CALICE Collaboration Meeting Sept. 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Heidelberg September 2011.

Slides:



Advertisements
Similar presentations
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Casablanca/Maroc Sept
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CALICE Collaboration Meeting March 2012 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Shinshu March 2012.
14.4. Readout systems for innovative calorimeters
From FNAL to UTA Report from the Technical Board Roman Pöschl
Final CALICE OsC meeting: Status and summary of project
Test beams future plans - Discussion session-
Introductory remarks Felix Sefkow Collaboration Meeting
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
CEPC 数字强子量能器读出电子学预研进展
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
Testbeam Timing Issues.
The DHCAL: an overview José Repond Argonne National Laboratory
Report from the Technical Board
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
CALICE Collaboration Meeting KEK/Japan – April 2015
ScECAL+AHCAL+TCMT Combined Beam FNAL
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
Stéphane Callier, Dominique Cuisy, Julien Fleury
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Heidelberg September 2011

CALICE Collaboration Meeting Sept Role of Technical Board - Important executive body of CALICE - Keeping track of activities - Forum of experts of different detector technologies - Foster collaboration between different projects - Identification of needs for co-ordination and ressources - Technical preparation of strategic decisions to be taken by CALICE steering board - TB can (and maybe should?) be the main communication channel between CALICE and testbeam sites At least when preparing major beam test At least it has to ensure that this communication happens

CALICE Collaboration Meeting Sept Since May 2011 …. Once again busy months... Major beam tests (i.e. 1m³ prototypes) - RPC DHCAL - Physics Prototype of W-HCAL - SDHCAL prototype Smaller scale beam tests - Micromegas - GEMs Planning of autumn running at CERN - Beam time at PS and at SPS Revisiting of status of growing projects - Tech. prototypes of AHCAL, Scint and SiW Ecal Past: Successful data taking with physics prototypes Now: Careful investigation of technological solutions

CALICE Collaboration Meeting Sept US-DHCAL and “associates” Setup on CALICE stage as of October 2010 Test beams at FNAL: Run period October 2010: Combined running with TCMT 38/10 Run period January 2011: Standalone with TCMT replaced by RPCs Run period April 2011: Combined running with SiW Ecal Run period May/June 2011: Standalone (partially) in rotated position

CALICE Collaboration Meeting Sept GEM beam test at FTBF in August 2011 Test of different r/o electronics GEM6: Read out by 13bit KPiX GEM7, GEM5, GEM4: Read out by 1bit DCAL chip GIA: Medical image intensifier prototype with 12 bit ADC Test program - Response run - Threshold scan - HV Scan - Position scan - Pion response and pion shower Program could be fully conducted also due to extreme concern by FNAL staff Manpower is an issue (3 persons for 14 days)

CALICE Collaboration Meeting Sept CALICE WHCAL testbeam at SPS H8 Two testbeam periods 7 days in June: energies up to 50 GeV 7 days in July: energies up to 300 GeV - Very efficient and succesful data taking periods Approximately 5 Mio. triggers Kaon sample!!! - Valuable experience on how to deal with the H8 beam line Keyword wobbling

CALICE Collaboration Meeting Sept th July 2011 Scintillator tiles 3x3 cm2 (in centre) Read out by SiPM Main purpose: Validation of Geant4 simulation for hadronic showers in tungsten While being installed in SPS H8 Current HCAL setup has 38 W layers. Including active material this is ~4.8 λ Whcal Prototype Whcal stack hosts also T3B counters

CALICE Collaboration Meeting Sept SDHCAL beam test in June - Stack with 30 layers assembled (35 layers produced until June) Setup includes Mechanical structure and gas system - Mounted onto stage in H2 on June 17 th - Full beam control on June 23 rd Before sharing with CMS - Severe problems with Bringing DAQ2 into operation Switch back to USB based DAQ system (not adequate workaround) June period must be regarded as a (pre-) commissioning run However …

CALICE Collaboration Meeting Sept Promising validation of SDHCAL 1m3 stack

CALICE Collaboration Meeting Sept DAQ2 issues XDAQ

CALICE Collaboration Meeting Sept DAQ2 Issues cont'd - DAQ2 is a non trivial system which requires sophistcated interplay of several new components Hardware provided by British groups and ready Interplay between components assured by firmware to be implemented In different components Progress since beginning of 2010 slowed down by (forced) drop out of British groups - Activities taken in charge by French groups - It looks as if the June run came a bit too early for the DAQ2 There were a number of small things which prevented the DAQ from being operational as required for a 1m3 beam test Many FW components still in (though at the end of) debugging phase - Despite of problems CALICE owes a lot to the physicists and engineers Who bring the DAQ2 into operation for the SDHCAL The success of all current technological prototypes depends on that Might have been appropriate to look closer where support might have been needed

CALICE Collaboration Meeting Sept DAQ2 and SDHCAL – Status 12/9/11 Considerable progress since June - DAQ can buffer a large number of events (before major showstopper) - 15 GRPC chambers (connected to 1 LDA) are running w/o a problem > 15 layers problems occurred due to high data volume (?) - 1 LDA can serve 30 chambers Enough for PS running - Running at SPS with up to 48 layers Need to incorporate 2 nd LDA into setup - DAQ2 got and will progressively ready for successful running at PS and SPS

CALICE Collaboration Meeting Sept Towards s/w for Technological Prototypes ● Readout reassembly simulation – Uses SystemC + low-level routine s 1 ROC “f” frames O D R pkt s R O C ch ain s. Ev ent s R O C Da ta LCI O Scheme by D.Decotigny (LLR) And Then? Interface online/offline? Data Format Proposal exist For SDHCAL Needs tight communication between DAQ team, CALICE Software Team and ILC Core software Team CALICE specific: Gerald Grenier to collaborate with s/w coordinator for SDHCAL Other detectors Usage of CALICE database?

CALICE Collaboration Meeting Sept Beam test of Micromegas - Beam test between 3/8/11 and 22/8/11 at H4 beam line at CERN 3/8/11 – 9/8/11 as user CALICE 9/8/11 – 22/8/11 as part of RD51 collaboration CALICE period most useful since full control over the beam RD51 less useful due to high rates required for other RD51 projects - 1m² chamber equipped with 144 MICROROC circuits Main purpose was characterisation of MICROROC under beam conditions Efficient startup - First beam signal on 4/8/ h - A number of systematic studies Drift and mesh voltage scans for different MICROROC shaping times Position scans DAC scans - Chamber and MICROROC chips worked perfectly Remember MICROROC was urgent development to cope with Small Micromega signals - Next step: Few chambers in SDHCAL stack at SPS Naturally both systems will use DAQ2

CALICE Collaboration Meeting Sept CERN beam time – Autumn 2011 SPS beam time for CALICE: 27/9/11 – 12/10/11 14 beam days + 1 machine day (28/9/11) Decision on repartition: 27/9/11 (8h) – 3/10/11 (8h) Whcal running (5 days on beam) 3/10/11 (8h)– 12/10/11 (8h) SDHCAL running (9 days on beam) Brief justification of decision: - Risk minimisation w.r.t. exploitation of assigned beam time Takes into account priority to be given to SDHCAL program, but yet enables completion of started measurement program (WHCal), e.g. Kaons - Risk minimisation w.r.t. transports - Availability of hardware/systems, both old and new PS beam time for CALICE: 12/9/11 – 26/9/11 - Commissioning run of SDHCAL - Compensates for problematic June run at SPS

CALICE Collaboration Meeting Sept AHCAL - Technological prototype - Mechanics well advanced – See also earlier meetings Development of AHCAL ASUs Ensemble of tiles, Hcal Base Units (HBUs) and SPIROC2b circuits Tile delivery expected from ITEP Expected to have 600 tiles by end of September Enough to equip 4 Hcal Base Units (HBUs) Current focus: TDC of SPIROC chip DESY test beam as soon as one HBU is functional Based on DAQ2 (USB based DAQ possible but maybe less desirable)

CALICE Collaboration Meeting Sept Scintillator Ecal – Technological prototype - R&D work by Japanese (and Korean groups) Scintillator strips MPPC and connection to tiles Proof of principle given - Realisation of Ecal Base Units (EBU) requires engineering support (within CALICE) Main open issue: Fixation of tiles within EBU Timeline: 2011 Design phase 2011 – 2012 production phase Beginning 2012: Test in Japan 2012 Installation in 'EUDET Module' Structure (SiW Ecal) 2012 Beam test in multi layer Structure with SiW Modules Expect considerable benefit from recently approved funding for ILC detcor R&D

CALICE Collaboration Meeting Sept Collaboration SiW-Scint Ecal 545 mm 186 mm Composite Part with metallic inserts (15 mm thick) Composite Part (2 mm thick)‏ 182× 7,3 mm 182× 9,4 mm Thickness : 1 mm ECAL W/Scin PCB: max µm (with FE embedded) W struct W sla b Heat shield: µm (copper) MPPC « X » strip 2000 µm « Y » strip 2000 µm Heat shield: µm (copper)‏ PCB: 1200 µm glue: 100 µm wafer: 325 µm Kapton ® film: 100 µm PCB: 1200 µm glue: 100 µm wafer: 325 µm - Alveolar structure applicable for both Ecal proposals - Details on integration are currently worked out. Communication SiW Ecal-ScintEcal-DESY - Schedule to be precised in coming months

CALICE Collaboration Meeting Sept EUDET “legacy” Front end electronics 256 P-I-N diodes 0.25 cm2 each 18 x 18 cm2 total area Silicon sensors Alveolar strucuture to house layers (self supporting) 18cm 9cm

Detector InterFace Adapter Board (dev) FEV7_CIP Bringing the Ecal into operation … Some delay since Ecal adopted DAQ2 from the very beginning !!!! First variant of ASU uses SPIROC chip Packaged chip (conservative start) Significant progress during Summer 2011 → Ecal session Further work include - Cooling system (ready) - Interconnection of many ASUs - Mechanical assembly Next steps: - Reliable operation of Current Ecal ASUs - Orientation towards SKIROC and FEV8 First ASU expected not earlier than summer 2012 First beam tests with small untis during autumn/winter 2011/12 More tests during 2012 when more ASUs will become available (including tests in magnetic fields)

CALICE Collaboration Meeting Sept Towards DBD... - CALICE TB has started a discussion on criteria for technological Readiness → Discussion not intensified due to priority of current test beam issues - Strategy is to define readiness criteria ourselves and present them to concepts (and RD) Criteria have been defined by TB and approved by CALICE SB - Will ask for endorsement by DESY PRC (or succeeding body)

CALICE Collaboration Meeting Sept Summary and outlook - Passing through very busy times E.g. June saw a time with three (!) 1m³ beam test Successful beam tests of DHCAL and Whcal Stress test for SDHCAL DAQ2 was an issue → Stabilisation phase → Ready for autumn - Priority for autumn should be to get a valuable data sample with the SDHCAL - … and to conclude the running with the Hcal scintillator physics prototype Hardware (DAQ and Detector) is starting to age severely Time to put the the prototypes of first hour to rest - Slow but steady progress with 2 generation prototypes Ecal, AHCAL towards small scale beam tests Will benefit from stabilisation of DAQ2 - Software is an issue - DBD preparation should move into focus of activities - Planning of 2012/13 beam test campaigns

CALICE Collaboration Meeting Sept Backup

CALICE Collaboration Meeting Sept T3B – Timing structure of hadronic shower

CALICE Collaboration Meeting Sept Impressions from SDHCAL construction Delivery to CERN of mechanical structure at the 1 st of June 2011

CALICE Collaboration Meeting Sept Software for recent test beams Software coordination: Angela Timoce Lucaci → Shaojun Lu

CALICE Collaboration Meeting Sept CALICE Software - Software coordinator Shaojun Lu - Contacts for subdetectors: SiW Ecal: ???, R.Poeschl ScintEcal: Cotera AHCAL: Angela, Shaojun (S)DHCALS: Gerald Grenier TCMT: K. Francis? Tracking: P. Dauncey, D. Jeans Simulation/Mokka: G. Musat - All physics prototypes are implemented in Mokka SDHCAL GRPC as well - Data processing: Support by M.S. Amjad, D.Jeans, A. Kaplan, K. Krastev, N.Feege, L. Weuste and S. Lu Data processing on request - CALICE s/w needs to be put on broader basis Efficient s/w group is essential for publishing physics results