Utilizes U.S. Funds? Design Executing Agent? USACE is responsible for executing VE per their policy and include Const. clauses. Non DoD Agency is responsible.

Slides:



Advertisements
Similar presentations
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Advertisements

US Army Corps of Engineers Budgeting Process
Roles and Responsibilities. Collaborative Efforts to Improve Student Achievement Guidelines for developing integrated planning and decision making processes.
Washington Headquarters Services Executive Services Directorate Information Management Division OMB Collection Number Paperwork Reduction Act – DoD Public.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
1 Roles - Responsibilities ROLES - RESPONSIBILITIES.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
ACA Directorate of Contracting, Fort Bragg RECAP OF COR FUNDAMENTALS BY ADMINISTRATION DIVISION 15 February 2007.
In-sourcing Guidelines and Procedures By Dr. John Anderson. PDASA, FMMR, OASA(M&RA)
NPR C NASA Real Property Management
Engineer Circular Requests to Alter USACE Projects
March 5,  Purpose  How it Works  Review Topics  Review Findings  Tips 2.
Office of Business Development Training
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
ZHRC/HTI Financial Management Training
Department of Economic Opportunity WelcomeTo Contract Review Form Training.
1 Army Policy and Procedures for Proper Use of Non-DoD Contracts Ed Cornett Procurement Policy and Support July 13 & 19, 2005 Presented to: Army Requiring.
Travel Data Collection and Reporting GSA, Office of Governmentwide Policy GSA, Federal Acquisition Service.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
GSFC Procurement Operations Division Effective March 1, 2006 Updated August 22, 2012 Appointment and Training of Contracting Officers and Other Buying.
United States Department of Agriculture Office of Procurement & Property Management Charge Card Service Center USDA Purchase Card Coordinators Procedures.
1 Joint ASIA / BIA / TRIBAL Data Management Committee A Proposed Centralized Data Management Function Sponsored by the Assistant Secretary for Indian Affairs.
1 NASA Earned Value Management Update August 2006.
Tammy Shelton Acting Associate Staff Chief, HROD ORD Manager’s Meeting January 24, 2006 The Competitive Sourcing Challenge.
COMPETITION REQUIREMENTS
THE AFMC MOASP Air Force Materiel Command D. Brian Morris HQ AFMC/PKV (937) I n t e g r i t y - S e r v i c e - E x.
Master Recreation Plan Program-Level Management Plan  What is a Program Management Plan?  How is it developed?  What’s next?
United States Department of Agriculture Office of Procurement & Property Management Charge Card Service Center USDA Purchase Card Coordinators Policy Training.
US Army Corps of Engineers BUILDING STRONG ® Mr. Daniel Carrasco Chief, Contracting Division USACE – LA District 13 OCT 2015.
JE-RDAP INDUSTRY DAY W911QY-16-R-0010 Kevin Parker 08 DEC 2015
RESEARCH FOUNDATION PURCHASING PROCUREMENT OUTREACH TRAINING LEVEL I INTRODUCTORY INFORMATION Award Management Services.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Utilizes U.S. Funds? Design Executing Agent? Const. Executing Agent? USACE is responsible for executing VE. USACE responsible for including VE clauses.
Introduction to Sponsored Projects Accounting Navigating the University: Research & Resources Management Retreat August 19, 2014.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Implementing Program Management Standards at Duke Energy.
Small Purchase of Professional Service Providers Administrative Rule R
FAR Part 38 Federal Supply Schedule Contracting 1.
2. Submit laboratory booking form Requestor (external/internal) Manager/ Lab Engineer/ Technical Assistant/ Technician 5. Requestor to Propose a new date.
Role Responsibilities
First Things First Grantee Overview.
ABOUT STUDENTS REGIONAL CONSORTIUM
NASA Procurement Career Development and Training Policy
The Administration’s Small Business Agenda
National Hydrology Project
Call for competition process
Earned Value Management
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
NASA Procurement Career Development and Training Policy
Fiscal Agent Role and process for SwP
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
PRIP 101 Revolving Fund and the Plant Replacement and Improvement Program (PRIP) ER Nov-18.
Royalty Accounting and Revenue Processing System (RAPS) Certification
Grants & contracts Back to Basics CS9.
FACULTIES LAB BOOKING AND KEY MANAGEMENT
APUR 101 Introduction to USCA Purchasing
Financial Management Modernization Program
Registration, Role Request, and Appointment for OA/OPCs and A/OPCs
Roles and Responsibilities
US Army Corps of Engineers Civil Works Audit: Journey to an Opinion Briefing for: ASMC PDI National Capital Region March 6, 2008.

TIBC Budget Formulation Improvement Project

Who is the Head of Activity?
Step 3. Initiate Proposal
Purpose Provide an update on recent major changes to law, policy, and guidance that affect the way we conduct IA&E activities National Defense Authorization.
APUR 101 INTRODUCTION TO USC AIKEN PURCHASING.
Presentation transcript:

Utilizes U.S. Funds? Design Executing Agent? USACE is responsible for executing VE per their policy and include Const. clauses. Non DoD Agency is responsible for executing VE per their policy and include Const. clauses. VE Required Authority: USACE Senior Accountable Official for VE Authority: Non DoD Senior Accountable Official for VE VE Not Req’d REFERENCES: A.Pub. L. 111–350, §3, Jan. 4, 2011, 124 Stat ; 41 USC Value engineering B.Office of Management and Budget (OMB) Circular A-131 (26 DEC 2013) C.DODI , DoD Value Engineering (VE) Program D.OSD-ATL Letter, Value Engineering (VE) and Obtaining Greater Efficiency and Productivity in Defense Spending (06 DEC 2011) E.AR 5-1 Management of Army Business Operations (12 Nov 2015) F.ER (Change 1), Army Value Engineering (01 JAN 2011) G.COMMANDER’S INTENT: Greater Efficiency and Productivity through Value Engineering (VE) (25 APR 2012) H.Lower Limit Threshold (LLT) revised to $2M by Chief, OVE, 13 FEB 2013 NO YES DoD & Civil Works Non DoD Ref. E Ref. B, C & E VE Required Document VE Study/Activity (LOE) or LO/LOB/LOS in VMP DETERMINES VE REQUIRED WORKLOAD / ANNUAL PLAN VE Required VE Not Required LOB / LOS Delegated Authority: MSC VPgM LO or Waiver Authority: HQ-CVO Optional if grouping of projects is possible for greater ROI -or- VEO determines there is opportunity PROJECTS PROCUREMENTS WHAT REQUIRES VE & WHO HAS AUTHORITY ON VE? Screening Tool (Initial Screen) Screening Tool <$2M $2M - $10M >$10M KEY NOTES/CONSTRAINTS Strategy Selection  District VEO works with Program Managers to develop the Annual Plan.  PM must schedule & resource VE studies  PM must document VE Study, Low Opportunity or Waiver in P2.  Value Management Plans (VMPs) are developed by the VEO with the PDT based on the VE Screening/Strategy Selection Tool.  LO/LOB/LOS and Waiver Requests must be submitted and approved no later than start of design or study will be required.  Decision to request waiver shall be made by the PM prior to approved PMP, with VMP & justification included.  VMA (or equivalent) may facilitate if <$10M, but must adhere to VM standards and have results validated by independent QA.  CVS (or Equivalent) shall facilitate all VE Studies >$10M.  Consider grouping like projects into program-wide studies for Regional application.  COS and Programmatic Studies must be updated at a minimum every 3-5 years in order to remain valid for application.  VE required on functional & operational requirements of Standard Designs (CoS).  Standard Design Studies do not negate the requirement for individual Project studies by Geographic District.  Programmatic studies, ie., Dredging, require MSC VE PgM approval (HQ for Enterprise studies) PRIOR to executing the study..  MSC VE PgM’s with COS/CX responsibilities within their AOR, must ensure COS studies are performed, and COS collects (at least annually) ALL studies performed USACE-wide that are based on their Standard.  Services (IT, Furnishings, Office, Supplies, etc…) require VE and must be coordinated with MSC VE PgM. Version Document VE Study/Activity (LOE) or LO/LOB/LOS in VMP Ref. G LO/LOB/LOS or Waiver Delegated Authority: MSC VPgM USACE verifies VE addressed &/or performed prior to advertising Contract Waiver/LO $10M+: HQ CVO approval LOB/LOS $10M+: MSC VPgM approval Ref. B & C Ref. B & E Waiver/LO/LOB/LOS Prior to Start of Design VE Performed meets Standard? USACE must address / perform VE Award Contract No Yes SSST / VMP Programmatic / Bridge typically lower ROI