Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias.

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

Donald T. Simeon Caribbean Health Research Council
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Managing the Information Technology Resource Jerry N. Luftman
Fundamentals of Information Systems, Second Edition
Design, Implementation and Maintenance
SYSTEM ANALYSIS AND DESIGN
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
End HomeWelcome! The Software Development Process.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
Systems Analysis and Design
Systems Analysis and Design in a Changing World, Fourth Edition
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Systems Development Life Cycle
Chapter Sixteen Managing Network Design and Implementation.
MIS 7003 MBA Core Course in MIS Professor Akhilesh Bajaj The University of Tulsa Introduction to S/W Engineering © All slides in this presentation Akhilesh.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Software Development Module Code: CST 240 Chapter 6: Software Maintenance Al Khawarizmi International College, AL AIN, U.A.E Lecturer: Karamath Ateeq.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
Stages of Research and Development
Camera PDR/CD1 Planning 19 September 2008
Academic Affairs Budget FY18 Areas of Emphasis
EDENTON-CHOWAN SCHOOLS
Academic Writing Skills
Jay Elias1 1plus bits plagiarized from Steve Heathcote and others
Lessons Learned in Vendor Oversight
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
PSS Plans for Improved Reliability and Availability
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Alistair Walker Version 3 December
IEEE Std 1074: Standard for Software Lifecycle
Initiating systems development
Commissioning a project
(Additional materials)
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
COSMOS Status David Sprayberry, Sean Points & Jay Elias
KOSMOS Design Considerations
Civic Center Sports Field Study Session & Quarterly Update
Enterprise Content Management Owners Representative Contract Approval
Introduction to project accounting
System Development Life Cycle (SDLC)
Sustainment Reporting CADE Sustainment Reporting
Management Breakout: MREFC Budget Summary Victor L
Lockheed Martin Canada’s SMB Mentoring Program
Chapter 13: Systems Analysis and Design
Systems Analysis and Design
System Development Life Cycle (SDLC)
Mark McKinnon EVLA Project Manager
Chapter # 1 Overview of Software Quality Assurance
LCLS Undulator System Status and Schedule
How Do I Write a Good Technology Plan?
LCLS Undulator System Status and Schedule
SOFTWARE PROJECT MANAGEMENT KEY TOPICS
Executive Project Kickoff
EDENTON-CHOWAN SCHOOLS
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias

Pg 2 15 September 2015 ACTR Meeting Resources Overview Two types of SOAR funding: –NOAO “in-kind” contribution: Roughly equivalent to labor associated with baseline operations Includes some repair work, etc. Accumulated deficit (mostly) due to favorable exchange rates over last several years –Partner cash contributions: Cover non-labor operations costs Intended also to cover major repairs, improvements Accumulated substantial cash reserve – »Some external expenditures possible, but many projects require local staff »Available staff already over-committed »SOLUTION: SOAR Board has authorized support for additional ETS hires – nominally 2 FTEs through end of FY2018 – emphasis on electronics area but continued SW and ME support assumed

Pg 3 15 September 2015 ACTR Meeting ETS Labor Breakdown SkillFY15 budgetFY15 actualFY16 budget Optical Engineer Mechanical Engineer Drafting/Designer/Machinist Electrical Engineer Electronics Tech Software Engineer Total

Pg 4 15 September 2015 ACTR Meeting Project Priorities (Board List) On-going Projects: Completion of TCS upgrade –Need to define some additional scope in support of remote observing, Goodman spectrograph upgrades Goodman Red Camera –Negligible ETS resources involved Goodman acquisition camera – –Almost done – last round of tests, user documentation Re-definition of tip-tilt guider work – see later slides

Pg 5 15 September 2015 ACTR Meeting Project Priorities (Board List) M1 Aluminization –Scheduled for late CY 2016 – must meet this schedule to ensure availability of Gemini staff/facilities –Complex effort, requires careful planning (last done 2009) –Desire to make modifications (additions) to Gemini chamber to produce better coating (no Ag contamination) – verify feasibility now if we are going to meet schedule. –Planning is not resource-intensive but schedule cannot slip. Needs appropriate priority! –All-out effort once we start removing the primary mirror

Pg 6 15 September 2015 ACTR Meeting Project Priorities (Board List) Need for new coating – –Original M1 coating not consistent with fresh Al –2009 coatings have held up well (down <2%/surface) –M2, M3 are “good” Al but might as well re-do when we do M1

Pg 7 15 September 2015 ACTR Meeting New Projects (Board List) Charged by Board to perform a critical failure analysis of the facility –Intended to guide additional procurement of spares –Intended to identify upgrade projects aimed at reliability –Need to set up a technical working group to define methodology and start work Some approaches to CFA may be excessive for our needs/schedule/budget Focus on telescope/dome etc – UNC will address for Goodman and other instruments not considered “critical” at present (unless demand changes) Expected to result in additional project work

Pg 8 15 September 2015 ACTR Meeting New Projects (Board List) M1 active optics speed up –Mike Warner is a key person; some support from Omar Estay –Much of the electronic work can be done by SOAR day crew –Goal is to speed up M1 adjustments during slews by factor of 3+ –Define as ACTR project so we can start Goodman blue camera modernization –Red camera electronics very different from old blue camera electronics –Strongly recommended to upgrade to compatible hardware (need to confirm feasibility) –Associated upgrades to software –Mostly UNC or external contract, but interaction with TCS implies need for ETS SW software –Not requesting definition as ACTR project yet (if ever)

Pg 9 15 September 2015 ACTR Meeting New Projects Instruments –Support for SIFS – intermittent for now, may ramp up some –Support for STELES – NOT ready to ship, but will need support when it arrives Support for installation Support for dewar completion Review of plans… –TripleSpec aka ARCoIRIS? Ask Steve about this

Pg September 2015 ACTR Meeting New Projects Guider Project(s) –Upgrade to TT guider has been on the SOAR project list for years (not necessarily on the ACTR list, though) –Work on “donut” algorithm has shown that there are problems with the guider optics that make “donut” impractical – vignetting and insufficient depth of focus –Tentative proposal – Add focus mechanism Replace input lens with somewhat larger lens Allows for addition of a 2x2 Shack Hartmann element (prism, similar design used at Gemini) Should provide permanent TTFA correction –Minimal loss of sensitivity (acceptable) –Some loss of patrol field –Implement at both foci, TBD which comes first –Up to ACTR whether to wait for better definition but we want to move ahead on this

Pg September 2015 ACTR Meeting New Projects Guider Project(s) continued –Upgrades to CWFS “pending” OK with existing hardware until it fails – then it’s critical Should not wait for critical failure analysis to complete