The SALTRO16 system. From ALTRO to SALTRO16 A decrease in size by a factor 40 190 mm 32.5 mm FEC MCM 8.9 mm 25 mm 170 mm Pad Module 19 cm 17 cm 32.5 mm.

Slides:



Advertisements
Similar presentations
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Advertisements

TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Motor & Encoder Mounting Guide. Bill of Materials 1. 10:1 Micro Metal Gearmotor HP item # 999 X 2 2. Pololu Micro Metal Gearmotor Bracket Extended Pair.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Optoelectronic Multi-Chip Module Demonstrator System Jason D. Bakos Donald M. Chiarulli, Steven P. Levitan University of Pittsburgh, USA.
Printed Circuit Board Design
SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Giga-snaP Socket & Adaptor High Performance IC Sockets And Adaptors.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Test setup 07/08/ Components Labview control application I2C communication FPGA firmware IC board 2.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
ASU boards for RPC detectors Production status. Presentation outline Active Sensor Unit electronic board for GRPC detectors – quick reminder – board functional.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
AIDA 3rd Annual Meeting1 First test of MCM prototype board 1 G. De Lentdecker 2 L. Jönsson 2 U. Mjornmark 1 Y. Yang 3 F. Zhang 1 Université Libre de Bruxelles.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Development of the readout electronics a status report Leif Jönsson Collaboration meeting Santander
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Development of the readout electronics in Lund for the ILD TPC Vincent Hedberg, Leif Jönsson, Anders Oskarsson, Björn Lundberg, Ulf Mjörnmark, Lennart.
Profiler Mechanics Update
Test beam straw prototype production status
Status of the TPC readout electronics
Novosibirsk, September, 2017
Status of NA62 straw readout
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
The future readout system based on SALTRO16
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Design of a Multi Chip Module
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
WARNINGS Side Description COMPONENTS SIDE (TOP) EXPRESSIONS BOARD 1/2
TPC electronics for ILD
Status Brussels GANTRY
Department of Physics, University of Michigan
Mechanical Discussion
Mechanical Discussion
EUDET Extended SC meeting 31 August 2009
Status of the EUDET Prototype
UCSB Dicing, Wire-Bonding and Board Assembly
First thoughts on DIF functionality
SALTRO16 activities in Lund
Perugia SuperB Workshop June 16-19, 2009
A Beam telescope for the EMC testbeam
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

The SALTRO16 system

From ALTRO to SALTRO16 A decrease in size by a factor mm 32.5 mm FEC MCM 8.9 mm 25 mm 170 mm Pad Module 19 cm 17 cm 32.5 mm 25 mm 8.9 mm 12 mm Side views of an MCM FEC with 8 ALTRO MCM with 8 SALTRO Carrier Board With mounted chip CPLD

The Carrier Board Carrier Board with SALTRO chip mounted Bottom side of the Carrier Board with tin balls Bonding machine Test Socket

The MCM-development board (stand alone board) The MCM-development board has been sent to Brussels together with an SALTRO-chip in CQFP208 packaging. An SRU has also been sent to Brussels. Purpose: Develop firmware for communication between the CPLD (Yifan Yang) on the MCM-board and the SRU (Fan Zang). Fan Zang has arrived in Brussels on the 6.1 and will stay until the 25.1 Work program: 1)Program the CPLD 2)Communicate with the SRU 3)Mount the SALTRO-chip 4)Communicate with the SALTRO 20.6 cm 14.5 cm CPLD Place for SALTRO

Connectors The problem with the male connectors on the upper side of the MCM-board is that the female partner can not be mounted on a vertical LV-board. This has forced us to introduce an adaptor board and a pair of additional connectors, which are suited for such mounting. The MCM-board plus the adaptor board can be regarded as a unit, which will not be separated.

Item Status Plans/purpose Carrier Board (CB) 1 st SALTRO-chip succesfullyBonding ongoingmounted Test Socket(TS)Delivered Setup of test system Test Socket Board (TSB)Design ready; mounting of components, PCB order week 3tests of 1st CBs MCM development board Ready, has been sent toFunctionality tests; (dMCM)BrusselsDevelpment of firmware forcommunication CPLD- SRU SRUSent to Brussels MCM Final Board(fMCM)Design essentially readyFinalize after tests with pMCM and delivery of connectors LV Prototype Board (pLV)ReadyFunctionality tests; LV to TSB test I2C communication LV Final Board (fLV)Design essentially readyFinalize after tests with pLV Detector Control System Master BoardReadytests ongoing 5to1 BoardReadytests ongoing Present status and future plans