Preliminary Hazard Analysis of the ESS Cryomodules Nuno Elias Cryogenics Engineer Engineering an Integration Support Division Safety review of Spokes and.

Slides:



Advertisements
Similar presentations
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Advertisements

Superconducting Spoke Resonator Cavities and Cryomodules
1 Requirements Conformance for SRF cryomodules October 2014 Lund P. Bosland (on behalf of the CEA/Irfu and CNRS/IPNO teams) ESS elliptical cryomodules.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Interface issues on Super-FRS magnets test at CERN
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS cavities interfaces
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Vacuum tank relief for Super-FRS long multiplet cryostat CrYogenic Department in Common System (CSCY) GSI, Darmstadt Yu Xiang.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Cryogenic Safety- HSE seminar CERN,
Final Design Cryogenic and mechanical configurations
Status of the M-ECCTD F. Peauger - P. Bosland
Cryomdoule Test Stand.
CERN – Zanon discussions
Cryomodule test stand at ESS site
WP5 Elliptical cavities
Medium beta cryomodule demonstrator M-ECCTD
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
Block 4 and Cluster D - Safety
2K Cold Box Process Design
V. Veshcherevich Cornell University
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
KEK injector cryomodule
ESS elliptical cryomodule
Cryomodules Challenges for PERLE
ESS elliptical cryomodule
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Source Spallation European (ESS)
Cryomodule Design for CW Operation 3.9 GHz considerations
Burst Disc Experiences at CEA Test Stand
Presentation transcript:

Preliminary Hazard Analysis of the ESS Cryomodules Nuno Elias Cryogenics Engineer Engineering an Integration Support Division Safety review of Spokes and Elliptical Cryomodules, 9 th June 2016

Outline Introduction Hazards related to leaks Hazards Related to thermal events Hazards Related to Sub-system failure Hazards Related to Mechanical failure Hazards Related to Control and Command Hazards Related to Operator 2

Cryomodule 3 CRYOGENICS INSULATION VACUUM INSULATION VACUUM BEAM VACUUM BEAM VACUUM RF CONTROL SYSTEMS CONTROL SYSTEMS TUNING SYSTEM ALIGNMENT SYSTEM SRF CAVITY

The Spokes Cryomodule 4 Donut (left and right side) Pick-up Port Ring (left and right side ) Coupler port

The Spokes Cryomodule 5 4 HPR Ports Coupler port Bellows Helium tank

The Spokes Cryomodule 6 Power coupler double wall cooling C-W transition Cold Tuning System 2-phase manifold Alignment tie rods Power coupler antenna cooling Ceramic disk, 100 mm diameter 400 kW peak power (335 kW nominal) Antenna & window water cooling Outer conductor cooled with SHe Double spoke cavity (3-gaps), MHz,  =0.50 Goal: Eacc = 9 MV/m [Bp= 62 mT ; Ep = 39 MV/m] 4.2 mm (nominal) Niobium thickness Titanium Helium tank and stiffeners Lorentz detuning coeff. : ~-5.5 Hz/(MV/m) 2 Tuning sentivity  f/  z = 130 kHz/mm

The Spokes Cryomodule 7 Length : 2.88 m Diameter: 1.304m

The Spokes CM 8 Cold/warm transition Gate valves Inter-cavity belows Thermal shieldVacuum vessel Prototype cavity Power Coupler interface

Elliptical Cryomodules 9 6-cells medium beta (0,67) cavity Length= mm 6-cells medium beta (0,67) cavity Length= mm 5-cells high beta (0,86) cavity Length= mm 5-cells high beta (0,86) cavity Length= mm MediumHigh Geometrical beta Frequency (MHz) Iris diameter (mm)94120 Maximum surface field in operation (MV/m)45 Nominal Accelerating gradient (MV/m) Nominal Accelerating Voltage (MV)14,318,2 Q 0 at nominal gradient> 5e9 Cavity dynamic heat load (W)4,96,5

Elliptical CM 10 Length : m Diameter: 1.324m

Elliptical Cryomodule Power Coupler Positioning jacks (3 at 120°) Hanging rods Trap door (CTS access) 50K Thermal shield (aluminium) Biphasic He pipe Cavity Positioning optical devices

Elliptical Cryomodule Cavity Spaceframe Access trap Bursting disk Cryogenic valve Door knob and RF wave guide Vacuum vessel (stainless steel) Guide rail and wheel

Hazard Identification Hazard: Potential threat – People – Equipment – Environment Risk: Severity vs. Likelihood of occurrence (event) Minimization of Risk (mitigation): -Measures to minimize occurrence and potential consequences -Measures in case event happens consequences are minimized. 13

Hazards related to leaks Helium Supply Line (HP): – Cavity and Power coupler helium supply (4.5K, 3bar) Vapor Low-pressure Line (VLP): – Low pressure circuit to maintain cavities at 2K, 27 mbar to 1.43 bar) Thermal Shield (TS): – Supply and return lines of the shield circuit (40-50K, bar) Auxiliary Circuits/Media – Purge Line, Safety relief line, Helium guard. – Beam vacuum (BV) – Insulation vacuum (IV) – Ambient air (AIR) – Antenna Cooling water (Water) 14

Go to Document 15 Preliminary Hazard Analysis based on 2013 study: ESS _to be updated_NE_Hazid V3_Protocol_WS6_cryomodules_ docx ESS _to be updated_NE_Hazid V3_Protocol_WS6_cryomodules_ docx Present Study focused in cryomodule operation: Hazard Analysis. pdf

Conclusions A hazard analysis focused on the cryomodule operation is being produced – Various types of hazards have been studied. – Most critical scenarios have been identified and related to sudden beam vacuum loss. Work is on-going, expected input from technical demonstrators tests will add valuable input. 16

Cryomodule Flow and Instrumentation 17

Pressure safety 18 Define the maximum allowable working pressure (PS) used for the design of the vessel and piping – The safety relief devices must be in place to prevent any event from pressurizing the vessel or piping above the MAWP. Evaluate all pressure sources and possible mass flow rates Size the vent line to the relief device – Temperature and pressure of flow stream – Evaluate pressure drop Size the relief device Size downstream ducting, in necessary

Pressure Equipment Directive 19 PS < 0,5bar The equipment is not on the scope of the 97/23/CE directive Article 3-3 The equipment must be designed and manufactured according to workmanlike way. No CE marking Category I The manufacturing must be more documented, especially with internal production control Pre-study: TUV- Nord: Legal QC requirements for pressure equipment Pre-study: TUV- Nord PS=1.04 bar V= 48 l

20

Pressure Scale: Safety (1/2) 21 *Safety Relief Line at atmospheric pressure

Pressure Scale: Safety (2/2) 22 *Safety Relief Line at 1.1 bar

Summary of Cryogenic Circuits and Relief Devices Circuit #Operating Pressure Thermal Shield19 to 19.5 bar 4.5 K helium circuit3 bar 2 K helium vessel30 mbar Vacuum vesselClose to 10-6 mbar 23 Circuit #DeviceSet PressureDischarges to Thermal ShieldRelief valve (SV60)24 bargSV Relief Line 4.5 K helium circuitRelief valve (SV02)3 bargSV Relief Line 2 K helium vesselControl valve (CV90)1.5 bara ≈ 0.5 bargSV Relief Line 2 K helium vesselRelief valve (SV90)0.64 bargSV Relief Line 2 K helium vesselBurst Disk (RD90 and RD91)0.99 bargAmbient Vacuum vesselRelief valve (SV70)0.02 bargAmbient

Summary of Cryogenic Circuits and Relief Devices ScenarioCritical heat flux Insulated surfaces with at least 10 layers of MLI0.62 W/cm2 Non-insulated surfaces3.8 W/cm2 24 Circuit #DeviceSet Pressure ScenarioFlow [kg/s] Minimum flow section [mm 2 ] Practical Dimension D[mm] Discharges to Thermal ShieldRelief valve (SV60)24 bargLoss of insulation vacuum SV Relief Line 4.5 K helium circuit Relief valve (SV02)3 bargJT,Filling valve, and PC closed0.092Section of pipe10SV Relief Line 2 K helium vessel Control valve (CV90) 1.5 bara ≈ 0.5 barg Outlet valve closed (Protection of sudden pressure rises) 0.082Kv> 1125SV Relief Line 2 K helium vessel Relief valve (SV90)0.64 bargOutlet valve closed (Protection of sudden pressure rises) SV Relief Line 2 K helium vessel Burst Disk (RD90 and RD91) 0.99 bargBeam vacuum breakage x 100Ambient Vacuum vesselRelief valve (SV70)0.02 bargLoss of insulation vacuum Due to He pipe breakage Ambient [1] Safety Aspects for LHe cryostats and LHe Transport containers, W. Lehmann, G. Zahn, ICEC, 1978, GB. [2] Pressure Protection Against Vacuum Failures on the Cryostats for LEP SC Cavities, G. Cavallari et all, Fourth Workshop on RF Superconductivity, 1989, Japan. [3] Experimental Tests of Fault Conditions During the Cryogenic Operation of a XFEL Prototype Cryomodule, Boeckmann et all, ICEC, 2008, Korea. [4] ISO 21013: Cryogenic vessels - Pressure-relief accessories for cryogenic service > Part 3: Sizing and capacity determination [5] ISO 4126: Safety devices for protection against excessive pressure – (Bursting disc safety devices. Safety valves, etc) Reference: Technical Note – Safety Equipment for the ESS elliptical cryomodules

Helium Low pressure circuit 25 2 bursting disk at each tip + upstream safety relief valve 36° Heat exchanger The circuit is designed to reduce as low as possible the overpressure in case of beam vacuum failure by using a continuous DN100 diameter for the diphasic pipe, large curvatures and 2 DN100 bursting disks at each extremity. A 36° angle is set up for the tank nozzle in order to allow the insertion of the cavity string and the cooling circuit inside the spaceframe To valve box