David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development /

Slides:



Advertisements
Similar presentations
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Advertisements

Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
5 th LHC Radiation Day Radiation response of RADMON sensors T. Wijnands (TS/LEA), C. Pignard (TS/LEA) Acknowledgements : UCL Louvain-La-Neuve, PSI Villingen,
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Housing for Passive Radiation Sensors Ch. Ilgner, February 15, 2007 Proposal for a versatile easy-to-use passive sensor housing for radiation monitoring.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
5th LHC Radiation Day, Passive dosimetry at the LHC 1 D. Forkel-Wirth, M. Fuerstner, F. Jaquenod, M. Silari and H. Vincke CERN Radiation Protection.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
March 8, 2006Exp. Area Meeting - E. Thomas1 Oxygen Deficiency Hazards Detection System in UX85 Two risks – Two systems 1.Top : He leaks 2.Bottom : CF4.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
EPICS EPICS Collaboration Meeting Argonne June 2006 IOC Redundancy: Redundancy Monitor Task EPICS Meeting - Redundancy Argonne, June 16, 2006 Matthias.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Dec
TS/LEA, CERN, 1211 Geneva 23 Thijs Wijnands TS/LEA/RADLECC Workshop Heidelberg Thijs Wijnands (CERN TS Department) Challenges Status Future Interfacing.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Report from the MCWG, 4 th R2E Committee Meeting M. Calviani for the MCWG (link), EN/STIlink.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Matters arising RADWG - 3 July 2009
Pico-second TDC Schedule & Production
Radiation monitoring and follow up during LHC commissioning
The ATLAS Zero Degree Calorimeter Brookhaven National Laboratory, USA
Installation of an Instrument on a CERN machine
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
CMS November Upgrade Week
Compact readout unit for the EP-RADMON radiation monitoring sensors
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Henning E. Larsen, INFN 12 July 2006
Sheng-Li Liu, James Pinfold. University of Alberta
Strategy for long-term support of the TTC system
BLMs - Radmon – BSCs – BCMs for steering the beams in collision during the engineering run at 450 GeV Thijs Wijnands (TS/LEA), Richard Hall Wilton (TS/LEA),
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
RPC HV-LV project Introduction System requirements and description
RPC Readiness for installation
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
MICROFIP-Do we need further tests? 28th June 2011
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
RADWG Meeting February 2017
Test.
Radiation Working Group RADWG
2015 January February March April May June July August September
Presentation transcript:

David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development / testing T. Wijnands T. Wijnands Software development Software development Physics Physics Project management Project management D. Mcfarlane (TS-LEA-DES) D. Mcfarlane (TS-LEA-DES) Onsite supervision / installation Onsite supervision / installation K. Cwalina K. Cwalina Software development Software development

David MCFARLANE Key points design Radiation tolerant readout Radiation tolerant readout 200 Gy 200 Gy 2 x MeV eq. neutrons 2 x MeV eq. neutrons Thermo compensated readout Thermo compensated readout Calibrated Calibrated Remote readout at 100 Hz Remote readout at 100 Hz

David MCFARLANE Monitor parts & assembly

David MCFARLANE Remote sensors For areas with high radiation 250 MeV proton irradiation at PSI

David MCFARLANE RADMON – 3 layered architecture presentation resource middle 20 gateways in total

David MCFARLANE LHC radiation monitors – areas covered 307 monitors in total

David MCFARLANE RADMON COVERAGE 20 Gateways 307 Monitors Machine tunnel Machine tunnel FP- 420 FP- 420 ZDC (Zero Degree Colorimeter) ZDC (Zero Degree Colorimeter) TOTEM TOTEM TAN areas TAN areas CMS CMS LHCb LHCb ATLAS ATLAS

David MCFARLANE Installation and commissioning - machine Point 7 - UJ76 Point 8 R – Q1 UJ88 – end of TI8

David MCFARLANE Point 1 (including FP-420)

David MCFARLANE LHCb

Installation and commissioning - CMS A. MacPherson

David MCFARLANE Areas Completed LHCb LHCb Sector 7 Right Sector 7 Right Sector 8 Left Sector 8 Left Sector 8 Right Sector 8 Right Sector 1 Left (not including FP-420) Sector 1 Left (not including FP-420)

David MCFARLANE 2007 Schedule 4 Right / 5 left 4 Right / 5 left Feb 2007 Feb 2007 CMS CMS End of March (To Be Confirmed) End of March (To Be Confirmed) 3 Right / 4 Left 3 Right / 4 Left April 2007 April Right / 6 Left 5 Right / 6 Left May 2007 May right / 7 left 6 right / 7 left June 2007 June Right / 3 Left 2 Right / 3 Left July 2007 July Right / 2 Left 1 Right / 2 Left Aug 2007 Aug 2007 ATLAS ATLAS Aug 2007 Aug 2007

David MCFARLANE Contribution / Collaboration AB/CO AB/CO Gateway Gateway Timing card Timing card Remote reset Remote reset UPS to gateway UPS to gateway WFIP interface card WFIP interface card WFIP WFIP Repeaters Repeaters Reception tests of the line Reception tests of the line maintenance maintenance TS/EL TS/EL UPS to monitor UPS to monitor WFIP trunk cable WFIP trunk cable WFIP junction boxes (TAP) WFIP junction boxes (TAP) TS/LEA/DES TS/LEA/DES WFIP drop cables WFIP drop cables 220V power cable drop from UPS 220V power cable drop from UPS TS/DEM TS/DEM RADMON hardware RADMON hardware