3 rd xTCA IG meetingVincent Bobillier et al. 1 MMC mezzanine.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
HEP Data Sharing … … and Web Storage services Alberto Pace Information Technology Division.
INTELLIGENT PLATFORM MANAGEMENT CONTROLLER FOR NUCLEAR FUSION FAST PLANT SYSTEM CONTROLLERS 17th Real Time Conference IPFN, Lisbon, Portugal, May,
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 Cooling Unit.
Shelf Management & IPMI SRS related activities
Topical Workshop on Electronics for Particle Physics Perugia 24/9/2013 Evaluation results of xTCA equipment for HEP experiments at CERN 1 Collaboration.
CERN - IT Department CH-1211 Genève 23 Switzerland t SVN Pilot: CVS Replacement Manuel Guijarro Jonatan Hugo Hugosson Artur Wiecek David.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Update on the ATCA work going on at LAPP xTCA interest group - CERN 08/04/2013 Nicolas LETENDRE Alain Bazan, Fatih Bellachia, Sébastien Cap,Nicolas Dumont-Dayot,
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Industry SDLCs and Business Climate. Justin Kalicharan Credentials Director and Senior Technology Officer Over 14 years of coding experience in various.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
R R R 1 Frameworks III Practical Issues. R R R 2 How to use Application Frameworks Application developed with Framework has 3 parts: –framework –concrete.
T Project Review Tetrastone [Iteration 2]
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
ΜTCA for physicists? A project of PH-ESE group to evaluate platforms for uTCA based systems at CERN and in the HEP community M. Joos, CERN on behalf of.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
XTCA projects (HW and SW) related to ATLAS LAr xTCA interest group - CERN 07/03/2011 Nicolas Letendre – Laurent Fournier - LAPP.
August 28, 1998Handling requests with a trouble ticket system at DESY Zeuthen1 Wolfgang Friebel Motivation The req/reqng request tracking system Enhancements.
1 / x CMMI Technical Solution Rob Vanden Meersche Dieter Van den Bulcke.
Company small business cloud solution Client UNIVERSITY OF BEDFORDSHIRE.
The PH/ESE µTCA evaluation project a (short) status update Markus Joos CERN M. Joos, CERN13rd meeting of the xTCA IG.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Monday December DESY1 GDCC news Franck GASTALDI.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
Software Engineering REQUIREMENT ENGINEERING. Software Engineering Phases.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
ISCUG Keynote May 2008 Acknowledgements to the TI-Nokia ESL forum (held Jan 2007) and to James Aldis, TI and OSCI TLM WG Chair 1 SystemC: Untapped Value.
IPMI developments at LAPP dec 15, 2011IPMI developments at LAPP, L.Fournier1 Alain BAZAN, Fatih BELLACHIA,Sébastien CAP, Nicolas DUMONT DAYOT, Laurent.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference ERP Fixed Assets ERP Fixed Assets Presented by: Will Brock ERP Programmer PowerPoint.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Johannes Lang: IPMI Controller Johannes Lang, Ming Liu, Zhen’An Liu, Qiang Wang, Hao Xu, Wolfgang Kuehn JLU Giessen & IHEP.
Status of CEPC Beam Instrumentation Study Ma Huizhou On behalf of CEPC BI Group Beijing, China
Use of SVN as lattice repository Andrea Latina Common paths for CLIC and ILC BDS – Friday, 30 August 2013 – CERN.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Software Development Module Code: CST 240 Chapter 6: Software Maintenance Al Khawarizmi International College, AL AIN, U.A.E Lecturer: Karamath Ateeq.
Developers Users Committers How do I configure this now? Just one more fix and I am done! CVS Download/Use Software Submit problems/ request features Store.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
DCFEB Production for LS2
Development of T3Maps adapter boards
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Design of an AdvancedTCA board Management Controller Solution
Plan for LS2 – Version 2 08/02/2017.
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
CERN-IPMC Solution for AdvancedTCA Blades
INSIDE – Update meeting
Requirements analysis, representation and validation
A Software Architecture Model……
T Project Review Group: pdm I2 Iteration
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Maintaining software solutions
xTCA interest group meeting
CSCW Facilitating work by more than one person
Programmable Logic Controllers (PLCs) An Overview.
Network management system
Design and Programming
The Software Development Process
Presentation transcript:

3 rd xTCA IG meetingVincent Bobillier et al. 1 MMC mezzanine

3 rd xTCA IG meetingVincent Bobillier et al. 2 MMC mezzanine Outline MMC role Development history and motivations Example of implementation Software Additional information

3 rd xTCA IG meetingVincent Bobillier et al. 3 MMC role Manage hot swap sequence Board asset information − Manufacturer, − Product name, − Model number, − Serial number, − Geographical information, − Version, − Features, −... Monitor functions − Board and components temperature, − Voltage levels, − … Relies on IPMI (Intelligent Platform Management Interface) communication standard MMC mezzanine

3 rd xTCA IG meetingVincent Bobillier et al. 4 Development history and motivations CPPM: Developed our own design because − Few commercial solutions − All proprietary and single source − Or expensive IPs Use of a mezzanine to: − Save room on AMC board − Speed-up development Received valuable help from DESY who already designed such a functionality. (Thanks to Kay Rehlich and Vahan Petrosyan) CERN: To participate in the project finalization (mainly S/W). To centrally produce, distribute and give support for both H/W and S/W Pigeon Point Reference designs (IPs) MMC mezzanine

3 rd xTCA IG meetingVincent Bobillier et al. 5 MMC mezzanine Development history and motivations (continuing) From version 2: 2 links missing (miswired). Schematic had to be corrected. Chosen connector (Samtec ERM/ERF8) was not very well adapted (no latching). Replaced by Samtec SS4/ST4. Oscillator too high for the use of the latched version of the SS4/ST4. AVR’s internal oscillator is used. PCB size can be reduced from: 20x39 to 20.5x28.5 mm From version 3: New connector latches not found to be robust enough so a fixation hole (for the use of a locking post) is added in the pcb. Final version: 3.1 Version 2 Version 3.1 Version 3

3 rd xTCA IG meetingVincent Bobillier et al. 6 MMC mezzanine Example of implementation LHCb Muon trigger system

3 rd xTCA IG meetingVincent Bobillier et al. 7 MMC mezzanine Software Basic code originally developed by DESY, then modified by CPPM Code is now in a SVN repository at CERN To-do list: Review of the code Remove unused code, improve coding style, add documentation, etc. Find and fix bugs Separate common S/W code from user specific/defined code DESY and CPPM are kept in the loop Add RTM and JTAG support DESY has contributed the basic function CERN will hook them up to the main program Add missing features (?) The Polaris AMC tester has flagged a lot of thing How much effort do we want to invest?

3 rd xTCA IG meetingVincent Bobillier et al. 8 MMC mezzanine Additional information Technical specification: uTCAEvaluationProject/MMC_project/Shared%20Documents/MMC%20mezzanine/Specification/MMC_s pecification_v3.0.pdf Required by the users (for all user specific code): AVR studio 4 programming platform ( AVR programmer (~ US$, Availability H/W (MMC v3.1) is available now (20+ units produced). However, S/W is work in progress... Estimated price (per piece): CHF If interested please contact me by