Update on Magnet Circuits Configuration F. Rodriguez Mateos TCC July 7 2016.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advertisements

Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Mandate of Parameter and Lay out Committee (PLC) of the HL-LHC project L. Rossi HL-LHC PC.
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Role of Management and Technical Coordination
HL-LHC: UPDATE ON MAGNETS
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
HL-LHC Organization: Now and post HiLumi
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
D1/D2 Circuit Baseline Update Rationales for Baseline Discussion B. Auchmann, F. Rodriguez Mateos, A. Verweij, D. Wollmann CERN, TE-MPE.
High Voltage Withstand Levels
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Warm cabling, cooling and ventilation L. Tavian, ATS-DO On behalf and under the controls of SWP17.2 and SWP17.3 Conceptual Design Review of the Magnet.
O. Brüning, CERN USLARP Meeting, SLAC, 18 th – 20 th May, 2016 HL-LHC: New Collaboration Board 1.
Electrical Quality Assurance and Voltage Withstand Levels F. Rodriguez-Mateos on behalf of the High Voltage Withstand Levels Working Group.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
09/05/ Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 2 nd Workshop of the Spanish Traineeship.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Agenda Reorganisation MARS Offices Staff, fellows and students
CERN, 11th November 2011 Hi-lumi meeting
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
TC activities.
Review of baseline following the cost-reduction process of June 2016
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
State of discussions in preparation for the HL-LHC Circuits Review
Circuits description and requirements
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Document Plan & Milestones WP7
e-lens Readiness Review Introduction
MPE main activities planned for LS2
Felix Rodriguez Mateos for the MCF
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Upgrade Strategy for the Experimental Vacuum Systems
Circuits description and requirements - Closed Session-
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Detailed global view on protection and detection of the circuits
Paolo Ferracin, Giorgio Ambrosio
Marine Strategy Framework Directive (MSFD)
WP3 Meeting – December the 10th 2015 H. Prin
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Item 11 – Conclusions – ETS 2018 WG meeting
A Global Consensus Process
ECR on pole order of the HL-LHC IT circuit and resulting implications
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

Update on Magnet Circuits Configuration F. Rodriguez Mateos TCC July

Outline  The main recommendations from the Magnet Circuits Review in March 2016  The main aspects of the re-baselining in June 2016  The follow-up given to the main recommendations  The Magnet Circuits Forum Felix Rodriguez Mateos2

 The main recommendations from the Magnet Circuits Review in March 2016  The main aspects of the re-baselining in June 2016  The follow-up given to the main recommendations  The Magnet Circuits Forum Felix Rodriguez Mateos3

4

Recommendations per circuit type (1/2) 11 T Felix Rodriguez Mateos5 Inner Triplet

Recommendations per circuit type (2/2) D2 Felix Rodriguez Mateos6 IT correctors All circuits

Recommendations for specific elements/activities ElQA Felix Rodriguez Mateos7 HDS

Recommendations on general aspects Felix Rodriguez Mateos8 STRING Plan, Schedule and Documentation

ECR after review Felix Rodriguez Mateos9

 The main recommendations from the Magnet Circuits Review in March 2016  The main aspects of the re-baselining in June 2016  The follow-up given to the main recommendations  The Magnet Circuits Forum Felix Rodriguez Mateos10

Outcome of June 2016 «crises exercise» from Lucio’s talk at TCC on June  Staging installation of new MQYY as new Q4 (90 mm aperture) to after HL-LHC end (i.e in LS4), if needed, mantaining present 70 mm MQY, i.e. Q4 modified for 1.9 K operation.  QPS for the MQXF maintaining all systems (QH out, Qh inn, (Qh intr ), and CLIQ) however with a minimal configuration with redundancy.  Integration of CLIQ in LHC UL  Powering the IPQs (Q6-Q5-Q4) from the RR, via existing EPCs, DFBLs (and links?)… Felix Rodriguez Mateos11

Felix Rodriguez Mateos12 Infos from L Tavian, H Prin and P Fessia Q6 remains as is in LHC now Q5 will be the present Q4 Q4 will be an 1.9 K + 4 correctors/beam DFBL: 11 CL 6 kA 12 CL 120 A DSL is constituted of: 12 cables of 6 kA 12 cables of 600 A Today there are 8 DCF leads to power locally correctors

Felix Rodriguez Mateos13 Circuits Table after Review with re-Baseline D. Wollmann

 The main recommendations from the Magnet Circuits Review in March 2016  The main aspects of the re-baselining in June 2016  The follow-up given to the main recommendations  The Magnet Circuits Forum Felix Rodriguez Mateos14

Follow up given to the Review’s recommendations  Further analysis of normal and failure scenarios on QXF circuit, confirmation of the baseline scheme  Analysis of CLIQ leads sections  Analysis of CLIQ currents  Interaction with link as well as implications to bus bars and current leads remain to be discussed (in the agenda for the second meeting of the MCForum)  Reconsideration of the strategies for high voltage withstand levels  Agreement reached with LARP for QXF  Opening a development line for bipolar energy extraction systems in the 2kA range  Heaters vs energy extraction in correctors programmed for first meeting of MCForum  Development of quench detectors is advancing well  A detailed model for CLIQ failure analysis has been developed and is giving first results  Trying to gain as much experience with CLIQ as possible (recent commissioning of two units at FNAL)  Organization of a Forum to deal with all aspects of circuits related to powering and protection  And much more … Felix Rodriguez Mateos15

Recent work  Two complete and recent presentations :  CLIQ : space requirements and circuit protection  Re-baselining Meeting, June 17, 2016  HL-LHC WP7: Machine Protection and Availability  TE-TM, June 28, 2016  HVWL WG efforts gave first agreement for QXF magnets: Felix Rodriguez Mateos16 Agreed upon

 The main recommendations from the Magnet Circuits Review in March 2016  The main aspects of the re-baselining in June 2016  The follow-up given to the main recommendations  The Magnet Circuits Forum Felix Rodriguez Mateos17

One of the recommendations of the recent review on HL-LHC Magnet Circuits was: “… to realize close and regular interaction (communication) between the involved experts and work-packages. This could be possibly done by setting-up of a dedicated working group or by using existing structures to discuss circuit integration and protection on a regular basis and to identify the optimum scheme for each magnet circuit system.” Felix Rodriguez Mateos18

(Draft) Mandate – to be approved by HL-LHC Project Leader  Within the framework of the HL-LHC Circuits Coordinator (Mr Circuit), the mandate for the new Magnet Circuits Forum (MCF) is as follows:  The Forum is the meeting where all aspects related to powering and protection are discussed, in particular the ones pertaining to the optimization of circuit layouts and definition of protection means  Subjects in the agenda are defined in close collaboration with the relevant WPs  Interface aspects between systems are clarified through meetings at the Forum. To this end, a documentation plan has to be developed and completed. The aim is to prepare a set of functional interface specifications that can be used as input for the design (technical specifications) of the different systems  Assessment on realistic failure scenarios and required mitigation strategies on a global basis is part of the activities of the Forum  The Forum is the meeting where aspects related to high voltage withstand levels are discussed and harmonized  The Forum reports regularly to TCC and takes up any relevant discussion within the domain of cold/warm powering and protection of the HL-LHC circuits in collaboration with the relevant WPs Felix Rodriguez Mateos19

 Two participants have been nominated by the Work Package Leaders.  WP Leaders and Deputies as well as Group Leaders receive invitations ex-officio and are invited to attend at their own discretion depending on the agenda.  Leaders of involved Groups have endorsed the membership and in some cases proposed additional names.  First meeting has been organized for July 12 th, the second for July 26 th.  Meetings will be organized on a 2-week basis. Felix Rodriguez Mateos20

Membership Felix Rodriguez Mateos21 Work PackagesWP Leader Deputy WP Leader HL-MC Forum Member 1 HL-MC Forum Member 2 WP2Gianluigi Arduini Rogelio Tomas Garcia Massimo Giovannozzi Riccardo De Maria WP3Ezio TodescoPaolo FerracinJuan Carlos Perez Susana Izquierdo Bermudez WP6aAmalia BallarinoVittorio ParmaPatrick Retz Amalia Ballarino Vittorio Parma WP6bJean-Paul BurnetMichele Martino Hugues Thiesen WP7Daniel WollmannReiner DenzArjan VerweijJens Steckert WP9Serge Claudet Rob Van Weelderen Juan Casas- Cubillos WP11Frederic SavaryHerve PrinArnaud Foussat Ludovic Grand- Clement WP15Paolo Fessia - WP16 Marta Bajko Mirko Pojer - - WP17Laurent Tavian Beniamino Di Girolamo - - Chair and Scientific Secretaries: Felix Rodriguez Mateos Hugo Bajas Samer Yammine Representation from MP3: Arjan Verweij Daniel Wollmann Representation from ELQA: Mateusz Bednarek Giorgio D’angelo For info list: Lucio Rossi Oliver Bruning Andrzej Siemko Luca Bottura Dimitri Delikaris Mike Lamont Rudiger Schmidt Markus Zerlauth Jean-Philippe Tock