Issues involved in supplying power to mining projects – a Rio Tinto perspective International Congress – Energy Day Lima 3 July 2012 Mark Grenning – Chief.

Slides:



Advertisements
Similar presentations
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Advertisements

COPENHAGEN – KEY TO CLIMATE INVESTING
A 2030 framework for climate and energy policies Marten Westrup
Brazil + Russia + India + China + South Africa. What are BRICS? BRICS is a term made by the economist Jim O´Neal when he made his thesis of future investment.
The challenge in UK power generation Steve Riley, Executive Director, Europe London, 3 December 2010.
INVESTMENTS IN POWER SECTOR
Dokumentname > Folie 1 > Vortrag > Autor Potentials for Renewables in Europe Wolfram Krewitt DLR Institute of Technical Thermodynamics Systems.
Outcomes of the Africa Regional Preparations for Rio+20 Regional Commissions Side-Event Second Rio+20 Intersessional Meeting New York, USA, 15 December.
2ND INTERNATIONAL COAL CONFERENCE SECURING FUTURE NEEDS 1.
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Framework for K-Farm Green Value Chain Production of Carambola
1 Providers Perspective on the Future Bill Levis President, PSEG Power Bill Levis President, PSEG Power.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
The Future of the Uranium Market Feeding Asias Rapidly Growing Need Milt Caplan, President Dr. Terry Thompson, Senior Advisor MZConsulting Inc.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Gas and the wider energy market: an MED perspective David Smol Deputy Secretary Ministry of Economic Development 2004 New Zealand Petroleum Conference.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Steve Baker President Natural Gas in Ontarios Energy Mix Seeing The Bigger Picture.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Infrastructure and resource regions Ian Satchwell IM4DC/AAPF Infrastructure Forum Wednesday 20 March Supporting sustainable resources development.
Global Entrepreneurship and Small Business Management
Total Utility Management Services, LLC is committed to helping your organization make the best informed energy decisions with decades of cost-proven results.
Climate Change Mitigation in Developing Countries: South Africa Prepared for the Pew Center on Global Climate Change by Ogunlade.
UNFCCC Workshop on Innovative Options for Financing the Development and Transfer of Technologies September 2004 Private Sector Perspectives on Risk.
The Australian Renewable Energy Agency and the New Energy Course Argus Australia Power Generation Fuels 27 February 2013.
BI Marketing Analyst input into report marketing Report TitleElectricity in Botswana Report SubtitleCountry profile of power market trends and investment.
1 Establishing Efficient Marketplaces - lessons learned Presentation by: Kjell Asserlind APEx Annual Conference Cartagena, October.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Market4RES –the policy framework
Embedding Energy Management – Carbon introduction Insert site / company name and logo here Insert presenter/s names here This publication was funded by.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Energy for a low-carbon economy 11 November 2010 Presentation by Ernst Venter Executive General Manager Business Growth.
Promoting Resource Development and Energy Security in Australia Mr Greg Evans Executive Director – Coal Minerals Council of Australia 16 October 2014.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Energy supply and use in Australia
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
WORLD ENERGY INVESTMENT OUTLOOK
An overview of the Australian Mining Industry AMN, Thursday 10 October 2013.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
Future Global Trends – Resource security: How Sovereign Wealth Funds will benefit.
Viticulture– Carbon introduction Site / company name and logo here Presenter/s names here This is an Agrifood Skills Australia Ltd project developed in.
Creating shared value Joanne Farrell Global head – Health, Safety, Environment and Communities.
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
International Energy Markets Calvin Kent Ph.D. AAS Marshall University.
Ensuring the Energy, Environmental, and Economic needs of North America Canadian Energy Perspectives.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
The Role of Renewable Energy in Addressing Climate Change Australian Government Support for Renewable Energy Denis Smedley Director Renewable Energy Technologies.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Coal and Sustainable Development David Cain of Rio Tinto for the World Coal Institute UNECE Ad Hoc Group of Experts on Coal and Thermal.
1 The Surging Fortunes of Aluminium Oscar Groeneveld Sydney Mining Club December 1, 2005.
1 The Ugly, the Bad and the Good – an Alternative View on Electricity Liberalisation from a Large Industrial User Mark Grenning – Chief Advisor Energy.
© OECD/IEA 2010 Russian Annual Meeting of Energy Regulators Moscow, 1-2 April 2010 Investment in the power sector and regulatory challenges and practices:
BUILDING BRIDGES: RUSSIAN ALUMINUM IN A GLOBAL CONTEXT Vladislav Soloviov Chief Financial Officer Russia: Going Global? London, October 12-13, 2005.
NS4054 Fall Term 2015 North America Energy Trilemma.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
An embedded cogenerators response Andrew Carr
CAFE Baseline dissemination workshop 27/09/2004 Dr. Leonidas Mantzos E3M-LAB/ICCS NTUA contact: Energy projections as input to the.
Long Distance Transmission Grids for Renewables Sanjay Kumar
NS4054 Fall Term 2015 U.S. Energy Planning in a Period of Rapid Change.
Energy in Transition: Embracing Disruption Dr Liam Wagner Economics, Griffith Business School 5th IAEE Asian Conference, February 2016 Department of Account,
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
1 Office of the Chief Economist Australia’s role in meeting Asian energy demand growth Resources and Energy Economics Ross Lambie General Manager February.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Coal and Sustainable Development
REFLECTED IN JAMAICA’S ENERGY POLICY
New Zealand Aluminium Smelters Ltd Climate Change Approach
Presentation transcript:

Issues involved in supplying power to mining projects – a Rio Tinto perspective International Congress – Energy Day Lima 3 July 2012 Mark Grenning – Chief Advisor Energy Management

Presentation outline Some background on Rio Tinto Why energy is important to us What we look for in power markets The challenges of OECD and non-OECD countries Some specific examples of Rio Tintos approach 2

Who we are We are a leading global business delivering value at each stage of mineral and metal production We employ approximately 68,000 people in over 40 countries We fulfil vital consumer needs and improve living standards Our commitment to safety is fundamental to the way we do business Sustainable development is at the heart of everything we do Underlying earnings in 2011 were a record US$15.5 billion 3

Rio Tinto – a world leader in mining 4 Aluminium #1 in bauxite #2 in aluminium #3 in alumina Diamonds & Minerals #1 in titanium dioxide #2 in borates #5 in diamonds Copper #5 in copper #7 in molybdenum Energy #4 in uranium #6 in export coking coal #9 in export thermal coal Iron Ore #2 in seaborne iron ore #1 in seaborne salt 2010 data

Where we operate 5 Key Mines and mining projects Smelters, refineries, power facilities and processing plants remote from mine Aluminium Copper Diamonds & Minerals Energy Iron Ore Europe South America Australasia Africa Asia North America

>85% of assets in OECD 6 1 Other Asia mainly relates to assets in India and Oman. Total assets are calculated from information extracted from the consolidation schedules of the Company for the year ended 31 December 2011, with adjustments for non-controlling interests, cash, current and deferred tax receivables and derivatives total assets = US$95 billion US 7% Canada 25% 3% South America 5% Europe 6% Africa Australia/NZ 46% 1% Indonesia 2% Other Asia 1 5% Mongolia

Rio Tintos global project pipeline provides options to invest 7 Key Mines and mining projects Smelters, refineries, power facilities and processing plants remote from mine Countries where Rio Tinto operates Aluminium Copper Diamonds & Minerals Energy Iron Ore

Our energy footprint was significant in 2011 Energy Costs $USb Electricity & Steam3.0 Diesel1.7 Anodes & Fuel Oil1.3 Natural Gas0.3 Coal0.1 Total$6.4 Power Stations HydroCoalGas/ Waste Steam Diesel /Fuel Oil Total Capacity (MW) 3,9721, ,114 Generation (TWh) Based on equity ownership Based on 100% of managed operations Power Consumption Based on equity ownership TWh Total74.7 Purchased42.0 Self-generated: - Total - Sold to 3 rd parties

What we need is an active contract market: Long term contracts where prices reflecting long run generation costs Sharing the risk on fuel costs with active hedging markets available to consumers Pricing of monopoly poles and wires reflecting efficient, benchmarked cost levels High level of grid reliability and security Carbon cost reflecting the scope of international climate agreement and the carbon intensity of their generation source A gap between what large consumers need from electricity markets and what they tend to get in OECD countries 9 What we tend to get in OECD countries: Initially lower prices from market liberalisation replaced by rising prices Market power exercised by supply side Government owned participants pressured to maintain high dividends to their shareholders Government intervention to distort market eg retail price caps, mandatory renewables obligations Decreased reliability as we are seen as the most politically acceptable to be interrupted

Which can lead to a preference for self-generation 10 CRU forecasts (May 2012) continuing spread between purchased and self-generated power for aluminium smelting Source - Kelly Driscoll How power tariffs are causing the geographical centre of gravity to shift in primary aluminium smelting CRUs 17 th World Aluminium Conference May 2012

Rio Tintos approach in OECD countries varies Aluminium smelting favours self-supply or some control over power source Remote mining operations with low demand tend to be self supplied diesel but looking at some offsetting with renewables Iron ore operations in Australia Alumina refining in Australia Coal operations in Australia Copper mining and smelting in the USA 11

Our approach to electricity supply to new projects – irrespective of location Work closely with the mine project team to understand the demand profile Conduct a design workshop to look at options to minimise the energy/carbon footprint Examine supply options – existing grid? If yes what are its characteristics eg La Granja study – will it supply reliable competitive power? If no what fuel options for developing our own base load generation? If no grid or insufficient grid capacity how should the self-supply be structured eg should Rio Tinto build, own and operate or should it bring in an IPP or should there be some mix? It generally takes longer to build a power station than a mine 12

Important big picture issues in developing countries Improving the operational performance of the electricity sector Supporting the development of robust institutional and governance structures supporting overall energy strategy and operation of the market Providing independent analysis to ensure value based energy infrastructure decisions Facilitating the investment of private sector providers whether they be IPP or in country industries that are able to supply surplus self- generated power to the community Gradually reduce the high incidence of energy subsidies and support for cost based pricing wherever possible 13

In evaluating building generation facilities in developing countries we aim to set some boundaries 1.We are prepared to consider Joint development proposals with the local electricity authority on arms length commercial terms Selling spare output to local electricity authority at a price that maintains the economic viability of the power station Foster the local skill development in operating and maintaining power stations 2.But we wish to exercise caution to not: End up effectively displacing the host government as the energy supplier to all customers because we are not skilled to do so Be seen by the host government as an excuse not to build its own infrastructure, or Be seen by the host government as the interruptibility supplier ie that the mining company can be cut off at any time to make up for shortfalls elsewhere in the system 14

The example of the Benga Power Plant in Mozambique Rio Tinto purchased mining assets in 2011 Mine demand of MW, depending on development profile, requires new generation capacity Government owned electricity (EDM) entity does not have the balance sheet to provide, so Rio Tinto has to build capacity or facilitate a third party Benga Power Station business case – coal supply, export transmission capacity into the South African Power Pool, Rio Tinto PPA off-take, completed EIS, close to water supply Now running a process to select a Strategic Equity Partner to take over completion of the feasibility study, build, operate and be an equity participant Potential size of MW Stakeholder management eg Government is off-taker and has right to up to 20% equity 15