Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013.

Slides:



Advertisements
Similar presentations
Elena.Litvinenko CBM Collaboration Meeting Dubna 17 Oct Dipole magnet for CBM: current status P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov,
Advertisements

1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
HADES coll. meeting, Oct. 31, 2007 Charged pion production in C+C at 1 and 2 A GeV results of data analysis from experiments NOV02 and AUG04 Jehad Mousa.
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
RICH upgrade simulation: updates S.Easo RICH upgrade-mechanics meeting 1.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
STS Radiation Environment 11 th CBM Collaboration Meeting GSI, February 2008 Radoslaw Karabowicz GSI.
F.Videbaek PXL geometry update. PXL ladder For realistic simulation it is essential to get the proper layout of ladders. Starting point 1.SW model 2.Material.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Andrei Nomerotski, University of Oxford ILC VD Workshop, Menaggio 22 April 2008 SiD Vertex Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
J/ψ simulations: background studies and first results using a compact RICH detector Alla Maevskaya INR RAS Moscow CBM Collaboration meeting September 2007.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
DCal-ALICE integration and installation plan and status A. Tauro.
R&D LINE ON ACTIVE PIXEL DETECTORS P1.6 Fiber optic enviromental and structural vertex monitor. Ciemat, October 27 th D. Moya, I. Vila, A. L. Virto., J.González.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
Feasibility of the detection of D 0 mesons in the NA61/SHINE experiment: Vertex detector for NA61/SHINE P. Staszel and Yasir Ali Jagiellonian University.
For the CMS Pixel detector
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
GSI, for the CBM Collaboration
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Status of GASPARD mechanics
Updates on vertex detector
Next steps toward the beam test
Technical Design for the Mu3e Detector
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
Feasibility of the detection of D0 mesons in the NA61/SHINE experiment
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Micro Vertex Detector of PANDA Strip Detector
Performance of an Automated Water Based Cooling System for CBM MuCh
SILICON PIXELS DETECTOR
The Beam Test at Fermilab:
C.Clerc ILD session, ALCPG /03/2010
IHEP group Shashlyk activity towards TDR
Vertex Detector Mechanical R&D Design Questions and Issues
Tracking System at CERN 06 and 07 test beams
Success of the first NA61 run
Vertex Detector project for the NA61/SHINE collaboration
of secondary light ion beams
Prototype Vertex Detector
NA61/SHINE: status and energy scans with Pb+Pb collisions
WG4 – Progress report R. Santoro and A. Tauro.
Open Charm Measurements with a Small Acceptance Vertex NA61
Preparations for test of
Work packages status in Torino and perspectives
For the CMS Pixel detector
Presentation transcript:

Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013

2 Outline 1. VD setup (full version) 2. Prototype VD geometry 3. Cooling, read-out 4. Project plan VTPC2

3 Vertex Detector (VD) NA61/SHINE detector – top view

4 VD in geant4 VTPC1 VTPC2 VDS1 : 5 cm VDS2: 10 cm VDS3: 15 cm VDS4: 20 cm

5 VD in geant4 VTPC1 VTPC2 MIMOSA-26 sensors Carbon fiber support Water cooling tubes Vessel: Rectangular top/bottom plates Trapezoidal left/right plates → same length of carbon leader → similar distance between top/bottom plates and VDS1-VDS4 → flat micro cables variation in length +/- 2cm

6 VTPC1 VTPC2 Simulation results: full version of VD 200k 0-10% central Pb+Pb at 158 GeV With perfect PID: S/B=1 for 50M events: ~ 64k D 0 + D 0 bar SNR= 197 With perfect PID: S/B=17 for 50M events: ~ 64k D 0 + D 0 bar SNR= 246 more analysis details at (Collaboration meeting in Budapest 2012)

7 VTPC1 VTPC2 Geometry for prototype VDS1 VDS4 VDS2 VDS3 Acceptance is defined by VDS4

8 VTPC1 VTPC2 Simulation results for prototype 500k 0-10% central Ar+Ar at 158 GeV Again cuts are optimized to central Pb+Pb at 158 AGeV (cuts may be relaxed for Ar+Ar) ~ 20 D 0 + D 0 bar For “no Pid” analysis S/B=11 and SNR= 4.6 Measurement with the setup2 geometry seems to be feasible if we collect ~500k central events (and if HSD yields are not significantly over-predicted) perfect Pid no Pid

9 VTPC1 VTPC2 Sensor layout (prototype)

10 VTPC1 VTPC2 Carbon ladders for prototype Carbon ladders

11 VTPC1 VTPC2 Carbon ladders for prototype Area in the center must not be covered (+/- 3mm). Do we need a special design of inner ladders (y=0)?

12 VTPC1 VTPC2 Cooling system Flow direction Flow-meter/controller Cooling plant Distribution manifold Temperature sensors Slow control unit Flow: 1000cm 3 / min to keep ΔT=1K Vessel plates (left/right)

13 VTPC1 VTPC2 Cooling system Flow direction Flow-meter/controller Cooling plant Distribution manifold Slow control unit Prototype: 12 pipes, full detector: 40 pipes

14 VTPC1 VTPC2 Cooling system Flow-meter/controller Cooling plant Distribution manifold Slow control unit Elements fixed to the vessel → moving together

15 VTPC1 VTPC2 Readout system (more in Michael's talk) Should be available soon → developed for CBM, we might profit from this development

16 VTPC1 VTPC2 Readout system Aluminum frame Primary setup handles 2 sensors, it might fit well to full VD setup

17 VTPC1 VTPC2 Vds2 layout 1. Propose setup allows for avoiding micro cables in front of sensors 2. Full Vds2 can be easily covered by two sensor structures. 3. It will work for Vds4

18 Time plan 1. Proposal submission by June the 17-th (2 years) (done) 2. Funds available late Purchases (M26, LV, Water Cooling Plant, TRB) late 2013 – beginning of Work in parallel: i) read-out (adopting to NA61, Krakow, Oskar), ii) cooling system (Krakow), iii) carbon fiber support (CERN, Grigory, Sergiey) iv) sensors quality checks and integration on support (IKF Frankfurt, Michael) 5. Integration of the system and tests on cosmics with DC (in Krakow) → will allow for synchronization test 6. Preparation for test at CERN: late 2014, beginning Integrated test for Ar+Ca: Feb – test data analysis, reco. software development Software developments: move simulation (geant4) and analysis to SHINE (Pawel, Dag)

19 Backup Slides

VTPC1 VTPC2 D 0 → K + π -, 200k 0-10% cent. Pb+Pb at 158 AGeV S/B=13 For 50M events: SNR = k D 0 +D 0 bar S/B=15 For 50M events: SNR = k D 0 +D 0 bar S/B=6.6 For 50M events: SNR = k D 0 +D 0 bar S/B=9.6 For 50M events: SNR = k D 0 +D 0 bar

21 VD in geant4 (old setup) VTPC1 VTPC2 VDS1 : 5 cm VDS2: 10 cm VDS3: 15 cm VDS4: 20 cm