David MCFARLANE RADMON (RADiation MONitoring) TS-LEA-RAD C. Pignard C. Pignard Hardware design / development / testing Hardware design / development / testing T. Wijnands T. Wijnands Software development Software development Physics Physics Project management Project management D. Mcfarlane (TS-LEA-DES) D. Mcfarlane (TS-LEA-DES) Onsite supervision / installation Onsite supervision / installation K. Cwalina K. Cwalina Software development Software development
David MCFARLANE Key points design Radiation tolerant readout Radiation tolerant readout 200 Gy 200 Gy 2 x MeV eq. neutrons 2 x MeV eq. neutrons Thermo compensated readout Thermo compensated readout Calibrated Calibrated Remote readout at 100 Hz Remote readout at 100 Hz
David MCFARLANE Monitor parts & assembly
David MCFARLANE Remote sensors For areas with high radiation 250 MeV proton irradiation at PSI
David MCFARLANE RADMON – 3 layered architecture presentation resource middle 20 gateways in total
David MCFARLANE LHC radiation monitors – areas covered 307 monitors in total
David MCFARLANE RADMON COVERAGE 20 Gateways 307 Monitors Machine tunnel Machine tunnel FP- 420 FP- 420 ZDC (Zero Degree Colorimeter) ZDC (Zero Degree Colorimeter) TOTEM TOTEM TAN areas TAN areas CMS CMS LHCb LHCb ATLAS ATLAS
David MCFARLANE Installation and commissioning - machine Point 7 - UJ76 Point 8 R – Q1 UJ88 – end of TI8
David MCFARLANE Point 1 (including FP-420)
David MCFARLANE LHCb
Installation and commissioning - CMS A. MacPherson
David MCFARLANE Areas Completed LHCb LHCb Sector 7 Right Sector 7 Right Sector 8 Left Sector 8 Left Sector 8 Right Sector 8 Right Sector 1 Left (not including FP-420) Sector 1 Left (not including FP-420)
David MCFARLANE 2007 Schedule 4 Right / 5 left 4 Right / 5 left Feb 2007 Feb 2007 CMS CMS End of March (To Be Confirmed) End of March (To Be Confirmed) 3 Right / 4 Left 3 Right / 4 Left April 2007 April Right / 6 Left 5 Right / 6 Left May 2007 May right / 7 left 6 right / 7 left June 2007 June Right / 3 Left 2 Right / 3 Left July 2007 July Right / 2 Left 1 Right / 2 Left Aug 2007 Aug 2007 ATLAS ATLAS Aug 2007 Aug 2007
David MCFARLANE Contribution / Collaboration AB/CO AB/CO Gateway Gateway Timing card Timing card Remote reset Remote reset UPS to gateway UPS to gateway WFIP interface card WFIP interface card WFIP WFIP Repeaters Repeaters Reception tests of the line Reception tests of the line maintenance maintenance TS/EL TS/EL UPS to monitor UPS to monitor WFIP trunk cable WFIP trunk cable WFIP junction boxes (TAP) WFIP junction boxes (TAP) TS/LEA/DES TS/LEA/DES WFIP drop cables WFIP drop cables 220V power cable drop from UPS 220V power cable drop from UPS TS/DEM TS/DEM RADMON hardware RADMON hardware