Planning Forum Thursday 6 th June 2013 Updates on the most recent changes to planning at national level – including new “permitted development”.

Slides:



Advertisements
Similar presentations
PLANNING COMMITTEE BRIEFING National Planning Policy Guidance (NPPG), and New Permitted Development Rights.
Advertisements

AGENTS FORUM 9 th July Agents Forum INTRODUCTIONS.
Agents and Developers Forum 21 st May Agenda 1. Welcome and Introductions 2. Proposed changes to S CIL update 4. Site Allocations DPD and.
Rushcliffe Borough Council Development Management Process Changes to Planning Legislation Andrew Pegram Service Manager, Communities February 2015.
Interested in Neighbourhood Planning in Cotswold District?
Changes to Planning Rules 30 th July 2013 Benenden Parish Council.
January 2009 – the new era for development management 2 June 2008 Neil Collar Jackie McGuire.
Unified Carrier Registration (UCR) Update August 24, 2006.
TOWNSHIP OF BECKWITH OFFICIAL PLAN REVIEW OFFICIAL PUBLIC OPEN HOUSE: AUGUST 24, 2010 OPEN HOUSE NO. 3 AGENDA  What is an Official Plan?  The Official.
Reformed commercial and industrial zones for Victoria Presentation by Paul Buxton, Statutory Systems, Department of Planning and Community Development.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
Planning law round up © Fortune Green Legal Practice This note and oral presentation including answers given to any questions are intended for general.
1 rpsgroup.com/uk Planning and development at visitor attractions: how to navigate the latest changes. Nick Laister, RPS.
Development Contributions Planning Agreements Environmental Planning and Assessment Act 1979 Part 4, Division 6, Subdivision 2 lindsaytaylorlawyers Level.
Planning Obligations & Section 106
Planning. In the news… Wind farms – govt. to end subsidies HS2 Boris Island Housing shortage – affordable homes Ebbsfleet ‘Garden City’ plan for 15k homes.
Round up of other planning news Graham Withers, Development Management “If anyone comes to me with an idea for new planning legislation I am going to shoot.
The new VicSmart process and provisions. What is VicSmart? VicSmart is a fast planning permit process A decision is expected to be made in 10 days All.
National Planning Policy Framework Based on Consultation ended 17 th October Issues affecting Local Councils.
Wider Changes Affecting Development Management Norfolk and Suffolk Planning Officers 9 December 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
SCDC SCHEME OF DELEGATION RELATING TO PLANNING APPLICATIONS October / November 2015.
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
1 Planning 4A7 Design & the Built Environment Dept. of Civil, Structural, & Environmental John O’Connor.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
Local Authorities Building Stronger Communities The Role of Philanthropy and Alternative Funding Initiatives Thursday 25th February 2016 Dublin Castle.
Councillor briefing: Recent changes in planning
PLANNING ADVISORY SERVICE SEMINAR January 2015 SECTION 106 – ISSUES, APPROACHES AND CLAUSES Presented by Shabana Anwar.
1 Scrutiny for Policies and Place Committee 19th April Planning System Reforms Alyn Jones, Interim Director of Economic & Community Infrastructure Operations.
CIL vs S106 The Regulation 123 list. The levy cannot be expected to pay for all of the infrastructure required: – 10-30% – Consider CIL as just one part.
Amendments to the Town and Country Planning (General Permitted Development) Order 2008.
TO CIL OR NOT TO CIL? Alison Fairhurst DCLG January 2016.
Planning changes & challenges Steve Barker Principal Consultant January 2016www.pas.gov.uk.
S106 Agreements Development Control User Panel. s106 agreements What are s106 agreements? How are they managed? The future:Community Infrastructure Levy.
1 Section 106: What they are and where we are DARREN WILDING DCLG.
SECTION 106 UPDATE DARREN WILDING DCLG. S106 - LEGISLATION Section 106 of the Town and Country Planning Act 1990 restricts the development or use of the.
Community Infrastructure Levy The fundamentals. Response to questions.
Phillipa Silcock Using and discharging conditions.
Threats & Opportunities? Kelvin Williams Head of Planning & Environmental Services Permitted Development.
Development contributions – S106 & CIL - update Gilian Macinnes March
New Forest National Park Local Plan Review NFALC Briefing - 21 April 2016 Steve Avery – Executive Director, Strategy & Planning.
S106 – Where we are- current context Gilian Macinnes Date: March 2015www.pas.gov.uk.
Presentation to Members of Crowhurst Parish Council
Mike Ellis Executive Director – Property + Projects
CITY OF HARARE EMERGENCY SERVICES
Professional Design and the Building Code ACT, 1992
Policy workstreams Craig Mallett Miriam Eagle.
Enforcement of Floodplain Management Regulations
Water & Wastewater Capacity Charge Work Shop
Fair Go Rates System Dr Ron Ben-David Chairperson
Introduction to Planning
Site Plan Control By-law
New Comprehensive Zoning By-law December 12, 2016.
2016 IPWEAvic Public Works Conference
After the FCC Form 471 E-rate Program Applicant Training
Public Works Department “Service is Our Business”
Economic Development & Housing Committee August 21, 2017
Neighbourhood Planning
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Neighbourhood Planning
WARD 5 ETOBICOKE- LAKESHORE TOWN HALL MEETING
Fair Go Rates System Dr Ron Ben-David Chairperson
IMPLEMENTATION OF THE SOUTH AFRICAN LANGUAGE PRACTITIONERS COUNCIL ACT, 2014 (Act No. 8 of 2014) PRESENTED TO THE SELECT COMMITTEE ON EDUCATION & RECREATION.
Overview of the Children and Families Act 2014
Planning and Design Opportunities in 2019
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Funding the Town’s Transportation Infrastructure Improvement Plan (IIP) – An Initial Discussion of Impact Fees Town Council Meeting March 1, 2017.
Simplification of Lighting and Light-Signalling Regulations
Appeal Code Changes Delynn Coldiron, City Clerk; Brad Yatabe, Legal
AUTHORS: JUAN GARCIA RYAN CHERRINGTON LEE McMELLON.
Presentation transcript:

Planning Forum Thursday 6 th June 2013 Updates on the most recent changes to planning at national level – including new “permitted development”.

Renegotiate Planning Obligations Allowing renegotiation of planning obligations (section 106 agreements) relating to affordable housing to make a development economically viable again. Limiting power to require information with planning applications Information requested must be: –be reasonable having regard to the nature and scale of the proposed development; and, –may require evidence about a matter only if it is reasonable to think that this will be a material consideration in the determination of the application. A number of reforms are now contained in the Growth and Infrastructure Act Including:

The Planning Guarantee Secondary legislation required to enact this due in October The proposal is for a refund of the application fee if no decision in 26 weeks (unless otherwise agreed), Poorly performing authorities “designated” based on speed and quality. –Speed: less than 30% of majors determined within 13 weeks averaged over a two year period, –Quality: less than 20% of major application appeals allowed, over a two year period. Allowing planning applications to be decided by the Planning Inspectorate, if the local authority has a track record of consistently poor performance.

A number of reforms came into effect last week, including: –to allow change of use for certain buildings without needing planning permission; –to increase permitted development rights for extensions to homes and business premises, in non protected areas, for a three-year period; –to increase existing permitted development for certain telecommunications equipment, such as masts and antenna;

Other reforms include: –making further changes to the operation of the community infrastructure levy (CIL). –to rationalise Technical planning guidance (shorter but retain key elements, and be more accessible). –from 4 th May this year Temporary Stop Notices can be served on caravans. But only if its considered necessary and proportionate having regard to the Human Rights Act and Equalities Legislation e.g. they have somewhere else to go.

Changes to Permitted Development “Part 3” Prior Approval: Premises in B1(a) office use will be able to change to C3 residential use; Subject to prior approval covering highways and transport impacts and contamination and flooding. (Part 3 Class J).

You can change permanently to a state-funded school from: –B1 (Business), –C1 (Hotels), –C2 (Residential Institutions), –C2A (Secure Residential Institutions), –D1 (Non-residential Institutions), and, –D2 (Assembly and Leisure) use classes. Subject to prior approval covering highways and transport impacts and noise (Part 3 Class K). You can revert from a state funded school to the previous use. (Part 3 Class L).

Agricultural buildings under 500 square metres will be able to change to a number of other uses; A1 (Shops), A2 (Financial & Professional Services), A3 (Restaurants and Cafes), B1 (Business), B8 (Storage and Distribution), C1 (Hotels), and, D2 (Assembly and Leisure). For buildings between 150 square metres and 500 square metres, prior approval covering flooding, highways and transportation impacts, and noise will be required. To qualify the building must have been in agricultural use since 3rd July 2012 or if the use began later than that date, for a period of at least 10 years. (Part 3 Class M).

Temporary Changes of Use: For a period of two years to help new and start-up businesses, buildings with; –A1 (Shops), –A2 (Financial & Professional Services), –A3 (Restaurants and Cafes), –A4 (Drinking Establishments), –A5 (Hot Food Takeaways), –B1 (Business), –D1 (Non-residential Institutions), and, –D2 (Assembly and Leisure) uses. Can change use to: –A1 (Shops), –A2 (Financial & Professional Services), –A3 (Restaurants and Cafes), and, –B1 (Business) uses. Cannot be used more than once, is subject to a floor space limit of 150 square metres & the developer must notify the LPA first (Part 4 Class D).

State Funded Schools: For a period of one academic year you can change from any use (other than a “sui-generis” use) to a “state-funded school”, so long as; –the use is approved by the Secretary of State for Education, –the latter Minister notifies the local authority, –this class is not used more than once for a particular site, –this class is subject to a condition preventing a subsequent change to other D1 uses, and, –this class does not apply to a safety hazard area, a military explosives storage area, a listed buildings, or a scheduled monument. Part 4 Class C

There are increased thresholds for business change of use. Permitted Development thresholds will change from 235 square metres to 500 square metres. Enabling change of use from: B1 (Business) to B8 (Storage and Distribution), B2 (General Industrial) to B8 (Storage and Distribution), and, B8 (Storage and Distribution) to B1 (Business). Part 3 Class B.

For a temporary period increased “permitted development” limits for “business” extensions. Industrial and warehouse development: Increase from 25% of gross floor space or 100 square metres (whichever is the lesser) to 50% or 200 square metres.  Works must be complete by 30 th May 2016 and developer must notify LPA after completion.  Must not be on Article 1(5) land or a SSSI. (Part 8 Class A). Office Buildings: Increase from 25% of gross floor space or 50 square metres (whichever is the lesser) to 50% or 100 square metres.  Works must be complete by 30 th May 2016 and developer must notify LPA after completion.  Must not adjoin a “C” Use Class, and not on Article 1(5) land or a SSSI. (Part 41 Class A).

Shops or professional services establishments (A1 or A2): Increase from 25% of gross floor space or 50 square metres (whichever is the lesser) to 50% or 100 square metres.  Works must be complete by 30 th May 2016 and developer must notify LPA after completion.  Restriction against extensions being within 2m of boundary does not apply.  Must not adjoin a “C” Use Class, and not on Article 1(5) land or a SSSI. (Part 42 Class A).

Development by electronic communications code operators: –No prior approval required for a 5 year period from 30/05/2013 to 30/05/2018. –For works in Chilterns AONB & Conservation Areas, –For the construction, installation, alteration or replacement of a telegraph pole, cabinet or line, in connection with the provision of fixed-line broadband, (Part 24 Class A).

Householder Permitted Development The changes allow single storey rear extensions: –up to 6m (attached houses), or, –up to 8m (detached houses). To be erected during the 3 year period from 30 th May 2013 to 30 th May On houses that are not on Article 1(5) land [a Conservation Area, or within the Chilterns area of Outstanding Natural Beauty], nor on a site of special scientific interest.

From the date when the Council receives a notification (with the information required by the legislation), it has a period of 42 days to notify you of one of the following outcomes: –Prior approval is not required. –Prior approval is given. –Prior approval is refused. There is a right of appeal if prior approval is refused.

Questions