Doc.: IEEE 802.11-06/738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Jacksonville Closing Report Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0300r1 Submission May 2007 Guenael Strutt, MotorolaSlide 1 LB93 Unresolved RFI Comments Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
Doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.
TGs Process, March Date: Authors: May 2006 May 2006
Coexistence Motions for LB84 Comment Resolution
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
VTS SG Montréal Closing Report
LB73 Noise and Location Categories
LB73 Noise and Location Categories
TGs Closing Report Date: Authors: January 2006 January 2006
TGs Process Date: Authors: November 2005 November 2005
Waveform Generator Source Code
TGs Montreal Closing Report
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
TGs London Closing Report
TGs London Closing Report
TGs January Final Report
[place presentation subject title text here]
Motions Date: Authors: January 2006
[place presentation subject title text here]
JTC1 Chair’s Closing Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
[place presentation subject title text here]
TGs Melbourne Closing Report
JTC1 Ad Hoc Mid-week Report
TGp Closing Report Date: Authors: March 2006 Month Year
TGs San Diego Closing Report
TGs Process, March Date: Authors: May 2006 May 2006
IEEE WG Opening Report – July 2008
TGs July Closing Report
Spectrum Sensing Tiger Team
TGs Process, March Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
TGs Process, July Date: Authors: July 2006 July 2006
TGs January Final Report
WNG Closing Report, May Authors: May 2008 Date: May 2007
TGs Dallas Closing Report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Closing Report Date: Authors: March 2007 Month Year
TGs Process, March Date: Authors: May 2006 May 2006
[ Policies and Procedure Summary]
TGu Closing Report Date: Authors: March 2007 March 2007
May 2005 CAPWAP AHC Closing Report
TGs Denver Closing Report
TGs Denver Closing Report
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
TGu Closing Report Date: Authors: May 2007 May 2007
Motion to go to Letter Ballot
TGw Chair’s Report Date: Authors: July 2006 Month Year
TGs September Closing Report
TGs November Closing Report
TGw Chair’s Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGs March Mid-Week Report
WNG SC Closing Report Date: Authors: July 2006 July 2006
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Jacksonville Closing Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 2 Abstract Report of TGs, ESS Mesh Networking Task Group, to the May, 2006 (Jacksonville, Florida) closing Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away.

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 3 TGs Closing Plenary Report An annotated agenda is available in 11-06/544r8. The minutes will be uploaded shortly. –Since Recording Secretary Stephen Rayment was unable to make this meeting, Sandra Turner was selected as Temporary Secretary. A special session of TGs was held on security at which two technical presentations were received: –“Internal Routing and Forwarding Analysis”, Jesse Walker, /672r1 –“Mesh Security Recommendations”, Jesse Walker, 11-06/708r0 A straw poll indicated that the group supported the recommendations in 11-06/708r0,

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 4 TGs Closing Plenary Report Nine other technical presentations were received: –“TBR Centralized Routing Extension”, Azman-Osman Lim, 11-06/631r2 –“Some thoughts on potential issues in mesh operation”, Kazuyuki Sakoda, 11-06/581r0 –“Optimal Tree Formation in IEEE s Mesh WLAN”, Sai Nandagopalan, 11-06/653r1 –“Packet forwarding for non-routable devices in Multi-hop Wireless Mesh”, Hrishikesh Gossain, 11-06/661r0 –“NAV Clearing Problems and Proposed Remedy”, Mathilde Beneviste, 11-06/698r1 –“Handling the Groupcast Sequence Number for Proxied Device in Multihop Mesh”, Hrishikesh Gossain, 11-06/601r0 –“How to Tune AIFS Parameters to Achieve Desired Flow Ratios to Do Congestion Flow Control”, Sai Nandagopalan, 11-06/654r1 –“Some thoughts on power saving functionality”, Kazuyuki Sakoda, /582r1 –“Connectivity reporting mechanism”, Jarkko Kneckt, 11-06/757r0

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 5 TGs Closing Plenary Report Resolution of Informal Comments on TGs D0.01: –In March, TGs confirmed a single proposal, directed the Editor to produce D0.01, and issued an informal call for technical comments on D0.01 ending 1 May –283 comments were received from 18 people. –During this meeting, 121 or about 43% of these 283 comments were resolved (110 accept, 11 reject) and the TGs Technical Editor directed to produce a D0.02 incorporating these resolutions. About half of TGs believes that the appropriate goal for the group is going to WG Letter Ballot from the September 2006 meeting. TGs is holding an ad hoc in June which was approved by the WG at the March meeting.

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 6 TGs Closing Plenary Report TGs June 2006 ad hoc Information The meeting will be hosted by Intel, point of conact Steven Conner facility: –Jones Farm # NE 25th Ave Hillsboro, OR USA Dates and tentative hours are: –6/13 10am-6pm, 6/14 9am-6pm, 6/15 9am-4pm Topics – further comment resolution and Draft improvements –Routing/Interworking; MAC Enhancements; Security; General issues, including draft organization Hotels (all have high speed Internet) Marriott Courtyard 3050 NW Stucki Place Hillsboro, OR Phone Toll Free Marriott Residence Inn NW Tanasbourne Dr. Hillsboro, OR Phone Toll Free Complimentary Breakfast Larkspur Landing Hillsboro 3133 NE Shute Road Hillsboro, OR Phone Complimentary Breakfast

doc.: IEEE /738r0 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 7 TGs Closing Plenary Report Three TGs teleconferences have been scheduled between the May and July meetings for the purpose of discussing Draft improvement and planning the June ad hoc and July meeting agendas : –17:00 pm Eastern US time, Wednesday 31 May June July Goals for the July meeting in San Diego, California: –Continue to resolve informal technical review comments. –Other presentations and refinement of the TGs Draft.