US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
CMPB Alain Blondel 14 April STATUS OF MICE.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Project Sponsor Project Manager 04/24/ Major Projects Quarterly Review.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
US Construction Project: SSs, PRY, Cavities and test program 1.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
MICE Spectrometer Solenoids Step IV running
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Comments on the February DOE Review
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Completion of the MICE-US construction project
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
<<Project Name>> – Engagement Status
Presentation transcript:

US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015

Outline US MICE Budget FY thru Final Step US MICE Budget Breakdown by Activity & FY R&D Risk Register Milestones Balance Sheet – show how this fits within the DOE Funding Profile of $ 9 M, $ 6 M, $ 3 M plus $ 1.9 M carryover FY14 => FY15 April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)2

US-DOE MICE Budget Profile through Final Step April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)3 dashed = only MICE Construction see Mark Nov 2014 Nov 2014 est. April 2015 est. Starting in FY2015 DOE requires MICE to include: MICE Construction, MTA Testing of RF Components, MICE Experiment Support, and Program Management MICE Construction + MICE Experimental Support + MTA Test RF Components + Program Management

Ramp-down by Activity & FY April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)4

Ramp-down by Activity & FY April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)5 FY 17 Construction is Final Step Installation, Commissioning, and Integration

R&D Risk Register April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)6 Retired

R&D Risk Register Sorry that was too small to read! see posted version for details Highlights since November 2014 Review: –Retired one RISK (at no additional cost): Step IV Partial Return Yoke Fit-up Completion –Updated the Target Retirement Dates –8 R&D RISKs remain active: –RF Systems $ 191 K & 60 work days Magnetic Shielding $ 83 K & 30 work days Spectrometer Solenoids $ 262 K & 40 work days Wgt. Risks & Durations $ 535 K 130 work days Total Unweighted => $ 1,592 K 535 work days April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)7

Milestones April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)8 Device Independent Bitmap from.pdf Major US MICE Deliverables: updated (Nov2014) MICE Step IV Magnetic Shielding Full Delivery Complete in UK 7may2015 (27april) MICE Final Step Magnetic Shielding Received in UK 12april2016 ( 5may) MICE RF Module #1 & RF Module #2 Arrives in UK 16june2016 (18may) Alan Bross will discuss the technical status of these US MICE deliverables tomorrow

Balance Sheet April 16, 2015 Peter H. Garbincius | MICE Review (RAL, April 16-17, 2015)9