A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.

Slides:



Advertisements
Similar presentations
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Advertisements

Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
WG1 summary P. Colas, S. Duarte Pinto RD51 Collaboration meeting in Bari October 7-10, 2010.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Situation with industry Rui de Oliveira RD51 CERN October
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
GE1/1 GEM technology - High trigger performance during of late Phase I and throughout Phase II -Demonstrator in YETS2016 approved Plan for installation.
15/07/2010Rui De Oliveira1 Update on large size GEM manufacturing Rui de Oliveira.
HV connection for a Common GEM foil design Aiwu Zhang
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Overview of Production for CMS GE1/1
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
M. Bianco On behalf of the ATLAS Collaboration
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Marcus Hohlmann (Florida Institute of Technology) with C. Armaingaud, S. Colafranceschi, R. De Oliveira, and A. Sharma (CERN) on behalf of the CMS GEM.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Resistive protections Rui de Oliveira 09/12/15
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
TEMPLATE DESIGN © CONFIG. 1: 12mm(Drift) / 12mm(T1) / 12mm(T2) / 12mm(Induction) CMS Endcap Resistive Plate Chamber Muon.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
GEM, Resistive M-Bulk, ThGEM detector production. Rui De Oliveira, Cosimo Cantini, Antonio Teixeira, Olivier Pizzirusso, Julien Burnens Annecy 26/04/2012.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Large size MPGD production: -GEM update -read out board infos Rui De Oliveira CERN 28/04/2009.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
Trigger & Tracking detector for CMS
GEM, Micromegas detector production. detector’s dynamic range detector’s dynamic range Rui De Oliveira Catania 24/11/ /11/20111Rui De Oliveira.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GEM Integrated PCB readout and cooling
Large volume GEM production Rui De Oliveira TE/MPE/EM
New MPGDs at CERN PCB Workshop
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Production ad Quality control of RPCs for the CMS muon barrel system
Stefano Colafranceschi on behalf of:
Helsinki T2 status Risto Orava/ on behalf of Kari Kurvinen
On behalf of the GEMs for CMS Collaboration
Same geometry, but different size of the rim
Development of Gas Electron Multiplier Detectors for Muon Tomography
EIC Tracking Meeting, March 26, 2012
Phase 2 R&D – Brief Introduction –
(On Behalf of CMS Muon Group)
Alejandro Busto, Devkumar Roy, Liam Shaw, Joseph Weatherwax
A DLC μRWELL with 2-D Readout
Presentation transcript:

A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta Upgrade Team CMS GDD RD51 Oct 8-11, 2010 UPDATE AT RD51 COLLABORATION MEETING BARI PROTO GE1/1 – With The Largest GEM Foils PROTO GE1/1 – With The Largest GEM Foils

2 CMS - Redundant Muon System

STAGED Initial RE system –tailored to budget Reduced RE system |  | < 1.6  =2.4  2.4 3

RPC Region Rates Hz/cm 2 LHC (10 34 cm 2 /s) High Luminosity LHC 2.3 x LHC (10 35 cm 2 /s) Phase II SLHC ?? RB30Few Hz - kHz (tbc) RE 1, 2, 3,4   30Few 100kHz (tbc) Expected Charge in 10 years 0.05 C/cm C/cm 2 ~ C/cm 2 RE 1,2,3,4   500Hz ~ kHzFew kHzFew 10s kHz Total Expected Charge in 10 years (0.05-1) C/cm 2 few C/cm 2 Few 10s C/cm 2 Estimated Particle rates in Forward CMS 4

CMS High Eta MPGD - Workshop, 30 September 2010 CONSTRUCTION OF THE LARGE PROTOTYPE CMS GE1/1 CONSTRUCTION OF THE LARGE PROTOTYPE CMS GE1/1

6 GE1/1 3D Model Drift Electrode + Alu cover GEMs Readout PCB Alu. Cover Spacer frame

7 GE1/1 Drift Electrode Cu Foil – 5um Kapton stack 300um ( ) Aluminum plate 3mm The operation voltage is 4.5kV The leakage current is 20nA in open Air Working point

8 GE1/1 3D Model Drift Electrode + Alu cover GEMs Read out PCB Alu. Cover Spacer frame

9 GE1/1 – GEM Foils Sectorization 6 sectors 7 sectors 9 sectors 13 sectors 1 HV GEM sector = 100cm 2 35 HV sectors in total Using Single Mask(SM) production technology At 100cm2 the probability of discharge is negligible 4 Eta sectors

Rui’s Workshop builds Largest Sized Single Mask GEMs Rui De Oliveira10 CMS: 1m x 45cm (6 pieces)

cross section pictures 11

Introducing GEM #3 – electrodes… 12 TOP BOTTOM

Comparison with *standard GEM * from external supplier 13

14 Chemical Polyimide etching Second Polyimide etching Copper electro etching Stripping Reality GEM single mask process

15 Single Mask technology Elimintaes alignment of the holes issue Size 990/45.5/22 mm Production of CMS Single Mask (SM) GEMs

Rui’s Workshop Single Mask GEMs Rui De Oliveira16 CMS: 1m x 45cm (6 pieces)

17 Stretching and Framing Procedure for GE1/1 GEMs GEM foil goes in a special oven for heating up to 37degree

18 Stretching and Framing Procedure for GE1/1 GEMs Gluing the spacer frame on the GEM foil.

19 The GEM foil, with glued frame, stays in the oven heated up to 37 o C over 24 hours. Stretching and Framing Procedure for GE1/1 GEMs

20 HV test of the GE1/1 GEMs → Applying up to 500V between the top sector and the bottom layer plus the 2 neighbor sectors as well. Testing sector by sector Before and after stretching and framing, the GEMs are passing QT of the GE1/1 1. Optical inspection 2. HV test before stretching 3. HV test after stretching Criteria - Current less 10nA

21 Results of the HV test. Sectors/Voltage/Current HV test of the GE1/1 GEMs

22 Drift Electrode + Alu cover GEMs Readout PCB Alu. Cover Spacer frame 3D Model of GE1/1

Siena June Gas Flow Simulation Gas flow studies and simulation with ANSYS Taking in to account all the environmental conditions – gravity, different gas mixtures,temperature, atmospheric pressure Gas Mixtures studied Ar-CO % Ar-CO2-CF % GAS FLOW SIMULATION

Siena June Based on the simulations we have the optimal gas flow I/O design. Minimizing the number and size of the gas pockets Gas I/O Design

25 GE1/1 3D Model Drift Electrode + Alu cover GEMs Readout PCB Alu. Cover HV divider Spacer frame

Siena June GE1/1 - HV Divider GE1/1 – HV Divider has built in RC Filter The divider is made by HV SMD Resistors. 2 stage RC HV LPF HV Divider And Protection Drift Ed GEM1 T1 HV in GEM2 T2 GEM3 Ei GND

HV divider Production steps

I/V measured plot

Glued drift and 3 gems

Weights on top

Corners

Without weights

Waiting the readout in safe

Sep 30, 2010 M. Hohlmann - Florida Tech Statement on Participation in CMS High-eta Muon Upgrade Project 35 R&D at FIT FLORIDA - CMS High-  upgrade New, cost-effective GEM foil thermal stretching technique via infrared heating under clean room conditions in our high- bay lab (RD51 Technical Note in prep.) along long side of frame CMS high-  prototype drift foil Works well !

READOUT STUDIES

37 Readout PCB 0.8mm pitch 1.6mm pitch 256 strips for each eta partition 128 channels per connector PCB thickenss = 3mm

38 Readout Board Noise Test VFATs TURBO Noise test is ongoing with the VFAT electronics.

2 READOU T s tested *OLD* No ground plane *NEW* - Ground Plane layer integrated between strip plane and electronics

The new readout VFAT side

The new readout VFAT slot

The new readout 1 defect is found There is non etched copper in the low eta partition end. Due to this we have a floating copper area very close to our strips. It is source of noise. Non etched copper. – Source of noise

The old readout We found 2 disconnected strips. The noise level The best noise level

The old readout We put inside the grounding envelope one dummy gem to simulate conditions in the detector. Now preparing the same conditions with the new readout and do the tests. The worst noise level

New readout Noise level Looks better then the old one. The best noise level

46 GE1/1 Status and Plans ItemPresent Status GEM foils productionDone GEMs HV test90% finished Stretching and Framing procedure 90% finished Drift ElectrodeDone HV divider productionIn progress HV divider testPending Readout PCB productionDone Readout PCB testingIn progress Ready with prototype for 18.Oct.2010 OK