1 Sam Childress. 2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait.

Slides:



Advertisements
Similar presentations
MINOS sensitivity to dm2 and sin2 as a function of pots. MINOS sensitivity to theta13 as a function of pots Precision Neutrino Oscillation Physics with.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
1 Some Radiation Protection Challenges: Deep Underground vs. Shallow Beams Sam Childress - Fermilab 9 Nov. 2012CERN NBI
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
NO A Experiment Jarek Nowak University of Minnesota For NOvA Collaboration.
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
F Project X Overview Dave McGinnis October 12, 2007.
Long Baseline Experiments at Fermilab Maury Goodman.
Future Neutrino Physics Mitch Soderberg Fermilab Institutional Review June 6-9, 2011.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Accelerator Operations and PIP Sergei Nagaitsev DOE OHEP briefing 6 March 2014.
1 Future Short-Baseline Neutrino Experiments Workshop – March 21, 2012 Workshop on Future Short-Baseline Neutrino Experiments March 21, 2012 Fermilab David.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
NuMI Primary BooNE / NuMI S. Childress (FNAL) Primary Beams for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Craig Moore and Al Russell Includes.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
LBNE Beamline Planning and Options Vaia Papadimitriou Manager of the LBNE Beamline Accelerator Division Headquarters - FNAL P5 Meeting at.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Ff Neutrino Time of Flight measurements (with MINOS) Phil Adamson 12 th September 2012.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
NuMI Flux, Leonidas Aliaga William & Mary July 25, 2012 Current Uncertainties And Future Plans International Workshop on Neutrino Factories, Super Beams.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Horn and Solenoid Options in Neutrino Factory
News and brief overview of Beamline plans for the next few months
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
NuSTORM - μ Storage Ring with Injection
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
Presentation transcript:

1 Sam Childress

2 S. Childress NNN11 Existing Fermilab Neutrino Beams 120 GeV NuMI 8 GeV BNB 2 J. Strait

3 S. Childress NNN11 NuMI BNB Planned New Neutrino Beam LBNE GeV 3 J. Strait

4  Conventional Design - neutrinos from decay of pions & kaons  Booster Neutrino Beam (BNB) 8 GeV, 5e12 ppp at 6 Hz [2013 Upgrade to 15 Hz] Experiments supported:  MiniBooNE, SciBooNE, MicroBooNE  Neutrinos at Main Injector (NuMI) 120 GeV, 4e13 ppp at 2.06 sec, 360 kw [2013 upgrade to 4.9e13 ppp at 1.33 sec, 700 kw] Experiments supported:  MINOS, ArgoNeut, PEANUT, MINERvA, NOvA, SciBath, MINOS+ 4

5 Fermilab Neutrino Beams: Strengths and Challenges  A major strength of FNAL neutrino beams has been sustained operation in parallel with Tevatron collider program. More than 1e21 protons on target for both BNB and NuMI  Most technical challenges have been of learning curve type, not fundamental limits. Do NOT use “high” strength steel in intense radiation environment Initial problems with horn water cooling for both – solved early Recent NuMI target cooling problems – challenging design, welding quality degraded in later targets. Now all critical welds done at FNAL  Tritium mitigation has been particularly challenging for deep NuMI beam. Beam traverses a protected aquifer region

6 BNB Antineutrino Beam Operation since 2005 >1.4e21 PoT

7 Pulses at 15 Hz, (5 Hz average) 180 kA In operation for 7 years and 325 million pulses 7

8 NuMI Beam m 2 m Beam layout – profile view

9 NuMI Long Baseline 735 km baseline Fermilab to Soudan, Mn. For NOvA off axis beam, 810 km to Ash River, Mn.

GeV protons Focusing Horns 2 m 675 m15 m 30 m Target Decay Pipe π-π- π+π+ νμνμ νμνμ Neutrino energy tuned by moving target (usually Low Energy ) Change horn polarity to select ν μ or ν μ 10 NuMI Neutrino Beam

11 NuMI Targets Integrated PoT for six NuMI graphite targets Horizontal line is design lifetime specification. Target #7 with FNAL welding is working well. NuMI target positioned inside horn in LE position. Tight spatial constraints with need for low mass system.

12 NuMI Beam Parameters for Week ending 31 Oct. ‘ e19 PoT Consistency is the goal!

13 NuMI Weekly Protons on Target Neutrinos low energy Anti-neutrinos low energy Medium – high energy >1.35 e21 PoT

14  NOvA will operate with Medium Energy tune  14 mrad off-axis => 2 GeV narrow band beam. 14

15 NuMI Beam Power Upgrades for NOvA  Injection and Slip Stacking in 8 GeV Recycler Ring Reduce cycle time by 2/3 sec 12 Booster batches instead of 11  Single turn injection from RR into Main Injector Faster 120 GeV ramp to 1.33 sec 4.9 e13 ppp and 700 kw  New target design No longer in horn. Option for much more robust design First NOvA target delivered soon.  New medium energy horn location  Greater separation between horns  Accelerator shutdown for NOvA upgrade begins spring 2012

16 LBNE – Next Generation FNAL Long Baseline Beam

17 Why a New Beam Facility for LBNE  Need a longer baseline – 1300 km ~ ideal  Need to plan for higher power Project X beam NuMI facility upgrades to 700 kw for NOvA are near practical limits  Need beam optimized for lower energy and smaller electron neutrino background Shorter, wider decay pipe  Need to aim beam toward designated site for next generation far detector – Homestake mine in South Dakota \ J.Strait

18  Beam pointed to Homestake => 1300 km baseline  Broad-band beam, covering 1 st and 2 nd maxima (2.5 and 0.8 GeV)  Minimize high energy tail above ~5 GeV  Minimize e and “wrong-sign”   Tunable => proton beam 60 < E < 120 GeV  Design for initial power = 700 kW, upgradeable to >2 MW  Beam and Near Detector on Fermilab site  Stringent radiation safety requirements  Minimize cost! 18

19 Beam Extraction from FNAL Main Injector for LBNE  Viable extraction choices are limited by site geometry to MI-60 (NuMI/NOvA) or MI-10 (8 GeV injection)  Have evaluated in detail options for these two extraction locations, MI-60 Deep and MI-10 Shallow – with very different facility construction methods, optimized for site constraints. 19 X X X

20 Target hall location chosen by reaching sufficient depth to enable structural rock cover above the hall. Maximum primary beam slope angle limited to -150 mr. Bend down at this angle, then bend up to target at -101 mr. NuMI Style Design Target hall Glacial till 200 meter decay

21 Significantly shorter decay than NuMI (675 m) enables target hall elevation placement out of rock - chosen to balance construction requirements for elevated proton beam versus decay region and absorber located partially in rock. Potential advantages of reduced cost and improved tritium mitigation. Rock Glacial till Added soil200 meter decay Project decision this week for beam facility choice

22 Decay Shield & Water Rejection for LBNE Shallow Beam meter concrete shield surrounded by dual layer geomembrane barrier and drainage collection

23  Reference Design stable for more than a year S. Holmes

24  MW-class, multi-GeV, proton beams supporting multiple kaon, muon, and neutrino based precision experiments;  Neutrino beam for long baseline neutrino oscillation experiments, based on a capability of targeting at least 2 MW of proton beam power at any energy between 60 – 120 GeV. Simultaneous operations of the rare processes and neutrino programs;  Path toward a muon source for possible future Neutrino Factory and/or a Muon Collider;  Possible missions beyond EPP with nuclei and energy applications S. Holmes

25 Summary  Intense neutrino beams have been an important and productive component of the Fermilab program for many years.  We look toward the enhanced capabilities with our near term beam upgrades for BNB and NOvA, and next generation LBNE and Project X to enable fundamental advances in our understanding of the mysterious neutrino.