Business Development Workshop Series Presents: Keep it Flowing ! Presenters: Jasvir Grewal, P.E./ Rizwan Siddiqi, PE Water Systems Engineering Department.

Slides:



Advertisements
Similar presentations
PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Anne Arundel County Department of Public Works
1 Water System Improvements Upcoming Construction for Drinking Water Capital Projects by Jodye Russell.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
City of Los Angeles Venice Dual Force Main Project
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Water System Planning Study
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Development Requirement/Tools Brown Bag Luncheon Series Site Due Diligence Jarrod Likar and Tim McDonough.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Olathe PWPES Current Survey Methodology and Practices.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
NC AWWA-WEA 95th Annual Conference
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Presented by: David S. Prinzhorn, P.E. Town Engineer/Public Works Director/Utilities Manager Town of Cave Creek.
Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Stormwater Management
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Transportation Engineering Business Development Workshop Department M
Update on PI Modeling and Nitrogen Removal at Blue Plains
Sun City Lift Station Odor Control Improvements
CITY OF HALLANDALE BEACH
INTRODUCTION TO TRENCHLESS TECHNOLOGY
Manchester’s CSO Program: A Look Behind and a Look Ahead
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Water Department has Six Divisions
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Calvin, Giordano & Associates, Inc.
Water Main Rehabilitation Cured-In-Place-Pipe Technology
2018 Construction Projects $98 M
Colchester Interceptor System Improvements Project
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
City of Valdosta Utilities Department.
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Facilities Plan Update
It Takes Two: Office and Field, Working Together
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Metropolitan Tunnel Redundancy Program Update
Estimated Available Nutrient Credits
Richland Creek Water Supply Program Program Update
Presentation transcript:

Business Development Workshop Series Presents: Keep it Flowing ! Presenters: Jasvir Grewal, P.E./ Rizwan Siddiqi, PE Water Systems Engineering Department Agenda Services and Clients Major Projects Future Outlook Business Development Workshop Purpose & Goals We all play a role in developing EBA’s business. Hence, we need to understand what EBA does, who are our clients and how EBA employees can contribute to marketing EBA and overall business development WSE Senior Managers: Mitch Harris, PE ; Richard Davis, PE Rich Shagogue, PE; Dick Berich, PE Marty Soma, PE ; John Tabak, PE Joseph Danquah, PE; Artie Polk Jasvir Grewal, PE; Ana Evangelista

Water Systems Engineering Department  Started In 2005  In 2006, Water and Wastewater Department moved to Laurel, MD  50+ Staff, 30 in office & rest field staff and on client site  In 2011, name changed from “Water and Wastewater” to “Water Systems” More than 50% of our work is as Prime Consultant

Water Systems Services Catch All Statement: Water Systems (Study, Design, and Construction Administration) Services Include:  Infrastructure/Utility Design  Pumping Stations & Force Mains  Treatment Plant Design & Upgrades  Field Inspection Services (MH, Pipelines)  Constructability Review/Value Engineering  Program/Project Management Services

Water Systems Clients  Anne Arundel County  Baltimore County  City of Baltimore  Carroll County  DC Water  NASA/Goddard Space Flight Center, MD  St. Mary’s County  State of Maryland - DGS  WSSC  Other Consultants

Infrastructure/Utility Design

Infrastructure -Water and Sewer Pipeline  Multiple On-call and BOA type Contracts  Multiple Utility Agency Experience  40 Miles of Water Main Design and Permitting  60 Miles of Sewer Main Designs and Permitting  Size Range From 4 inch to 120 inch  Both Gravity and Pressure Systems

Infrastructure-Water and Sewer Pipeline Sewer Evaluation:  CCTV Inspections  Over 15 PACP/MACP Certified Staff  NASSCO Certified PACP/MACP Trainer  Evaluated 100+ miles of Gravity Sewer  Evaluated 10+ miles of Forcemain (Desktop and Field) Sewer Trenchless Rehab Methods:  Cured-in-place pipeline (CIPP)  Pipe Bursting  Grouting  Point Repair  Horizontal directional drilling (HDD)  Micro tunneling  Jack & bore  Open-cut/Conventional

Infrastructure -Water and Sewer Pipeline Water Transmissions  Same Trench and Relocation Design  Emergency Driven Schedules  PRV and Meter Vault Assessment and Design  Valve & Fire Hydrant Exercising Program  Hydraulic Modeling and Model Update

Infrastructure -Wastewater Collection Systems  New and Rehabilitation of Existing Systems  Condition Assessment of Exist Pipelines and MHs  Consent Decree Driven Schedules  Open Cut and Trenchless Sewer Rehab  MH Evaluation and Rehab Design  Permits

Hydraulic Modeling (H&H) WSSC- WaterGEMS Unlimited Node Model  Hydraulic Analysis & Modeling  Develop, Calibrate and Validate Model  Assess Existing Capacity  Estimate Future Flow Conditions  Evaluate Ability to Transmit Peak Flows  Calculate Hydraulic Grade Line Baltimore City – WaterGEMS Model  Constructed City Data Model  Scenarios for Cost Allocation between Baltimore City and County

WSSC Water and Sewer Rehabilitation BOA Contract No. PM0003A07  12 Task orders: Replacement of 16.2 miles of 3, 6, 8, 10 inch water mains  Capacity analysis, surveying, geotechnical, utility designations, test pits, cost estimating, environmental permitting, community outreach Challenges: Time sensitive schedules Bypass design Environmental permits $2.0M BOA Contract for 2 Years - Expired 2010 $4.0M BOA Contract for 3 Years - Expires 2013

WSSC Water and Sewer Rehabilitation BOA Contract No. PM0006A07 18 Task orders: Relocation, Rehab/Replacement of Sanitary Sewers to Correct Overflows  New Sewer Design  Rehab– Manhole Grouting & Lining  CIPP Lining  Pipe Bursting  Point Repairs  Permitting ( MDE, SHA, MN-CPPC, DNR, Montgomery and Prince George’s Counties and other Municipality permits) $1.5M Base Contract $2.0M Option Year 1 Contract Renewal

Urgent Needs Wastewater Engineering Services Project 1042E City of Baltimore Rehab, Repair, Replacement of Sanitary Sewers  13 Task Orders  Onsite Support Services  Correction of Stream Erosion Around Manholes  Eliminate Basement Sewer Backups  Design of New Sewer Systems Services  Surveying  Geotechnical Investigations  Utility Designations and Test Pits  Permitting  MOT  Community Outreach

Pumping Stations and Force Mains

Pumping Stations & Force Mains Design and Rehab of Pumping Stations  Rehabilitation and Upgrade  Replacement of Pumps  Code Upgrade Designs  Installation of Bypass System  Capacity Upgrade  Six SPS Upgrade in AACO Design of Force Mains  2 Miles of 36” FM for Baltimore City (Dundalk & Quad Ave) Creek Road SPS, Anne Arundel County, Maryland

Challenges: Maintenance of Traffic Utility Investigations ROW/Easements Phasing Plan Agency Coordination Odor Control Septic System Upgrade Pocomoke River State Park  Study, Design and Construction  4 Miles of Low Pressure FM  14 New Grinder Pumps  Offline Sewage Storage Facility  3.5 Miles of Force main using HDD  Pumping Station design  $3.2 M Construction Cost Presented Project at Tri-Association Conference 2011

Sanitary Pumping Station Upgrade Anne Arundel County  Design/Upgrades of Six Existing SPS  Pump Replacement  Electrical and Control System Upgrades  Temporary and Emergency Bypass Pumping  New Valve Vaults  Site Utility and Drainage  Ventilation System  Cathodic Protection  Construction Administration Services

Under An On-Call Pumping Station Design Services Baltimore County Constructability Review Construction Cost for SPS Improvements  Provided services for 7 Pumping Stations  Design Capacity MGD to 3.5 MGD

Treatment Plant Design and Upgrades

Treatment Plant Upgrades  Constructability Review/Value Engineering  Study, Planning, Design  Construction Administration  As-Built Drawings  O&M Manuals Montebello Water Filtration Plant; City of Baltimore, Maryland Marlay Taylor Water Reclamation Facility Design of Headworks St. Mary’s County Metropolitan Commission, Maryland

Treatment Facilities Wastewater Treatment Facilities  ENR Upgrades  Upgrade and Rehab of Existing Systems  Design based on Consent Decree Requirements  Permitting Water Treatment Facilities  Process Design and Upgrades  Condition Assessment and Capacity Evaluation  Filter Repair and Replacement  Pilot Testing

Montebello WFP– Filter Repairs City of Baltimore Preparation of Emergency Design Package to Rehabilitate Seven Sand Filters Bid & Construction Inspection and Management Services  7 out of 60 Filters out of service for one year  Obsolete Old Clay Tiles  Keep Plant in Service during Construction  Scope: Moving Target due to unknowns conditions  Schedule: Eight months  Budget: $1.8 M, not to exceed $2.0  24/7 Schedule: hours Shifts  Zero Accidents EBA met the schedule and budget (Presented Project at Tri- Association Conference 2012

Marlay Taylor Water Reclamation Facility ENR Upgrades, METCOM, St. Mary’s County Process Mechanical Design of New Headworks Facility Design Capacity : 24 MGD Site/Civil, Geotechnical, Surveying  New Headworks Facility- Fine Screens, Grit Removal Equipment Conveyors  Coordinate Headworks Design with Architectural, Structural, MEP & HVAC  Upgrade Storm Water Pollution Prevention Plan under NPDES

Constructability Review/Value Engineering Services  Montebello Filtration Improvements  Montebello Plant 2 Finished Water Reservoir Cover  Patapsco WWTP Nitrification Filters  Back River WWTP ENR Upgrade  Stoney Run Wastewater PS and Force Main

Field Services  CCTV inspections for sewer mains  Locating and opening manholes  Manhole location survey using GPS & inspections  Large diameter sewer pipeline inspections  Confined space services  Valve and fire hydrant exercising services  Water and sewer main corrosion testing and inspections  Filed inspections of water and sewer systems

Future Outlook  Current Backlog – 1 to 2 years  Projected Growth for next 3 to 5 Years – 20% Staff & Workload  Expanding Client Base to VA and PA

Next Presentation Structural Engineering Department Monday, October 8, 2012 (mark your calendar)