Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.

Slides:



Advertisements
Similar presentations
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Advertisements

Adherence with Regional Criteria WECC Reliability Policy Issues Committee Meeting February 19, 2009 Michelle Mizumori Director of Market Operations Interface.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Economic and Level of Service Impacts Resulting from the Annexation by SMUD of PG&E’s Service Territories in Yolo County April 5, 2006.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
1 Eric T. Whitley Selected Relevant Experience Background Eric T. Whitley President & CEO 1831 Iron Point Road, Suite 140 Folsom, CA Tel: (916)
Transmission’s Critically Important Role in Connecticut’s Energy Future David H. Boguslawski Vice President - Transmission Northeast Utilities Service.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
California Energy Commission Workshop Nuclear Power Plant Issues
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Energy Production and Use in California Source: California Energy Commission
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
By: Ed Flippen, Partner, McGuireWoods LLP, and Lecturer at the University of Virginia School of Law and Duke University School of Law US Electric Deregulation.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Overview of WECC and Regulatory Structure
Status Report for Critical Infrastructure Protection Advisory Group
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
California’s Renewable Energy Transmission Initiative Anne Gillette Renewable Energy Policy Analyst California Public Utilities Commission August 12, 2008.
Updated 1/28/2011.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
1.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Electric Service Options April 19, 2002 Ken Mellor and Mike Bell.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Azusa Utility Board Meeting January 28, Power Resources Division Monthly Report Power Resource Update Power Consumption Comparison Wholesale Market.
Overview Market Opportunities Market Challenges
LNBA Subgroup: Avoided Transmission Value
City and County of San Francisco Local Agency Formation Commission
Damitha Kumarasinghe Director General
San Francisco’s Community Choice Program
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Natural Gas Infrastructure Assessment
Massachusetts Electric Restructuring Roundtable
Operating a modern renewable-based grid
MIC Committee Discussion
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
SunZia Project Description
The Need for Compensatory Standby Rates
New England Resource Adequacy
Strategic Planning Process
Strategic Planning Process
MIC Committee Discussion
DISTRIBUTED GENERATION in Massachusetts
Presentation transcript:

Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002

Flynn & Associates2 Critical Muni Electricity Issues  Transmission Access and Congestion Cost Mitigation  California Independent System Operator and Federal Energy Regulatory Commission Market Design Proceedings  Utility Interconnection Agreement Alternatives  Energy Supply Alternatives  Energy Price Risk Management

Flynn & Associates3 Flynn & Associates can help SF LAFCO address critical electricity issues Extensive experience providing strategic advice to senior management and policy makers –Barry Flynn has been a consultant for over 15 years (6 years for CCSF). Previous experience includes 10 years as director of a municipal electric utility, 8 years as transmission planner, 3 years as president of a renewable resources development firm –Doug Boccignone has been a consultant for over 8 years. Previous experience includes 3 years in municipal resources planning, and four years in energy origination Experience in developing public power joint action agencies

Flynn & Associates4 Specific Flynn & Associates’ Experience Represent Bay Area Public Power entities on critical locational marginal pricing issues Represent CCSF in Bay Area transmission alternatives evaluation –Permitting under way for new 230 kV line to San Francisco by 2005 –2800 MW Bay Area transmission upgrade study Represent CCSF as a member of ISO Planning Standards Committee –Developed Bay Area generation outage standard that resulted in additional transmission into Bay Area Participated in ISO Stakeholder process and assisted CCSF legal counsel to reduce Bay Area transmission access costs

Flynn & Associates5 Specific Flynn & Associates’ Experience Represented CCSF in CPUC December 8, 1998 outage investigation –Resulted in improved outage restoration procedures –Special Protection Scheme to limit the amount of San Francisco load dropped and speed restoration following catastrophic events Advised CCSF regarding Potrero 7 power plant interconnection, reliability and other transmission and supply issues Represented CCSF in annual PG&E grid planning efforts Advised CCSF on existing Hetch Hetchy/PG&E transmission agreement