Resistive Plate Chambers for CMS and INO

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
GEMs for CMS Upgrade Muons are quite central to most of the Physics that would unfold from “CMS” Triggering and tracking with muons, is therefore a challenging.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
India-based Neutrino Collaboration(INO), INDIA1 B.S.Acharya, Sudeshna Banerjee, P.N.Bhat, S.R.Dugad, P.Ghosh, K.S.Gothe, S.K.Gupta, S.D.Kalmani, N. Krishnan,
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
RPCs for CMS – Phase I Status report L. M. Pant BARC-NPD L.M.Pant India-CMS Meet, PU, Chandigarh 05 th April, 2007.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
RPCs in CMS Supreet Pal Singh India-CMS Meeting, July 20-21, 2007
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
India CERN Meeting, BARC, 28/02/11
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
First CMS Results with LHC Beam
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
University of Wisconsin
Micromegas Vertex Tracker Status Report
DC56 R&D Goals, Schedule and Status
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Production ad Quality control of RPCs for the CMS muon barrel system
The Modular Design of CMS
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
T1 status (a selection from EDR presentations)
CMS muon detectors and muon system performance
A LARGE ATMOSPHERIC NEUTRINO DETECTOR USING RESISTIVE PLATE CHAMBERS
The Compact Muon Solenoid Detector
CMS RPC Endcap RE1 Status Report
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
ScECAL+AHCAL+TCMT Combined Beam FNAL
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
STAR TOF MRPC Mass Production & Q.C. (USTC)
Resistive Plate Chambers performance with Cosmic Rays
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
The CMS muon system performance
Study of timing properties of single gap high-resistive bakelite RPC
Limited Streamer Tube Project Summary
Presentation transcript:

Resistive Plate Chambers for CMS and INO Visit to CMS (June /July, 2005) RPC’s in CMS context O P E R A & I N O RPC Assembly Quality checks Budget Manpower 16th September Meeting L.M.Pant India-CMS Meet, BARC 20 July 2005

CMS L.M.Pant India-CMS Meet, BARC 20 July 2005

L.M.Pant India-CMS Meet, BARC 20 July 2005

calorimetres L.M.Pant India-CMS Meet, BARC 20 July 2005 Overall weight : 12,500 t Overall diameter : 15 m Overall length : 22 m Magnetic field : 4 Tesla calorimetres ECAL PbWo4 scintillating crystals HCAL Plastic scintillator & Cu sandwich iron yoke PSD Si detector Tracker Micro Strip Gas Chambers, MSGC Si microstrips Pixels Magnet Muon Barrel Drift tubes, DT Resistive Plate Chambers, RPC Muon End Cap Cathode strip Chambers, CSC Resistive Plate Chambers, RPC L.M.Pant India-CMS Meet, BARC 20 July 2005

L.M.Pant India-CMS Meet, BARC 20 July 2005

Resistive Plate Chambers Bakelite ~ 1011 – 1012 cm (melamine phenolic ion resin) fast discharge; higher rate capability (~1 kHz / cm2) Glass ~ easily available slow discharge; suitable for low rates (~10 Hz / cm2) Graphite ~ 100-150 k / □ Time resolution ~ 100 ps to a few ns  trigger detector Double and Multi gaps  improve timing and efficiency L.M.Pant India-CMS Meet, BARC 20 July 2005

Oscillation Project with Emulsion tRacking Apparatus O P E R A Oscillation Project with Emulsion tRacking Apparatus Massive Pb Emulsion target for a long baseline neutrino oscillation search Total Target = 1.8 kT (m2 of 10-3 eV2) Magnetic Field = 1.5 Tesla Bakelite RPC (1512, 3.3 m2, 4600 m2) Gas mix : Ar(48%)+C2H2F4(48%)+i-butane(4%) L.M.Pant India-CMS Meet, BARC 20 July 2005

India–based Neutrino Observatory    Cosmic neutrinos were discovered in KGF (India) in 1965 To study atmospheric neutrinos. Establish neutrino oscillations (  ). Reduce uncertainity in m2 ICAL = 50kT (~ Rs. 205 Cr.), 140 layers Magnetic Field = 1 - 1.3 Tesla Glass RPC (27000, 4m2, 107520 m2) Bakelite ? URL : http://www.imsc.res.in/~ino L.M.Pant India-CMS Meet, BARC 20 July 2005

REi/n i=1,2,3,4 & n=1,2,3 REi/1 Not sure if the RPC’s can handle the count rates for   1.6 REi/2 REi/3 L.M.Pant India-CMS Meet, BARC 20 July 2005

Entry point for India : 2 × 72 = 144 + spares = 160 Barrel End Cap End Cap -R4 -R3 -R2 -R1 +R1 +R2 +R3 +R4 RPC’s are done required in 2008-09 China : 2 × 72 = 144 + spares =160 Pakistan : 2 × 2 × 72 = 288 + spares = 300 Entry point for India : 2 × 72 = 144 + spares = 160 L.M.Pant India-CMS Meet, BARC 20 July 2005

Double gap  3 gaps in two layers  Top gap(s) Read out Cu strips Bottom gap L.M.Pant India-CMS Meet, BARC 20 July 2005

Process Flow for RE1/2,1/3 6 6 6 6 6 Bakelite Purchase Italy Cut Clean Ship to Korea Gaps Built in Seoul QC Ship to CERN Shipped to CERN Mechanics Kit prep in China Procurement Cables and pieces FEBs, Adaptor / Distribution Boards 6 Procure from Italy Order from Pakistan Ship to CERN 6 Chamber Assembly ISR Lab @ CERN 6 Construction Database 6 QC 6 Production Database Storage Installation@SX5 Commissioning L.M.Pant India-CMS Meet, BARC 20 July 2005

The tale of bakelite L.M.Pant India-CMS Meet, BARC 20 July 2005

Gap production in Korea Oiling procedure successfully transferred to Korea K O D E L Cut & cleaned bakelite sheets delivered Korea Mass production proceeding @ 40 sets / month Hot melt of PET film L.M.Pant India-CMS Meet, BARC 20 July 2005

Geometrical dimensions of the chamber 15 metres B Ri Ro Ro A D Ri C Ro  small  Ri  large  Geometrical dimensions of the chamber Station Ri Ro A B C D Thickness Z Position rpc Z of cu-strips RE1/2 2750 4644 1901 999 676 1894 30 6953 & 7235 6968 & 7250 RE1/3 5065 6820 1762 1380 1073 1755 7098-7155 7083 & 7140 Weight (kg) 45 65 All dimensions in mm L.M.Pant India-CMS Meet, BARC 20 July 2005

Geometrical dimensions of the gaps Station Gas gaps Ri Ro A B C D Thickness RE1/2 RE1/2(a) 2768 4626 1865 860 535 1858 6.0 RE1/2(b) 2780 4056 1281 760 537 1276 RE1/2(c) 4066 4614 550 858 762 548 RE1/3 RE1/3(a) 5083 6802 1726 1240 940 1719 RE1/3(b) 5098 6387 1294 1168 943 1289 RE1/3(c) 6397 6787 391 1238 1170 390 L.M.Pant India-CMS Meet, BARC 20 July 2005

Geometrical dimensions of the active area of the gaps Station Gas gaps Ri Ro A B C D Active area (M2) RE1/2 RE1/2(a) 2795 4599 1811 805 489 1804 1.170 RE1/2(b) 2807 4031 1229 705 491 1224 0.733 RE1/2(c) 4091 4587 498 803 716 496 0.378 RE1/3 RE1/3(a) 5110 6775 1671 1186 894 1665 1.736 RE1/3(b) 5125 6362 1242 1113 897 1237 1.245 RE1/3(c) 6422 6760 339 1183 1124 338 0.392 L.M.Pant India-CMS Meet, BARC 20 July 2005

Geometrical dimensions of the read-out Cu strips 1/2(b) 1/3(b) 1/2(c) 1/3(c) R I 2770 5085 3572 5635 4071 6402 R o 3567 5630 4066 6397 4624 6800 Height (D) 797.2 544.5 494.1 762.5 552.8 398 Large strip width (B) 17.5 28.7 20.2 32.9 23.2 35.1 Small strip width (C) 13.1 25.7 L.M.Pant India-CMS Meet, BARC 20 July 2005

R1/2 Drawings : Chamber, 3 gaps, active areas and read out Cu strips L.M.Pant India-CMS Meet, BARC 20 July 2005

R1/3 Drawings : Chamber, 3 gaps, active areas and read out Cu strips L.M.Pant India-CMS Meet, BARC 20 July 2005

Gas system L.M.Pant India-CMS Meet, BARC 20 July 2005

Button spacers inside a gap Gas leakage and spacer tests Button spacers inside a gap cut - opened 2 mm 10 mm L.M.Pant India-CMS Meet, BARC 20 July 2005

High Voltage tests L.M.Pant India-CMS Meet, BARC 20 July 2005

Pre-assembly of various components 3 days / person L.M.Pant India-CMS Meet, BARC 20 July 2005

Co-axial signal cable preparation L.M.Pant India-CMS Meet, BARC 20 July 2005

Honey comb panel modification L.M.Pant India-CMS Meet, BARC 20 July 2005

40 pin flat cable preparation L.M.Pant India-CMS Meet, BARC 20 July 2005

FEB’s on the cooling system L.M.Pant India-CMS Meet, BARC 20 July 2005

L.M.Pant India-CMS Meet, BARC 20 July 2005

Cosmic tests and long term stability L.M.Pant India-CMS Meet, BARC 20 July 2005

Strip response L.M.Pant India-CMS Meet, BARC 20 July 2005 65 to 96

Over all assembly of RPC 4.5 days / person ~ 1 week / person One chamber L.M.Pant India-CMS Meet, BARC 20 July 2005

Detector Investment as RPC’s for RE4 in CMS (in Rs.) 1. Detector components : a. Bakelite (10K) b. HC panel (13K) c. 3 Gaps (50K) d. Mechanics (50K)……………..….... 123K 2. Electronics : a. FEB’s (31K) b. Strip connectors (4K) c. VLSI (3K) d. HV connectors (3K)………......…… 41K 3. Services : a. HV & LV system (38K) b. Cooling system (7K) c. Gas system (21K) ……….......…….. 66K 4. Assembly & Installation : ……………………………...…………...... 14K 5. Monitoring : …………………………………………….............……….. 4K 6. Cables : ………………………………………………………….........… 24K 7. Off detector electronics : ………………………….………….....……. 3K One full assembled chamber on an average : ……………………………….. 275K  2.75 Lakhs 1.5 MCHF per end cap RE4 for CMS (144 chambers + spares = 160) : ……………..…..… 44000K  44.0 MRs. ~ Rs. 4.5 Crores Infrastructural Investment at home : ………………………………………………………….. ~ Rs. 1 Crore Total ~ Rs. 5.5 Crores L.M.Pant India-CMS Meet, BARC 20 July 2005

Advantages for investment in RPC’s for CMS at CERN Test run for INO (Rs. 500 Crore project) (at CERN everything is stretched to its limit) Reduces the gestation period for INO Exposure to frontier detector physics and engineering Trained manpower to handle INO Spruning up the required industry at home Management skills for a large scale facility L.M.Pant India-CMS Meet, BARC 20 July 2005

Alternatives Short term Phase 1a Procure the gaps from Korea and electronics from INFN Procure the rest of items from local market in India Pre-tests, assembly, final testing and delivery for QA Short term A team of 7 persons (2 physicists, 2 engineers & 3 technitians) can deliver 160 chambers over a time period of 12 months Phase 1b Fabricate the gaps and electronics (time schedule ?) Procure the rest of items from local market in India Pre-tests, assembly, final testing and delivery for QA Long term A team of (x+y+z) persons (x physicists, y engineers & z technitians) can deliver 160 chambers over a time period of 12 months L.M.Pant India-CMS Meet, BARC 20 July 2005

September Meeting at CERN (14th, 15th and 16th Sept., 2005) 14th and 15th September CMS-RPC Workshop for Completeness and Upgrades To Review Manufacturing Progress 16th September Discussions on new collaborations in RPC context for CMS L.M.Pant India-CMS Meet, BARC 20 July 2005

Prof. Amitava Raichoudhury Acknowledgements Dr. V. C. Shani Dr. S. Kailas Dr. A. K. Mohanty Prof. N. K. Mondal B. S. Satyanarayana Dr. Archana Sharma Prof. Amitava Raichoudhury L.M.Pant India-CMS Meet, BARC 20 July 2005