2012-02-28E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.

Slides:



Advertisements
Similar presentations
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Advertisements

Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Status & Plans for Backend Program  Backend Architecture  Current Status  Schedule for HF Backend  Schedule for HB/HE Backend  Summary & Plans November.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
TBD The Matrix Card Status and Plans Dr. John Jones Princeton University
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
HCAL Back End Report Manoj Sharan, For BackEnd Group June 24, 2014.
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
CALICE DAQ Developments
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Test Stand Status and Plans
L1Calo Phase-1 architechure
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Trigger Upgrade Planning
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
AMC13XG (XG = Ten Gigabit)
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
CSC Trigger Muon Port Card & Sector Processor in production
GEM for CMS Electronics Overview
FED Design and EMU-to-DAQ Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University

E. Hazen -- CMS Week HCAL MicroTCA Crate

E. Hazen -- CMS Week Slice Test Hardware Infrastructure uTCA crates (2 delivered, one installed in USC55) MCH modules (2 installed at 904 and USC55) Power modules (1 in USC55, 2 nd on order) Cards 1 MiniCTR2C (SNAP12 optics) in USC55 1 Optical Receiver/Booster in USC55 (boost optical levels for SNAP12) 2 AMC13 for HCAL plus two others at CERN

E. Hazen -- CMS Week Recent Developments Kolkata producing MiniCTR2D boards First validated prototype enroute to MN now Will produce additional boards in ~ 1mo AMC13 / uHTR Integration Successful integration of clock/TTC distribution at Minnesota

E. Hazen -- CMS Week Near-term goals Integration of DAQ path uHTR / AMC13 backplane link AMC13 spy buffer for validation of prescaled data Histogramming to study synchronization with beam Continue uHTR design reviews HLT development for collecting cross-comparison data during parasitic running

E. Hazen -- CMS Week AMC13 Details All documentation at

E. Hazen -- CMS Week AMC13 Hardware Virtex-6 LX130T FPGA DAQ Functions, buffering 6Gb links to backplane, SFP (4) SFP+ Sites 1 for TTC (160Mb) 3 for DAQ/etc 6.2Gb Spartan 6 FPGA Fabric B TTC distribution Firmware management interface to MMC Atmel AVR-32 uC MMC Functions Tongue 1 PCB Tongue 2 PCB Tongue 3 PCB (optional, for initial programming) JTAG Headers MMC programming FPGA programming Mini- USB MMC serial console

E. Hazen -- CMS Week Installation Front Panel StuffLocation in Crate MCH In MCH1 (NAT or Vadatech) AMC13 In MCH2 JTAG (AMC13 FPGAs) JTAG (MMC AVR-32) USB (MMC console) LED1 (MMC Red LED) LED2 (MMC Green LED) SFP0 (DAQ Loop-back test) SFP1 (DAQ Output) SFP2 (Spare) SFP3 (TTC/TTS) N.B. If the AMC13 is in the MCH1 (top) site many things will not work properly!

E. Hazen -- CMS Week AMC13 Disposition

E. Hazen -- CMS Week Firmware Status IPbus on both Spartan and Virtex FPGAs (two IP addresses per module) IP addresses are sss and vvv where sss = *SN and vvv = *SN (SN is module serial number from front panel) Flash reprogramming over Ethernet possible using Python script

E. Hazen -- CMS Week Firmware Status CDAQ Integration Prototype DAQ link demonstrated at 5Gb/s AMC13 and firmware delivered to CDAQ They want to modify it :( negotiations continue TTC / Clock Distribution Included in firmware, words as far as we know Backplane DAQ link Development underway, expect tests in 1-2 weeks

E. Hazen -- CMS Week Firmware Status 3 DAQ buffering in SDRAM under development Initially readout over Ethernet (via MCH) Option to readout over CDAQ fiber link Other features can be added as needed...

E. Hazen -- CMS Week Software Status Currently all work in Python status display firmware download Initial work for AMC13 will be based on existing uHTR code. Future more general CMS-wide effort requires significant discussions