FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.

Slides:



Advertisements
Similar presentations
Parliamentary Portfolio Committee Presentation Annual Report 2012.
Advertisements

CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
INPO Update CMBG Meeting June 2013
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Vermont Yankee Presentation to VSNAP 7/9/12 VY/Entergy Fukushima Response Bernard Buteau.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
“Alberta - A Province Prepared” 2008 STAKEHOLDER SUMMIT.
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Risk and Emergency Management Division Southside Hampton Roads Hazard Mitigation Plan.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
IAEA - Department of Nuclear Safety & Security
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
LESSONS LEARNED IN DEVELOPMENT OF SAFETY CULTURE FOR REGULATORY BODIES
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
HAZARD MITIGATION PLAN UPDATE LOCAL EMERGENCY PLANNING COMMITTEE.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Breakout Session V: Mitigation Strategies for Beyond Design Basis External Events (NTTF Recommendation 4.2) Fukushima Regulatory Response Workshop April.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
Hazard Mitigation Plan Update Lancaster County Final Public Meeting April 26, 2013.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
The March 2011 Earthquake and Tsunami in Japan: A Nuclear Perspective Mary Lou Dunzik-Gougar, PhD Associate Chair of Nuclear Engineering and Health Physics.
SNC Severe Accident Management NEI Workshop 4/5/12 David Gambrell – Director, Severe Accident Management
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
City of Bixby, Oklahoma 2008 Multi-Hazard Mitigation Plan Update
Defense-in-Depth and Mitigative Measures
Occupational Radiation Protection during High Exposure Operations
Spent Fuel Pool Instrumentation NRC Order EA
Joe Bellini, Exelon Drew Miller Exelon April 6, 2012
Industry Guidance on Part 21 Evaluation and Reporting
Ryan Cox, Mitigation Planning Supervisor, NC Risk Management
Ensuring Nuclear Safety Culture in Ghana: Regulatory Perspective
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC Cyber Security Regulatory Overview
Armenia Training and Tutoring Feedback
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Presentation to the EPREV Lessons Learned Workshop
Factors to Consider when Designing a Reliable Power Grid
Research and Test Reactor Safety: The Regulatory Perspective
Bringing safety performance of older plants on par with advanced reactor designs International Conference on Safety Demonstration of Advanced Water Cooled.
Factors to Consider when Designing a Reliable Power Grid
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
BWROG – Emergency Procedures and Severe Accident Guidelines (EPG/SAG) Revision 4 Highlights Ken Klass (Talen Energy), Lesa Hill (Southern Nuclear) & Phillip.
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012

Overview  Background  FLEX Objectives  Relationship to Tier 1 Activities  FLEX Mitigation Strategies  Site Assessment Process  Status & Steps Forward  Q&A 2

Background  Accident at Fukushima Dai-ichi involved a beyond design basis earthquake and tsunami  Order requires licensees to develop “Mitigation Strategies For Beyond Design Basis External Events” – Recommendation adopted from industry “FLEX” proposal, in lieu of enhanced B.5.b 3

What is FLEX? Provide means to prevent fuel damage (core and SFP) while maintaining containment integrity in beyond design basis external event conditions involving: Extended Loss of AC Power Loss of Ultimate Heat Sink Objective: Establish an essentially indefinite coping capability by relying upon installed equipment, onsite portable equipment, and pre-staged offsite resources 4

Diverse & Flexible Coping Capability (FLEX) Protection of Plant Equipment Prevention of Fuel Damage Design Basis External Events SBO Coping Capability SAMGs Emergency Plans Design Basis External Events SBO Coping Capability SAMGs Emergency Plans Increased Defense-in- Depth Diverse & Flexible Coping Strategy (FLEX) Emergency Response CurrentCurrent plus FLEX 5

What does FLEX address? Prevention of fuel damage SAMGs address fuel damage state At power conditions vs outage conditions Highest heat load Outage conditions Short duration Many different plant configurations Equipment will be available to deploy for outages 6

Guidance Document Status  Revision A3 is out for comment  Revision A4 will be distributed April 12  Industry concurrence will be sought to submit to NRC for review  Submit Revision B to NRC end of April  Review through series of public meetings in May  Issue guidance for industry use August 31 7

Relationship to Other Tier 1 Activities 8

FLEX Mitigation Strategies  Provide diverse, flexible means to prevent fuel damage (core and SFP) while maintaining containment function  Employs a three phase approach: 1.Initially cope by relying on installed plant equipment, 2.Transition from installed plant equipment to onsite FLEX equipment, 3.Obtain additional capability and redundancy from offsite equipment until power, water, and coolant injection systems are restored or commissioned. 9

Implementation Guide Framework 10

Step 1 – Baseline Coping Capability  Establish a baseline coping capability for Extended Loss of AC Power (ELAP) and Loss of Ultimate Heat Sink (LUHS)  Address all three phases of coping. Will require: – Enhanced procedures/guidelines – Implementing design changes – Procurement of equipment – Contract for provision of offsite resources 11

Step 2 – External Event “Stress Tests”  Process for identifying potentially applicable hazards: – Extreme seismic events, – Extreme external flooding, – Extreme storms such as hurricanes, high winds, and tornadoes, – Extreme snow, ice, and cold, and – Extreme heat.  Where applicable, each site addresses: – Protection of FLEX equipment, – Deployment of FLEX equipment, – Procedural interfaces, and – Utilization of offsite resources. 12

Step 3 – Implementation Plan and Programmatic Controls  Provision of at least N+1 sets of portable onsite equipment stored reasonably protected from applicable external events  Procedures and guidance to support deployment and implementation  Programmatic controls addressing: – Quality attributes – Equipment design – Maintenance and testing – Training – Staffing 13

Status & Steps Forward  Fourth revision of guidance nearly complete for broad industry review  Goal: Draft guidance document to NRC by the end of April  NRC interactions to refine guidance for endorsement in Interim Staff Guidance (ISG)  NRC ISG issued for public comment in July  Industry workshop during public ISG comment period  NRC ISG endorsing final NEI guidance document issued by August 31,

QUESTIONS? 15