Susannah Moran Karen Diaz. Assessment  Authentic Tasks: –Do you think the United States should sign the Kyoto Protocol? Write a memo to the president.

Slides:



Advertisements
Similar presentations
Performance Assessment
Advertisements

Project-Based Learning and Performance-Based Assessment.
Technology Integration LiteracyQPP Related Arts Mathematics7 Pillars Content Specific Competencies Comprehensive Education.
PORTFOLIO.
Project Based Learning Linda K. T. Ullah, M.A., M.Ed Support Coach Friday Institute for Educational Innovation
Elements of Constructivist Teaching Practices EdSe 4244 Social Studies Methods.
SUNY Cortland Conceptual Framework … our shared vision for preparing candidates to work in P-12 schools.
Project-Based Learning
 Project-based learning is considered an alternative to teacher-led classrooms.  Project-based learning emphasises learning activities that are student-
Science Inquiry Minds-on Hands-on.
Constructivism: The Learners Own World of Knowledge
Meeting SB 290 District Evaluation Requirements
Rediscovering Research: A Path to Standards Based Learning Authentic Learning that Motivates, Constructs Meaning, and Boosts Success.
By Weizmar Lozada. Content-based Instruction Use of content from other disciplines in language teaching. Build on students’ previous knowledge. Students.
Interstate New Teacher Assessment and Support Consortium (INTASC)
Brooke Bennett. *National Educational Technology Standards and Performance Indicators for Teachers* 1. Facilitate & inspire student learning and creativity.
Professional Development through the Authentic Academic Achievement Project.
Project Based Learning
KRISTEN SHAND, PH.D. CALIFORNIA STATE UNIVERSITY, FULLERTON DEPARTMENT OF SECONDARY EDUCATION Project-Based Learning Intel © Essentials Online.
Project-Based Learning Training What is the problem with current education methods?
Gwen Giddens, Director, LRS Project-Based Learning.
Delaware Professional Teaching Standards 3.0 Content Knowledge 4.0 Human Development and Learning 5.0 Diverse Learners 6.0 Communication 7.0 Learning Environment.
Connected Learning with Web 2.0 For Educators Presenter: Faith Bishop Principal Consultant Illinois State Board of Education
Thomas College Name Major Expected date of graduation address
Authentic Learning and Assessment Erin Gibbons Five Standards of Authentic Instruction  Higher-Order Thinking  Depth of Knowledge  Connectedness to.
21st Century Skills: Just what are they?. Student Outcomes.
ationmenu/nets/forteachers/2008s tandards/nets_for_teachers_2008.h tm Click on the above circles to see each standard.
“Tele” = at a distance (far) Collaboration = co-labor (shared labor) Tele-collaboration = sharing labors at a distance Telecollaboration.
Transforming Learning with Technology a Portfolio by Jeanette Gorzelitz Created in EdL 325 Instructional Technology Fall 2009 As a teacher it is critical.
What is Interact? Active learning projects that: use authentic situations engage students challenge students.
Chapter 1 Defining Social Studies. Chapter 1: Defining Social Studies Thinking Ahead What do you associate with or think of when you hear the words social.
Ch. 3 StudyCast SarahBeth Walker. NETS-T Standard 1  Teachers use their knowledge of subject matter, teaching and learning, and technology to facilitate.
L. Ullah Project Based Learning Linda Ullah, M.A., M.Ed. Support Coach--Friday Institute Online Instructor--Foothill College
Project-Based Learning (PBL) Vivene Robinson.
WebQuest: A Brief Introduction. Life-long Learning Authentic Situation Subject knowledge Generic skills Scaffolding Rubrics.
Constructivism A learning theory for today’s classroom.
1. Administrators will gain a deeper understanding of the connection between arts, engagement, student success, and college and career readiness. 2. Administrators.
Christine Yang March 17, As a teacher it is critical for me to demonstrate mastery of technology teacher standards. ISTE-NETS Teacher Standards.
Session Objectives Analyze the key components and process of PBL Evaluate the potential benefits and limitations of using PBL Prepare a draft plan for.
Put Your Classroom On A 21 st Century DI-IT Create Engaging Technology Rich Differentiated Classroom Environments Create Engaging Technology Rich Differentiated.
Introduction to STEM Integrating Science, Technology, Engineering, and Math.
Designing Opportunities for Learning Chapter 2 By Sheri Higgs.
A Portfolio by: Mary S. Weinaug Enter.  As a teacher it is critical for me to demonstrate mastery of teacher standards  ISTE-NETS Teacher Standards.
Chapter 1 Integrating UBD and DI An Essential Partnership.
Project Learning Project Based Learning NCCVT School District Professional Development.
Teaching Philosophy: CONSTRUCTIVISM Prepared By: Group III.
CONSTRUCTIVISM Eddelyn D. Gupeteo, PhD Seminar-Workshop on Constructivism Ateneo de Davao University Grade School Unit April 27, 2012.
21 st Century Skills Jason McLaughlin Kean University EMSE
Effective mathematics instruction:  foster positive mathematical attitudes;  focus on conceptual understanding ;  includes students as active participants.
EFFECTIVE STRATEGIES FOR TEACHING Establishing the Foundations for Teaching and Learning.
Chapter 5: Reflections on Schools, Teaching and Supervision Changing Views Instructional Improvement Checking Your Own Beliefs.
5 E’s - Instructional Model
DPI 10 Teaching Standards
Competency Based Learning and Project Based Learning
Inquiry-based learning and the discipline-based inquiry
TECHNOLOGY STANDARDS FOR EDUCATORS BONNIE SMITH MAY 2, 2011
E-learning and E-assessments
Iowa Teaching Standards & Criteria
GOOD MORNING.
Teaching All Children: Planning and Assessment
Project–Based Learning
Project Category Grade Level
TEACHING TO ENHANCE LEARNING AND DEVELOPMENT
Comparison of Learning Paradigms: Learner-Centered vs
Elements of Constructivist Teaching and learning Practices
Project-Based Learning Integrating 21st Century Skills
Teaching Science for Understanding
CONSTRUCTIVISM Submitted To: Ma’am Misbah Yasmeen BPGCW (Air University)
Presented by: Jenni DelVecchio, Renee Mathis, and Kevin Powell
CONSTRUCTIVISM & CONTINUOUS COMPREHENSIVE EVALUATION
Presentation transcript:

Susannah Moran Karen Diaz

Assessment  Authentic Tasks: –Do you think the United States should sign the Kyoto Protocol? Write a memo to the president of the United States supporting your position.  Assessment Tools –Checklist of skillsChecklist of skills –Rubric instruction assessment

What is Constructivism?

Constructivism is a theory which tries to answer the question “How do we learn?”

Students construct their own knowledge.

The Characteristics of Constructivist Learning & Teaching  The teacher asks open-ended questions and allows wait time for responses.  Higher-level thinking is encouraged.  The class uses raw data, p rimary sources, manipulatives, p hysical, and interactive materials.

The Characteristics of Constructivist Learning & Teaching  Student autonomy and i nitiative are accepted a nd encouraged.  Students are engaged in dialogue with the teacher a nd with each other.  Students are engaged in experiences that challenge hypotheses and encourage discussion.

The constructivist teacher…  Sets up problems  Monitors student exploration  Guides the direction of student inquiry  Promotes new patterns of thinking  Uses: –raw data –primary sources –interactive materials –authentic tools

Classes can take unexpected turns as students are given the autonomy to direct their own explorations.

What is Project-Based Learning?

Project-Based Learning is a comprehensive approach to instruction. As students participate in projects, they develop an array of interdisciplinary skills. (Math, Language Arts, Fine Arts, Geography, Science, and Technology)

Project-Based Learning The defining features of Project-Based Learning include  Content  Conditions  Activities  Results

compelling ideas Content compelling ideas  Problems presented in their full complexity  Students find interdisciplinary connections between ideas  Students struggle with ambiguity, complexity, and unpredictability  Real-world situations which engage students’ interest

student autonomy Conditions student autonomy  Students take part in a community of inquiry and pursue work in a social context.  Students are called upon to exhibit task/time management behaviors both individually and as part of the group.  Students direct their own work and take control over their own learning.  Students simulate the professional work of the scholar, researcher, engineer, reporter, planner, manager, and other practitioners.

investigative and engaging Activities investigative and engaging  Students conduct multi-faceted investigations for extended periods of time.  Students encounter obstacles, seek resources, and solve problems in response to an overall challenge.  Students make their own connections among ideas and acquire new skills as they work on different tasks  Students use authentic tools.  Students get feedback about the worth of their ideas.

real-world outcomes Results real-world outcomes  Students generate complex intellectual products that demonstrate their learning.  Students participate in their own assessment.  Students are held accountable for their work and actively choose how they will demonstrate learning.  Students exhibit growth in frequently neglected areas important for real-world competence.

Project-Based Learning Four Reasons to Use Project-Based Learning  In depth focus on central ideas and salient issues  Search for answers and solve problems  Collaboration and self-directed learning  Develop and integrate skills into lifelong learning habits

Project-Based Learning helps learners develop all of their intelligences and makes learning a part of living, not just a preparation for it. Project-Based Learning addresses students’ individual learning styles. Multiple Intelligences

Group work emphasizedStudents work alone Assessment is ongoing, authentic, and performance-based Assessment = Testing Diverse points of view encouragedFinding the "correct" answer Interactive InstructionDidactic Instruction Student build knowledge while teacher acts as facilitator Teacher transmits knowledge to students Primary Sources and Manipulatives Textbooks + Workbook Flexible CurriculumFixed Curriculum Big ConceptsBasic Skills PBL ClassroomTraditional Classroom What Does A Project-Based Learning Classroom Look Like?

A Vision Becomes Reality

Assessment  Authentic Tasks: –Do you think the United States should sign the Kyoto Protocol? Write a memo to the president of the United States supporting your position.  Assessment Tools –Checklist of skillsChecklist of skills –Rubric instruction assessment Student takes control of learning. Teacher directs students to resources. Teacher and student assess student understanding. Students design and create products to demonstrate learning. Teacher guides direction of inquiry and promotes new patterns of thinking.