Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October 2011 - H.

Slides:



Advertisements
Similar presentations
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Advertisements

Time Stamping and archiving of PLC data
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Industrial Control Engineering PXI software support and accelerator integration.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Industrial Controls Engineering Department SM18 Control Systems overview Jeronimo ORTOLA Roberto SPERONI EN/ICE Technical Committee 25 th June 2015.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
19-September-2007 Helsinki EURISOL-EURONS Town Meeting 1/6 High-Performance Pulsed-Power for Radioactive Ion Beams HP 3 RIB Luis Redondo ISEL, IST, CFNUL,
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
Industrial Controls Engineering Department Proposals for an Improved CERN PXI Support First CERN PXI Users Group meeting - 19 th October H. Reymond.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
Review of superconductors and magnet laboratories Summary of measurements and instrumentation issues
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
Industrial Control Engineering ADE Rapid Application Development Environment based on LabVIEW 1.
ATTRACT is a proposal for an EU-funded R&D programme for sensor, imaging and related computing devlopment Its purpose is to demonstrate the value of European.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
FP7: EuCARD after a year of preparation… A.Jeremie.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
Industrial Control Engineering ADE Rapid Application Development Environment.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
The EP Department Manfred Krammer.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
INTRODUCTION FOR THIS (2nd) REVIEW ON LPL (LHC PERFORMANCE LIMITATIONS) => DURING RUN II ( ) E. Métral Follow-up of (1st) review on LPL during.
Universal Standards for Social Performance Management
Matters arising RADWG - 3 July 2009
NATIONAL MEDIA VISITS Visits for print, radio, agency media during LS1 April April 2014 Hello, In order to reply to the huge amount of visit requests.
ToPO Tools for PS Operation
CERN Mobile network migration
Introduction to CERN F. Hahn / CERN PH-DT1 10. May 2007.
Plans towards CC in the LHC a US – centric perspective
At NOVA Acoustics Ltd we provide acoustic surveys that are bespoke for your needs.
PS status 10 August – 17 August 2017
Welcome to the Work Experience Information Evening
Oct 22 Group Leaders Planning meeting
CERN presentation & CFD at CERN
Operating systems and Internet Infrastructure services
Plans for ions in the injector complex D
June 22, 2017 Burkhard Schmidt for the DT coordination team
85th ACCU Meeting of 9 September 2009
ECE361 Engineering Practice
Hollow e- lens, Cryogenic aspects
DT Magnet Activities Overview FH 25/06/2010 -FH.
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
the CERN Electrical network protection system
Elena Wildner, CERN EUROnu meeting Paris June
Math October 25 N1 and N2.
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Assessment Activities
EN-ICE Technical Committee SM18 activities & projects
Testing CERN Magnet – Test Station Interface
Development of built-in diagnostics in the RADE framework (EN2746)
2003 test beam with 25 ns bunched muons
LHC upadtes.
REFLECTION IN PRACTICE
Charging For Active Network Management / Flexible Connections
Plenary
NANPA Oversight Working Group Status Report to the NANC October 17, 2001 Chair Pat Caldwell.
workshop June Discussion.
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H. Reymond - EN/ICE

Industrial Controls Engineering Department Why a survey about PXI ? 2  Since 01/2009 EN-ICE is in charge of CERN wide support for industrial control systems, including National Instruments products (legacy from IT/CO & AB/CO-IS)  During last 2 years, PXI systems have been heavily spread :  In all CERN domains : DAQ, RF Analysis, Motion Control, Feedback Stabilization Measurement, Kicker magnet control, …  For Accelerator & Experiments : PS, SPS, LHC, TOTEM, UA9, CRISTAL, CAST, NA58, ALPHA, …

Industrial Controls Engineering Department Why a survey about PXI ? 3  Today EN-ICE aims to improve the support for the PXI systems  A global view of the used equipment is necessary to be able to propose dedicated services  So a survey was needed to get an overview of CERN  It has been done in 2 steps:  Looking for the PXI Users  Asking them for information about their systems

Industrial Controls Engineering Department Looking for the PXI Users 4 *PXI* *RT* *LV* 238 PXI systems found

Industrial Controls Engineering Department Looking for the PXI Users PXI systems found 22 persons as PXI User 30 persons as PXI Responsible 12 resp. 93 PXI systems 1 resp. 125 PXI systems 17 resp. 20 PXI systems Survey

Industrial Controls Engineering Department Launching the survey toward all the PXI Users & Resp. 6 Received description for 75 PXI systems = 67 % of returns 12 resp. 93 PXI systems 17 resp. 20 PXI systems 113

Industrial Controls Engineering Department Survey results 7 77 chassis of 15 types

Industrial Controls Engineering Department Survey results 8 70 controllers of 13 types

Industrial Controls Engineering Department Survey results 9

Industrial Controls Engineering Department Survey results cards of 52 types

Industrial Controls Engineering Department Survey results 11

Industrial Controls Engineering Department Questions 12