EMI INFSO-RI-261611 EMI 1 (Kebnekaise) Updates 22.08.2011 C. Aiftimiei (INFN) EMI Release Manager.

Slides:



Advertisements
Similar presentations
HTCondor and the European Grid Andrew Lahiff STFC Rutherford Appleton Laboratory European HTCondor Site Admins Meeting 2014.
Advertisements

The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Services Abderrahman El Kharrim
EMI is partially funded by the European Commission under Grant Agreement RI Recent ARC developments in the EMI project Andrii Salnikov, Ievgen Sliusar.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) WMPROXY API Python & C++ Diego Scardaci
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Simply monitor a grid site with Nagios J.
A. Sim, CRD, L B N L 1 OSG Applications Workshop 6/1/2005 OSG SRM/DRM Readiness and Plan Alex Sim / Jorge Rodriguez Scientific Data Management Group Computational.
EMI INFSO-RI EMI Structure, Plans, Deliverables Alberto Di Meglio (CERN) Project Director ATLAS Software & Computing Week Geneva, 21 July 2011.
EMI 1 Release The EMI 1 (Kebnekaise) release features for the first time a complete and consolidated set of middleware components from ARC, dCache, gLite.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Using gLite API Vladimir Dimitrov IPP-BAS “gLite middleware Application Developers.
Using the EMI testbed ARC middleware Marek Kočan University of P. J. Šafárik, Košice.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks State of Interoperability Laurence Field.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid Site Monitoring with Nagios E. Imamagic,
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
EMI is partially funded by the European Commission under Grant Agreement RI Discovering Infrastructures with EMI Registry (EMIR) Emidio Giorgio.
EMI is partially funded by the European Commission under Grant Agreement RI SA2 – Development Tools Andres Abad Rodriguez SA2.4 Tools Activity Leader.
DPM Python tools Ivan Calvet IT/SDC-ID DPM Workshop 10 th October 2014.
EMI INFSO-RI Accounting John Gordon (STFC) APEL PT Leader.
Installation and Configuration of A-REX Iván Márton (NIIFI) Zsombor Nagy (NIIFI)
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
CREAM Installation&Configuration Sara Bertocco INFN Padova 11 th International GridKa School 2013 – Big Data, Clouds and Grids.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
EMI INFSO-RI EMIR integration in BDII Maria Alandes Pradillo (CERN) Information System Product Team.
EMI INFSO-RI ARC tools for revision and nightly functional tests Jozef Cernak, Marek Kocan, Eva Cernakova (P. J. Safarik University in Kosice, Kosice,
The new FTS – proposal FTS status. EMI INFSO-RI /05/ FTS /05/ /05/ Bugs fixed – Support an SE publishing more than.
EGEE-II INFSO-RI Enabling Grids for E-sciencE YAIM Overview MiMOS Grid tutorial HungChe, ASGC OPS Team.
EMI INFSO-RI EMI 1 (Kebnekaise) Highlights Status and Plans Cristina Aiftimiei (INFN) EMI Release Manager EGI – Technical Forum Lyon, September,
EMI INFSO-RI Argus The EMI Authorization Service Valery Tschopp (SWITCH) Argus Product Team.
EMI INFSO-RI EMI Quality Assurance Tools Lorenzo Dini (CERN) SA2.4 Task Leader.
Automatic testing and certification procedure for IGI products in the EMI era and beyond Sara Bertocco INFN Padova on behalf of IGI Release Team EGI Community.
TP: Grid site installation BEINGRID site installation.
EGEE 3 rd conference - Athens – 20/04/2005 CREAM JDL vs JSDL Massimo Sgaravatto INFN - Padova.
EMI Inter-component and Large Scale Testing Infrastructure Danilo Dongiovanni INFN-CNAF.
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
EMI INFSO-RI /04/2011What's new in EMI 1: Kebnekaise What’s new in EMI 1 Kathryn Cassidy (TCD)‏ EMI NA2.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
Security recommendations DPM Jean-Philippe Baud CERN/IT.
John Gordon EMI TF and EGI CF March 2012 Accounting Workshop.
EMI is partially funded by the European Commission under Grant Agreement RI Future Proof Storage with DPM Oliver Keeble (on behalf of the CERN IT-GT-DMS.
Security Area Christoph Witzig (SWITCH) on behalf of John White (HIP)
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
Enabling Grids for E-sciencE EGEE-III INFSO-RI EGEE and gLite are registered trademarks Francesco Giacomini JRA1 Activity Leader.
CREAM Status and plans Massimo Sgaravatto – INFN Padova
UNICORE and Argus integration Krzysztof Benedyczak ICM / UNICORE Security PT.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI solution for high throughput data analysis Peter Solagna EGI.eu Operations.
EMI is partially funded by the European Commission under Grant Agreement RI EMI Status And Plans Laurence Field, CERN Towards an Integrated Information.
Argus EMI Authorization Integration
EGI Operations Management Board
StoRM: current status and developments
gLite Information System
NGI and Site Nagios Monitoring
Delegation methods in EMI
EMI 1 (Kebnekaise) Updates
Classic Storage Element
Use of Nagios in Central European ROC
Security aspects of the CREAM-CE
Andreas Unterkircher CERN Grid Deployment
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
EMI Interoperability Activities
Ipv6 nella Griglia Vincenzo Ciaschini (INFN) CCR/INFNGrid 2011
EMI 1 (Kebnekaise) release preparation status
EMI 1 (Kebnekaise) Updates
GFAL 2.0 Devresse Adrien CERN lcgutil team
EMI: dal Produttore al Consumatore
Francesco Giacomini – INFN JRA1 All-Hands Nikhef, February 2008
UMD update 11 Joao Pina (EGI/LIP).
EGEE Middleware: gLite Information Systems (IS)
UMD 2 Decommissioning Status
Argus The EMI Authorization Service
a middleware implementation
Presentation transcript:

EMI INFSO-RI EMI 1 (Kebnekaise) Updates C. Aiftimiei (INFN) EMI Release Manager

EMI INFSO-RI EMI 1 Update 5 & 6 Future Updates 2 Outline

EMI INFSO-RI ● EMI 1 Update 5: ● ARC CE, ARC Clients, ARC Core, ARC gridftp server, ARC Infosys – v Revision Release ● VOMS Java API, v – Revision Release ● WMS v – Revision Release ● new version of the emi-release, v , which now automatically configures the yum-priority plugin to give EMI repositories precedence over EPEL. ● 3 EMI 1 (Kebnekaise) Update 5 ARC CE

EMI INFSO-RI ● EMI 1 Update 6: ● BDII core v Minor Release: – issues fixed are related to packaging and the templates provided by the glite- info-provider-service component – new useful feature - improved status command which detects that the BDII is not updating or to detect hanging BDII – yaim configuration has also been improved so that the BDII will automatically start on reboot – glite-info-provider-service, v : ● completely new GLUE 2 provider for VOMS ● GLUE2 resource info of WMS ● new GLUE 2 template for the CEMon ● VOMS, WMS (wmproxy) and CEMon templates and scripts have been updated to reflect the new paths, environment variables, RPM names and documentation locations in EMI, and hence are no longer compatible with gLite installations 4 EMI 1 (Kebnekaise) Update 6 (1)

EMI INFSO-RI ● BDII site v – Revision Release: ● GGUS #72527: bdii-config-site: wrong path in /var/lib/bdii/gip/provider/glite-info-provider-service-bdii-site GGUS #72527 ● BDII top v – Revision Release: ● GGUS #72561: bdii-config-top: missing /etc/bdii/gip/glite-info-site- defaults.conf GGUS #72561 ● GGUS #70443: glite-info-plugin-fcr: cron job error GGUS #70443 ● RfC #84230: bdii-config-top: BDII_HOST variable is set to SITE_BDII_HOST RfC #84230 ● FTS v – Major Release: ● packaging has been changed to install into system directories ● no longer dependencies on globus ● Initial experimental publishing of FTS service information in Glue 2.0 format ● FTS now supports restarting/partially resuming failed transfers 5 EMI 1 (Kebnekaise) Update 6 (2)

EMI INFSO-RI ● StoRM SE v – Revision Release ● RfC #123 - Storage Space data Initialization RfC #123 ● GGUS #72464: wrong protocols in lcg-gt do not give proper srm error, and fills the frontend logs GGUS #72464 ● GGUS #72683: Wrong paths for backend logrotate GGUS #72683 ● RfC #135: Cron file points to wrong logrotate file RfC #135 ● WMS v – Revision Release: ● GGUS #73035: wmproxy authorization breaks with longer proxy chain GGUS #73035 ● WMS addresses the problem causing authorization failure when submission to the WMS is done using a proxy retrieved from Myproxy (as this is the case in Nagios tests) 6 EMI 1 (Kebnekaise) Update 6 (3)

EMI INFSO-RI Next Update - 22.Sept.2011 ● APEL parsers v – Revision Release ● GGUS #71264: SGE parser reading wrong fields GGUS #71264 ● RfC #85096: APEL LSF parser to include config option to set normalisation by hostFactor RfC #85096 ● ARGUS v – Minor Release ● GGUS #72093: TERENA proxy does not work with Argus PEPd GGUS #72093 ● GGUS #73010: Argus needs improved memory limits and logging configuration GGUS #73010 ● RfC #84846: PEPd doesn't update link timestamp in gridmapdir RfC #84846 ● dCache v – Revision Release ● Fixed a regression introduced in ; Fixed portmap registeration: Previous releases registered TCP even when only UDP was enabled; Fixed attribute caching. 7 EMI 1 (Kebnekaise) Future Updates

EMI INFSO-RI ● gLExec v – Revision Release ● GGUS #70718: yaim's glite-glexec_wn.post error GGUS #70718 ● UNICORE Client v – Revision Release ● RfC # : HTTP timeout parameters are not used RfC # ● UNICORE TSI v – Minor Release ● RfC # : - a user should be able to set access permissions and access control lists for files and directories etc. through UNICORE RfC # ● RfC # : - JSDL POSIXApplication problem with Output RfC # ● UNICORE/X v – Minor Release ● RfC # : - Absolute vs. relative paths in IstorageAdapter RfC # ● RfC # : - File upload can change directory permission as a side effect RfC # ● RfC # : - NPE when destroying server-to-server file transfer RfC # ● RfC # : - JSDL POSIXApplication problem with Output RfC # EMI 1 (Kebnekaise) Future Updates (2)

EMI INFSO-RI ● Hydra v – Major Release 9 EMI 1 (Kebnekaise) Future Updates (3)

EMI INFSO-RI Thank you Use Insert Header & Footer to set this field 10 Use Insert Header & Footer to set this field EMI is partially funded by the European Commission under Grant Agreement INFSO-RI