
Advertisements

Case Studies Task Force IEEE C Workgroup Meeting Milwaukee, WI.
New Frontiers of DGA Interpretation
ADX 150 – Engine Repair ADX 170 – Climate Controls
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge) CABLES, INSULATION RESISTANCE.
What is a fastener? A device to locate or hold parts
Oxyacetylene Torches.
1 HVACR316 – Piping Torches, Tanks, and Tips. 2 Soldering Basics Soldering is a process used to join piping and tubing to fittings. It is used primarily.
TESTING, MAINTENANCE & PROTECTION OF DISTRIBUTION TRANSFORMERS
GENERATOR PROTECTION.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
"AIR COOLER" Heat Exchanger
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
Electrical Measurement Methods I
Head (Project & Service)
S. Bhattacharya Manager - Substations Department POWER TRANSFORMER REFURBISHMENT.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Propeller Shaft survey
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Magnetic circuits of transformers. Magnetic circuits of transformers - assembly Obtuse layout (no-overlapping) easy assembly for small-sized transf. disadvantages:
Transformer.
Cooling of Transformer
TESTING AND COMMISIONING
Chapter 2 Transformers.
INTRODUCTION Definition:
Motor Testing (Motor Only)
Maintenance of Machine tools
ON LINE TRANSFORMER OIL REGENERATION PROCESS OF GT-8
Secondary Ignition Will need crossfire demo 11/2001VHS Auto2.
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
Note location of different length bolts
Welcome to my Presentation On Transformer. Presented By Emon Arifin Shakil ID#
Transformer condition assessment with an integrated test van
PRESENTED BY Gupta.Deepakkumar.R ( ) Condition Monitoring of Transformer (The heart of Power System)
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.
Transformer.
TAN DELTA TEST FOR POWER TRANSFORMERS
Md.Hamidul Haque ID: Prog:BSEEE SEC:E/3 International University of Business Agriculture and Technology (IUBAT )
33/11 KV Sub Station Santosh S. Kamble J.E ALDC, Ambazari MSETCL, Nagpur.
SWEEP FREQUENCY RESPONSE ANALYSIS AS A DIANOSTIC TOOL TO DETECT TRANSFORMER MECHANICAL INTEGRITY by:Luwendran Moodley Brian de Klerk ETHEKWINI ELECTRICITY.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
HNC/D Engineering Science
Dissolved Gas Analysis
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Plating Cell Considerations/ Proper Cell Design,
Doble Power Factor Bushing Test
ONLOAD TAP CHANGING TRANSFORMER
dry-type transformers
WELCOME.
Testing of Transformers
Power Transformers- Economics of Refurbishment vs Replacement
MANUFACTURING PROCESS OF TRANSFORMERS
CIGRE SC B5 COLLOQUIUM CALGARY
A presentation on Measurement of Winding Resistance and Insulation Resistance of 3 Phase 11 kV/ 433 V, 16KVA Oil cooled type Transformer PRESENTED BY:
“MUON” Collaboration meeting
Fulfilled the student of group ФЭ14-01B Zhuk Aleksey
Alexander Dierks – Alectrix (Pty) Ltd, South Africa
Alabama Section Meeting IEEE
المحولات Transformers
SB Packing Automatic Downpuller Power Unit
OUTLINE Combustion Chamber Deposits
Plasma Cleaning Safety Presentation
OIL DISTRIBUTION TRANSFORMERS OIL DISTRIBUTION TRANSFORMERS Presented By 1 Dr. Eng. Adel Abdel-Twab Farag.
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Poster ID: FIP/P7-26: Preventive measures to avoid electrical arcing incidences in SST-1 PF current leads As a preventive measure to mitigate arcing inside.
ELECTROSTATIC PRECIPITATOR
SHELL FORM TRANSFORMERS Moscow - November 2018
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Instruments & Electrical Measurements Lecture 4
Isolation Link Operation
Presentation transcript:

Outage of Generator Transformer due to High DGA

BRIEF HISTORY 200 MVA 400 kV GT erected at site. After satisfactory pre-commissioning checks GT was successfully commissioned This GT was commissioned along with other GTs and was under full load operation for one year. During DGA monitoring some of the critical fault gases were showing high concentration. Outage of GT was taken for investigation. Following actions completed to diagnose the fault.

DGA monitoring during operation Date/ gases (ppm) H2CH4COCO2C2H4C2H6C2H2O2 (%)N2 (%)TGC (%) DGA interpretation :- High concentration of Hydrogen (H2) gas. Acetylene (C2H2) increased after August 2011 to 14 ppm (rate of rise 1.3 ppm per day). All other fault gases are within limits. Nitrogen (N2) & Oxygen (O2) and total gas content (4.6%) are also within reasonable limit. Sudden rise in acetylene gas during full load operation necessitated internal inspection.

Low Voltage Testing of GT after Shut Down S.N.DescriptionObservationRemarks 1.Ratio, resistance and magnetizing current on HV & LV windings, IR values. Results found satisfactory. All the results matching with pre-commissioning and factory results. 2.Tan delta and capacitance test on 420kV bushing / pF Results are OK No appreciable change in the parameters. Bushing is healthy. 3.Tan delta and capacitance test of windings HV-Earth 2.06%, LV- Earth 0.64% & HV-LV 0.29% HV to earth values are very much on higher side. 4.BDV of tank oil Diverter tank 65kV 28kV Main tank oil OK but OLTC oil showing deterioration. 5.Isolation of Core Clamping & Core laminations w.r.t. tank/earth Isolation meggered better than 500 meg. Ohm Isolation is satisfactory.

Internal inspection S.NDescriptionObservationRemarks 1.Wall shunts, yoke shunts connections. Connections & yoke shunts isolation OK Shunts found healthy. 2.HV lead and copper tube with braid connection. Lead & copper braid connection found intact. No abnormality noticed. 3.Locking beam of end frame on HV side. One of the bolt of cross beam HV side found deposited with carbon particles. No heating/ melting marks noticed. Deposited particles removed by oil washing and cleaning. 4.General inspection of tank bottom Metallic soot's found on the bottom tank. Some of them found to be magnetic. 5.OLTC leads and bevel gear assembly. All the leads of selector and diverter contacts found in tact. Top gear assembly found cracked. Ingress of moisture in diverter through gear.

Carbon particles deposit on bolts & beam

Damage of upper gear body

ACTION TAKEN Thorough cleaning of active parts and rinsing with hot processed oil. Top OLTC gear replaced. OLTC diverter taken out & overhauled. Oil replaced. Boxing of GT for vacuuming with new gaskets. Desired dew point of GT achieved after three cycles of vacuuming and N2 purging. Hot and processed oil filled and circulated to achieve BDV > 75kV and moisture <8ppm.

Transformer testing All the low voltage test including tan delta completed and values found within limit. Tan delta / capacitance of HV winding to earth improved from 2% to 0.342% and 5793pF. GT commissioned and all the parameters including DGA found within limit. Acetylene gas content was found within 0 to 3.19ppm but stabilized. GT operating satisfactorily.

Conclusion Sudden increase of C2H2 gas was due to minor arcing outside the active part i n presence of metallic soot which later burnt out. OLTC oil got contaminated due to moisture ingress leakage through crack in upper gear unit. High tan delta values of HV winding was due to OLTC. Transformer commissioned after replacement of OLTC gear and is operating satisfactorily.

Feed Back DGA problem was attributed to improper cleaning of pipe work during erection of transformer. OLTC upper gear body cracked due to improper handling and fitting during erection. Thorough cleaning of bottom tank & pipe work during erection. Rinsing of core & winding before boxing. Damage of OLTC fittings like upper gear and OLTC head cover to be examined and replaced them if required. OLTC oil BDV to be checked six monthly and to be replaced if found deteriorated.