SA1: Production e-VLBI service Arpad Szomoru JIVE.

Slides:



Advertisements
Similar presentations
Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
Advertisements

Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
Project Partners Project Collaborators The Council for the Central Laboratory of the Research Councils Funded by EPSRC GR/T04465/01
Restricted Slow-Start for TCP William Allcock 1,2, Sanjay Hegde 3 and Rajkumar Kettimuthu 1,2 1 Argonne National Laboratory 2 The University of Chicago.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
1 The SpaceWire Internet Tunnel and the Advantages It Provides For Spacecraft Integration Stuart Mills, Steve Parkes Space Technology Centre University.
Providing Controlled Quality Assurance in Video Streaming across the Internet Yingfei Dong, Zhi-Li Zhang and Rohit Rakesh Computer Networking and Multimedia.
E-VLBI at ≥ 1 Gbps -- “unlimited” networks? Tasso Tzioumis Australia Telescope National Facility (ATNF) 4 November 2008.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
Support for Radio Astronomy Michael Enrico DANTE.
High Rate Internet Data Transfer for eVLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester All Hands Sept 2005.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
High-speed TCP  FAST TCP: motivation, architecture, algorithms, performance (by Cheng Jin, David X. Wei and Steven H. Low)  Modifying TCP's Congestion.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
1 BWdetail: A bandwidth tester with detailed reporting Masters of Engineering Project Presentation Mark McGinley April 19, 2007 Advisor: Malathi Veeraraghavan.
Rate Control Rate control tunes the packet sending rate. No more than one packet can be sent during each packet sending period. Additive Increase: Every.
Research Networks and Astronomy Richard Schilizzi Joint Institute for VLBI in Europe
Data Transport Challenges for e-VLBI Julianne S.O. Sansa* * With Arpad Szomoru, Thijs van der Hulst & Mike Garret.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
上海天文台 Shanghai Astronomical Observatory 4th IVS General Meeting Spacecraft Tracking with Chinese VLBI Network Xiuzhong Zhang and Chinese VLBI Network Team.
An Introduction to UDT Internet2 Spring Meeting Yunhong Gu Robert L. Grossman (Advisor) National Center for Data Mining University.
Lecture (Mar 23, 2000) H/W Assignment 3 posted on Web –Due Tuesday March 28, 2000 Review of Data packets LANS WANS.
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
VLBI_UDP An application for transferring VLBI data via UDP protocol Simon Casey e-VLBI meeting, Haystack 20 Sep 2006.
1 IEX8175 RF Electronics Avo Ots telekommunikatsiooni õppetool, TTÜ raadio- ja sidetehnika inst.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
Data delayed Real Time Data Transfer for Very Long Baseline Interferometry Simon Casey, Richard Hughes-Jones, Stephen Kershaw, Ralph Spencer, Matt Strong.
5 th e-VLBI Workshop, Haystack Observatory, September 2006, A. Szomoru, JIVE e-VLBI Developments at JIVE Arpad Szomoru.
SA1: Production e-VLBI service Arpad Szomoru JIVE.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
8 th EVN Symposium, Torun, September 2006, A. Szomoru, JIVE Recent e-EVN Developments Arpad Szomoru.
FABRIC WP1.2 Broadband Data Path: Protocols and Processor Interface Bonn 20/09/07 Ralph Spencer The University of Manchester.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
SA1: Production e-VLBI service Previous 12 Month Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
Progress on EXPReS at JBO
SA1: technical progress
SA1: overview, first results
Technical Operations and R&D at JIVE
WP18, High-speed data recording Krzysztof Wrona, European XFEL
FileCatalyst Performance
e-VLBI correlator mode: control interfaces
SA1: Production e-VLBI service
Efficient utilization of 40/100 Gbps long-distance network
eInfrastructures: Usage Policy
E-EVN developments in 2006 Arpad Szomoru.
Networking between China and Europe
Transport Protocols over Circuits/VCs
Transportation Research Board 2004 Annual Meeting
e-EVN: practical considerations
Wide Area Networking at SLAC, Feb ‘03
File Transfer Issues with TCP Acceleration with FileCatalyst
FAST TCP : From Theory to Experiments
PRESENTATION COMPUTER NETWORKS
SA1: third year overview
EEC4113 Data Communication & Multimedia System Chapter 1: Introduction by Muhazam Mustapha, July 2010.
Advancements in SCPS-TP technology and deployments
Presentation transcript:

SA1: Production e-VLBI service Arpad Szomoru JIVE

2007 May 29EXPReS Board Meeting: SA1Slide #2 Outline e-VLBI in practice Work packages Soft- and hardware developments

2007 May 29EXPReS Board Meeting: SA1Slide #3 e-VLBI science/test runs 12 e-VLBI science projects accepted: 2 failed 3 Target of Opportunity (Cygnus X-3, GRS ) 3 determination of compactness of calibrator or target 3 part of multi-wavelength campaign 1 adaptive observation of 16 X-ray binaries (no detections..) Rapid access to EVN provides clear benefit to users (important for calibrator/multi-wavelength projects) Follow up of bursting transients only moderately successful  two week delay between proposal deadline and actual observations is simply still too long

2007 May 29EXPReS Board Meeting: SA1Slide #4 e-VLBI: operational improvements Overall improvement in first year: Robustness Reliability Speed Ease of operation Station feedback Minimizing data loss by careful scheduling Increase of production data rate from 128 Mbps to 256 Mbps 5-station fringes at 512 mbps Inclusion of Metsähovi and Medicina telescopes

2007 May 29EXPReS Board Meeting: SA1Slide #5 e-VLBI results

2007 May 29EXPReS Board Meeting: SA1Slide #6 e-VLBI: data rate improvements

2007 May 29EXPReS Board Meeting: SA1Slide #7 The EVN MarkIV correlator Custom-made hardware, ~ lines of C++ code Designed and built on tape technology, only recently adapted for disk-based recording

2007 May 29EXPReS Board Meeting: SA1Slide #8 Work packages Standard e-VLBI correlator mode: Wall-clock time vs ROT Centralized control Rapid response/ToO functionality: Real-time monitoring/feedback/analysis On-the-fly adjustment of observational/correlator parameters Improved amplitude calibration Data transport issues Lightpaths: guaranteed (high) bandwidth Transport protocols (modified TCP, UDP-based, VSI-e…) Hardware issues New control computers (reliability, speed) Replacement of SUs (cause of much misery) Networking hardware (router, interfaces)

2007 May 29EXPReS Board Meeting: SA1Slide #9 e-VLBI correlator mode: control interfaces

2007 May 29EXPReS Board Meeting: SA1Slide #10 Monitoring tools: Integrating fringe display

2007 May 29EXPReS Board Meeting: SA1Slide #11 Monitoring tools: Data status monitor

2007 May 29EXPReS Board Meeting: SA1Slide #12 Monitoring tools: Data status monitor

2007 May 29EXPReS Board Meeting: SA1Slide #13 Rapid adjustment of correlator params: vex editor

2007 May 29EXPReS Board Meeting: SA1Slide #14 (near) Real-time analysis: streamlining of post processing

2007 May 29EXPReS Board Meeting: SA1Slide #15 Web-based Post-processing

2007 May 29EXPReS Board Meeting: SA1Slide #16 Protocol work in Manchester: Protocol Investigation for eVLBI Data Transfer Protocols considered for investigation include: TCP/IP UDP/IP DCCP/IP VSI-E RTP/UDP/IP Remote Direct Memory Access TCP Offload Engines Work in progress – Links to ESLEA UK e-science Vlbi-udp – UDP/IP stability & the effect of packet loss on correlations Tcpdelay – TCP/IP and CBR data

2007 May 29EXPReS Board Meeting: SA1Slide #17 Protocols (1) Mix of High Speed and Westwood TCP (Sansa)

2007 May 29EXPReS Board Meeting: SA1Slide #18 Protocols (2) Circuit TCP (Mudambi, Zheng and Veeraraghavan) Meant for dedicated end-to-end circuits, fixed congestion window No slow start, no backoff: finally, a TCP rude enough for e-VLBI?

2007 May 29EXPReS Board Meeting: SA1Slide #19 Protocols (3) Home-grown version of CTCP using pluggable TCP congestion avoidance algorithms in newer Linux kernels (Mark Kettenis) Rock-steady 780 Mbps transfer using iperf from Mc to JIVE Problem with new version of Mk5A software under newer kernels; should be solved by the end of May..

2007 May 29EXPReS Board Meeting: SA1Slide #20 Hardware New control computers Solaris AMD servers, redundant power supplies Interchangeable for maximum reliability Cut down dramatically on (re-)start time Removal of single points of failure Mark5 upgrade Original Mark5s woefully under-powered (Pentium PIII…) New dual processor motherboards, memory, power supplies Immediate result: Mc and Tr now sustain 512 Mbps Mark5A→B: new streamstor cards, new serial links (optical and coax), Correlator Interface Boards Elimination of Station Units, VSI compliance

2007 May 29EXPReS Board Meeting: SA1Slide #21 Hybrid networks in the Netherlands..

2007 May 29EXPReS Board Meeting: SA1Slide #22..and across Europe: GÉANT2 network upgrade

2007 May 29EXPReS Board Meeting: SA1Slide #23 Local solutions: Tr connectivity bottleneck (partially) solved Black Diamond 6808 switches: New interfaces (10GE) system in old architecture (1GE) Originally 8x1GE interface per card 10GE NIC served by 8 x 1GE queues Queuing regime – RR (packet based) and flow-based Flow based: Max. flow capacity – 1Gbit/s – background traffic. There is no known reordering workaround to solve this problem. But, re-routing of traffic between Poznan and Gdansk has made a big difference.

2007 May 29EXPReS Board Meeting: SA1Slide #24 Upgrade of network at JIVE

155 Mbps 1 Gbps 2.5 Gbps 10 Gbps

2007 May 29EXPReS Board Meeting: SA1Slide #26

2007 May 29EXPReS Board Meeting: SA1Slide #27 SA1: the next 18 months All personnel in place, at JIVE and JBO Main focus: Adaptive scheduling Increasing the operational data rate Improving flexibility and robustness of correlation New telescopes Inclusion of eMERLIN telescopes Re-assessment/refinement of deliverables

2007 May 29EXPReS Board Meeting: SA1Slide #28 Specific tasks Crucial: fast/adaptive (re-)scheduling Transform EVN into a truly flexible instrument Reaction time of hours Remote control of widely different telescope control systems Safeguard local operational constraints hard/software upgrade Phase out aging Station Units, main cause of operational instability Involves large software effort VSI compliance

2007 May 29EXPReS Board Meeting: SA1Slide #29 Fine-tuning of deliverables Use of WSRT synthesis data for e-VLBI calibration (absolute flux calibration, polarization calibration, source selection) Space craft tracking correlator mode On-the-fly fringe fitting Real-time download and extraction of station information Automated correlator diagnostics Removing/adding stations from the correlation process on the fly Investigating a 1024M sub-array

2007 May 29EXPReS Board Meeting: SA1Slide #30 Connectivity improvements: Use of new/modified transport protocols, lightpaths across Europe Increase granularity of data streams to optimize utilization of available bandwidth Increase of sensitivity and resolution through addition of telescopes: Effelsberg, Yebes, Shanghai Improving global connectivity: South-America, Puerto Rico, China, Australia

2007 May 29EXPReS Board Meeting: SA1Slide #31 Global connectivity: Arecibo: 64 Mbps real-time operations in the past, currently < 32 Mbps. New submarine cable facilities in near future… Australia: 4 LBA telescopes connected at 1 Gbps. AARNET currently investigating transport to Europe. Issues with format conversion, command interfaces. First test planned before summer 2007 South Africa: local situation improving, connection to Europe remains problematic

2007 May 29EXPReS Board Meeting: SA1Slide #32 e-VLBI to South America: SMART-1 SMART-1 factsheet Testing solar-electric propulsion and other deep-space technologies Name SMART stands for Small Missions for Advanced Research in Technology. Description SMART-1 is the first of ESA’s Small Missions for Advanced Research in Technology. It travelled to the Moon using solar-electric propulsion and carrying a battery of miniaturised instruments. As well as testing new technology, SMART-1 is making the first comprehensive inventory of key chemical elements in the lunar surface. It is also investigating the theory that the Moon was formed following the violent collision of a smaller planet with Earth, four and a half thousand million years ago. Launched 27 September 2003 Status Arrived in lunar orbit, 15 November Conducting lunar orbit science operations. Notes SMART-1 is the first European spacecraft to travel to and orbit around the Moon. This is only the second time that ion propulsion has been used as a mission's primary propulsion system (the first was NASA's Deep Space 1 probe launched in October 1998). SMART-1 is looking for water (in the form of ice) on the Moon. To save precious xenon fuel, SMART-1 uses 'celestial mechanics', that is, techniques such as making use of 'lunar resonances' and fly- bys.

2007 May 29EXPReS Board Meeting: SA1Slide #33 e-VLBI to South America (2)

2007 May 29EXPReS Board Meeting: SA1Slide #34 e-VLBI to China 1 G1 G 2.5 G 155 M 100 M 1 G1 G 50 M 1 G1 G 34 M HKOEP 2.5 G ORIENT: 2.5 G TEIN2: 622 M 2.5 G SURFnet

2007 May 29EXPReS Board Meeting: SA1Slide #35 Connection Sheshan (near Shanghai) – JIVE (via HongKong, Chicago). RTT 360 ms, real distance 8800 km, path length km e-VLBI to China (2)

2007 May 29EXPReS Board Meeting: SA1Slide #36 e-VLBI to China (3): Connectivity tests Sheshan-JIVE

2007 May 29EXPReS Board Meeting: SA1Slide #37 e-VLBI to China (4) First tests (iperf with UDP, to rule out tuning issues): HongKong – JIVE: 577 Mbps (lightpath 622 Mbps) Sheshan – Beijing: 560 Mbps (822 Mbps with TCP!) Beijing – HongKong: 1.85 Mbps (!) Follow-up HongKong – JIVE: steady 320 Mbps with TCP HongKong – Beijing: most lossy part of connection Latest result: nearly 800 Mbps SHAO-Hong Kong with TCP