BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL

Slides:



Advertisements
Similar presentations
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Advertisements

Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
GoetzFIELDS iCDR - TDS Solar Probe Plus - FIELDS Instrument CDR Time Domain Sampler TDS Keith Goetz University of Minnesota 1.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
24Oct2013 D. Seitz SPP FIELDS RFS Analog Peer Review 24OCT
SPP FIELDS Preamp Power Requirements 01DEC2012 D. Seitz.
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr , 2004 Ground Magnetometer David Pierce UCLA.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
“Mini Rotary Alpha” Experimental Setup. Motor Control Electronics Balance Plate Frame Motor Battery Capacitor Batteries Motor Capacitor Encoder Frequency.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
BonnellSPF AEB CDR PEER REVIEW – RESPONSES Solar Probe Plus FIELDS Antenna Electronics Board AEB I-CDR Peer Review Responses (rev A, 13 Jan 2015) J. Bonnell.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
SPP-FIELDS Team Mtg - 13 Dec SPP-FIELDS Slow Sweeps, Auto Bias, and All That J. W. Bonnell, UCB SSL Past experience -
19 Nov SPP-FIELDS Antenna Electronics Board (AEB) CDR Peer Review J. W. Bonnell, D. N. Seitz Space Sciences Laboratory UC Berkeley
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Pre-Ship IIRT Telecon EFI 1 Telecon, Dec. 5, 2006 THEMIS Pre-Ship IIRT Telecon EFI Preamp Current Consumption John Bonnell EFI Lead University of California.
Power Supply. 2 Power Supply w/Line Conditioner The power supply is the heart of the Millenium System. It can support between 15 DCD boards (power for.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
Programmable Power Supply Characterization presentation Dec. 04, 2007 Gregory Kaplan Dmitry Babin Supervisor: Boaz Mizrahi.
PADME Front-End Electronics
Boom Electronics Board (BEB) Engineering Peer Review Oct
Solar Probe Plus – FIELDS SCM FM2 Instrument Pre-Ship Review
SPP-FIELDS Slow Sweeps, Auto Bias, and All That - UPDATE
Solar Probe Plus – FIELDS Main Electronics Package
Solar Probe Plus – FIELDS V1234 PA/Antenna Instrument Pre-Ship Review
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Solar Probe Plus – FIELDS Main Electronics Package
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
SPF MAG Quarterly Report – Feb 2015
Calorimeter Mu2e Development electronics Front-end Review
Solar Probe Plus FIELDS
SPP FIELDS Preamplifier
Solar Probe Plus FIELDS
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Main Electronics Package
Electric Field and Waves Instrument (EFW)
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Boom Electronics Board (BEB) EFW-EMFISIS E-Field I/F (EFW-EMF)
Boom Electronics Board (BEB)
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
Preliminary Design Review
Low Voltage Power Supply & Power Controller Board
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
Digital Sub-System Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Presentation transcript:

BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL 1

BonnellFIELDS iCDR – AEB Agenda 2 Antenna Electronics Board (AEB) Requirements and Specifications: –AEB1 and 2 in FIELDS – Interfaces and Functions. –Design Description – Specifications and EM Performance. Resources Engineering Model Testing and Verification Plans Parts and Materials Peer Reviews Schedule, Open Work, Readiness for Flight Issues

BonnellFIELDS iCDR – AEB AEB1 and 2 in FIELDS 3

BonnellFIELDS iCDR – AEB 4 LF Section Details: Biasing

BonnellFIELDS iCDR – AEB Performance Requirements (unchanged) 5 The AEB1 and AEB2 perform the following functions: Generate independent +/- 15-V floating power (PA LF and HF input buffer). Generate regulated +/- 5-V fixed power from +/- 6-V analog (PA HF backend). Generate FGND driver from low-passed LF PA output. Generate BIAS, STUB, and SHIELD biasing outputs from low- passed LF PA output and DAC-controlled DC offset voltage. Control PA1..4 R_BIAS relay driver signals. Control V5 internal heater and power switching. Generate current, temperature, and DAC output voltage housekeeping for DCB/TDS readback. Distribute LF science signals: –from PA1..5 to DFB (AEB1: 1, 2, 5; AEB2: 3, 4). –From PA5 to TDS (AEB1 only).

BonnellFIELDS iCDR – AEB EM AEB (AEB1/SN002) 6

BonnellFIELDS iCDR – AEB Performance Requirements 7 The AEB1 and AEB2 perform the following functions: Generate independent +/- 15-V floating power (PA LF and HF input buffer). Generate regulated +/- 5-V fixed power from +/- 6-V analog (PA HF backend). Generate FGND driver from low-passed LF PA output. Generate BIAS, STUB, and SHIELD biasing outputs from low- passed LF PA output and DAC-controlled DC offset voltage. Control PA1..4 R_BIAS relay driver signals. Control V5 internal heater and power switching. Generate current, temperature, and DAC output voltage housekeeping for DCB/TDS readback. Distribute LF science signals: –from PA1..5 to DFB (AEB1: 1, 2, 5; AEB2: 3, 4). –From PA5 to TDS (AEB1 only).

BonnellFIELDS iCDR – AEB AEB Requirements/Specs (1 of 2) AEB Input Signal Characteristics (Preamp LF Output) –DC voltage level: up to ± 60Vdc w.r.t. AGND: ± 60 Vdc at full bias offsets. up to +/- 100Vdc at reduced bias current and voltage levels –AC voltage level: up to ± 10V w.r.t. floating ground (FGND): ± 15V floating supply and Preamp LF design support up to ± 13 V w.r.t. FGND. Floating Ground Driver –Input: LF Preamp signal –Bandwidth: 450 Hz –Output voltage level: ± 60Vdc w.r.t. AGND –Floating supply rails: ± 15Vdc Bias, Stub, Shield Output Drivers (Bias and Box on V5) –Reference Input: LF Preamp signal –Bandwidth: 450 Hz –Output voltage level: Vref ± 40Vdc (max, programmable) w.r.t. AGND –DAC resolution: 12-bit (~.025%) 8

BonnellFIELDS iCDR – AEB AEB Requirements/Specs (2 of 2) Bias, Stub, Shield Drivers (Bias and Box on V5) – Output Currents –Bias Range Control (AEB+PA, V5 is lowest range only): LOW:+/- 802 nA; covers 1 AU ops nA CBE. MED:+/- 14 uA; covers 0.25 AU ops - 6 uA CBE. HIGH:+/- 414 uA; covers perihelion ops - <=184 uA CBE. –PA1..4 Stub Currents: 60 nA (1 AU) ~ 0 uA for Science Ops (in shadow) –PA1..4 Shield Currents: 200 nA (1 AU) 100 uA (9.5 Rs) –V5 Box Currents: ~40 nA (1 AU) ~ 0 uA for Science Ops (in shadow) 9

BonnellFIELDS iCDR – AEB Resources Mass: 362 g (416 g NTE) –PWA only – does not include MEP frame and EMI shield. –Does not include staking and conformal coating. Power (dissipated on PWA): –AEB1: 460 mW nominal CBE (530 mW NTE). –AEB2: 270 mW nominal CBE (310 mW NTE). –Includes power dissipated in floating supply generation. –Does not include power dissipated at PAs. 10

BonnellFIELDS iCDR – AEB EM Testing Bench (Functional) Testing: –Safe-To-Mate (isolation/continuity) –Power Generation, Regulation, and Consumption (passive loads, incl. bypass caps; voltage margin; min/max load) –DAC and Relay Commanding –AC Response (gain and phase vs. frequency) –DC Response (FGND and bias output vs. LF_in and DAC setting) –Scripted AC and DC Response testing already developed for use in FM Functional Testing. Integrated Testing: –Safe-to-Mate (isolation/continuity; LNPS supply levels; AEB output levels) –Power Consumption (with active loads (PA’s); nominal and maximal signals). –DAC and Relay Commanding (PA+AEB biasing tests). –Verification of AC and DC response in integrated configuration (PA+AE B+LNPS, full FIELDS (1,2, or both)) 11

BonnellFIELDS iCDR – AEB Bench Testing - Setup 12 AEB2 AEB1 PA4 BOB PA3 BOB Bench Supply I/F (LNPS Sim) Digital Ctrl/Data I/F (DCB/TDS Sim) BOB = Break Out Board PA LF In/FGND, Bias Out I/F

BonnellFIELDS iCDR – AEB I&T Testing – Setup (PA+AEB1+DCB+DFB+LNPS1, 31 Oct 2014) 13 Safe-to-Mate. Power Consumption – as expected. LF/MF/HF response check – as expected (LF and MF termination off-nominal). PA/AEB Bias ranging and setting (HSK and Science readback) – as expected.

BonnellFIELDS iCDR – AEB Reviews 14 Oct FIELDS I-PDR Peer Review –6 items, all closed. Dec FIELDS I-PDR –1 item, all closed. Apr AEB EM Layout Review –12 items, all closed prior to fabrication and assembly. Nov FIELDS I-CDR Peer Review –5 items, responses complete and available on FIELDS ftp site: –ftp://apollo.ssl.berkeley.edu/pub/FIELDS/1_Management/1.7_Meetings/PhaseC_ _PRE _AEB_Peer_Review/ftp://apollo.ssl.berkeley.edu/pub/FIELDS/1_Management/1.7_Meetings/PhaseC_ _PRE _AEB_Peer_Review/

BonnellFIELDS iCDR – AEB Parts And Materials PARTS –Approvals: All parts conditionally approved by Parts Control Board (Nov 2014). Single-Event Transient (SET) effects analysis on MAX256 to be completed. –Derating and Stress Analysis: Complete - no issues found for worst-case board temperatures. –Procurement: FM procurement underway - See SMA-Parts for details. 15

BonnellFIELDS iCDR – AEB Schedule: Open EM Work, Transition to FM 16 Open EM Work: –Board-Level Thermal Testing: –PA+AEB1/2 – power, noise, gain, phase, DC offset changes (FGND, BIAS, STUB, SHIELD) –FIELDS TVAC Testing: –FIELDS1/2 MEP TVAC tests to verify board ops temperature predicts. –Support of PA1..4 and V5 Mechanical TVAC testing as needed. Transition to FM: –Feb to Mar 2015 – EM to FM Design Updates (schematic, layout, etc.) –Apr 2015 – FM AEB Pre-Fabrication Review –Apr to Jul 2015 – FM AEB Fab, Assy, and Test –27 Jul 2015 – Delivery of FM AEB1/2 to FIELDS I&T.

BonnellFIELDS iCDR – AEB Backup Slides (AEB) 17