Dana Point Lantern District Del Prado Construction October 23, 2014.

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
6 th Street Water Main And Street Reconstruction 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Project Update Colorado Esplanade Project.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
How would a truck get through? Any suggestions?. No parking allows access.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
Department of Public Works Proposed Underground Utility District 10-1 Mountain Street Lake Avenue to Hill Avenue.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Closure of S. Lazona Dr. at Main St.
SAN DIEGO ‘N’ LINE DANCERS
Halloween Party Wear your best (or worst) costume on October 31!
I-280 Corridor Study and I-280/Winchester Blvd Project
Center City Connector 101.
Florida Gas Transmission Mainline Hydrostatic Test
DICKINSON AVENUE RECONSTRUCTION
Aloha! Come to Our Hawaiian Social! SAN DIEGO ‘N’ LINE DANCERS
Tuesday, August 22, AM, Auditorium
Florida Gas Transmission Mainline Hydrostatic Test
Stark St Beaver Creek Culvert Project Updates
IA 122 RECONSTRUCTION PRE-BID MEETING
Cost of Service Analysis & Rate Design
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Florida Transportation Commission FY 2009
Wild Safari Social SAN DIEGO ‘N’ LINE DANCERS Guest DJ – Jody Kravitz
Silk and Satin Trot out your brightest, slinkiest outfit!
Wild Safari Social SAN DIEGO ‘N’ LINE DANCERS Guest DJ – Jody Kravitz
Wild Safari Social SAN DIEGO ‘N’ LINE DANCERS Guest DJ – Jody Kravitz
SAN DIEGO ‘N LINE DANCERS
Woodinville-Duvall Road Widening Project Update
Red Hot Social SAN DIEGO ‘N’ LINE DANCERS
Florida Gas Transmission Mainline Hydrostatic Test
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
Colchester Interceptor System Improvements Project
Florida Gas Transmission Mainline Hydrostatic Test
PROJ. 566(17) LOR PID MAJOR WIDENING
Coffee & Construction Developer Meeting
Shimmering Shindig SAN DIEGO ‘N’ LINE DANCERS
“Day at the Races” Social
SAN DIEGO ‘N’ LINE DANCERS
Contract 60X10 Informational Meeting Weber I-55
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
Meadow Lake Boulevard Street Extension Project
Holiday Party SAN DIEGO ‘N’ LINE DANCERS
Harbour Island Force Main Replacement
SAN DIEGO ‘N’ LINE DANCERS
SAN DIEGO ‘N’ LINE DANCERS San Diego ‘N’ Line Dancers Board Meetings
Utility Relocation: 11th/Mill
Nine Mile Ride – Project Timeline
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Out with the Old, In with the New!
January 2020 Proposed Service Changes Public Comment Meetings
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Dana Point Lantern District Del Prado Construction October 23, 2014

Dana Point Lantern District Phase 2 & 3 Improvements 6,100 LF of Water Mains 2,354 LF of Gravity Sewer 600 LF of Recycled Water Mains DEL PRADO SANTA CLARA AVE. PACIFIC COAST HIGHWAY LA PLAZA SAN MARINO PL. BLUE LANTERN SEVILLE PL. RUBY LANTERN GRANADA DR. LA SERENA DR. AMBER LANTERN EL ENCANTO ST. LANTERN SAN JUAN AVE. WATER SEWER RECYCLED INSTALLED ALL DATES ARE TENTATIVE GOLDEN LANTERN 11/11–11/21 10/23–10/29 VIOLET 11/24 – 12/12 Complete 10/24 10/25 10/28 – 11/10 10/30–11/10 11/11 – 11/20 11/22 – 12/12 11/1

Outreach Information Construction Schedule Contract: August 5, 2014 – February 10, 2014 Trenching began September 15, 2014 Saturday work to begin October 25, 2014 Blackout dates (11/11, 11/26-11/28, 12/24-12/25, 12/31-1/1) Goal to complete water & sewer work on Del Prado by 12/24 What to Expect Sewer service connections will not affect service Water service tie-ins will be arranged to limit downtime (9:00 am – 4:00 pm) 48 hours notice Temporary water service as needed Increased Coordination with Local Business Message boards will be updated with detours and directions Coupons and advertisements included in e- mail blasts Maintaining access to parking More frequent blasts & coordination with impacted businesses

Violet Lantern Traffic Control Shift (1 OF 2) Two right hand travel lanes will be closed through Violet Lantern intersection until 10/24 DEL PRADO  VIOLET LANTERN INSTALLED BY 10/24 EXISTING TRAFFIC CONTROL *PROPOSED WATER LINE NOT SHOWN

Violet Lantern Traffic Control Shift (2 OF 2) Left hand travel lane to be closed through Violet Lantern intersection starting 10/27 DEL PRADO  VIOLET LANTERN INSTALLED BY 10/24 PLANNED TRAFFIC CONTROL STARTING 10/27 *PROPOSED WATER LINE NOT SHOWN

Current: “Businesses Open” signage “Parking in Rear” signage Doheny / Ocean Institute / Harbor signs PCH-1 / PCH Alternate sign Del Prado Detour signs Del Prado archway priority construction Del Prado digital Mama Says/Business Names Newspaper advertisement program Support our local businesses verbiage in e-blasts Del Prado Business Support Efforts During Construction

Proposed: Holiday lights at Lantern District entryways Posters of Del Prado Streetscape “Coming Soon” Entry banners/balloons Business spotlight articles Dana Point Lantern District Website Passport Stamp Raffle Further relaxed temporary sign ordinance Del Prado Business Support Efforts During Construction

Questions???