2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.

Slides:



Advertisements
Similar presentations
Mark 5C VLBI Data System Alan Whitney MIT Haystack Observatory 16 June 2008 e-VLBI workshop Shanghai, China.
Advertisements

Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
2000/9/ jdr1 VLBA Upgrade: Scientific, Observational, and Technical Requirements Jonathan D. Romney NRAO, Socorro NRAO Long-Range Planning Retreat.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array New VLBA capabilities.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
High Sensitivity VLBI Sheperd Doeleman MIT Haystack Observatory.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
Review of developments in Australasia and mainland Asia Steven Tingay Swinburne University of Technology Next Generation correlator meeting, JIVE 27 -
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
2005/7/131 Plans and Options for e-VLBI on the VLBA Jon Romney NRAO, Socorro 4 th e-VLBI Workshop 2005 July 13.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Development of DiFX Adam Deller NRAO 3rd DiFX workshop, Curtin University, Perth.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
May 15, 2007U.S. VLBI Technical Coordination Meeting, Socorro NM 1 NRAO – Westford e-VLBI Trial Chester Ruszczyk / Walter Brisken MIT Haystack / NRAO.
Future LBO Developments
Opening Session.
Software Overview Sonja Vrcic
Mark 5 / VLBA Correlator Topics
Concepts for a Next-Generation VLBA
EVLA Availability - or - When Can I Use It?
EVLA Project Peter Napier
Haystack Geodesy Program and Technical Development
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Thank you for joining. This presentation will begin shortly.
J D Romney, W F Brisken, S J Durand
VCI Overview Sonja Vrcic
Budget, Schedule, Contingency
Overview of working draft v. 29 January 2018
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
EVLA Advisory Committee Meeting System Status
Gustaaf van Moorsel September 9, 2003
VLBA Correlator Interfaces for VSOP-2
Shared Risk Science with the EVLA
Wide-field, high sensitivity VLBI
Mark McKinnon EVLA Project Manager
Observatory Science Operations
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
SADC WRC-15 Preparatory Meeting
Observatory Science Operations
Arecibo Observatory VLBI Program and Plans
Correlator Growth Path
EVLA Construction Status
WG Title Goes Here Name (s), Organization, CEOS Affiliation
DBBC Stutus Report November 2007
New Biogeographic process
Presentation transcript:

2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 2 VLBA Sensitivity Upgrade Overall Theme Restore VLBA competitiveness through enhanced sensitivity. … as well as expanded flexibility and compatibility in observing modes. Two Basic Sub-Projects Upgrade selected receiver systems. … through replacement of LNAs. Results with first three upgrades at 1.3 cm suggest doubling of VLBA sensitivity at this band will be possible. Upgrade entire data path downstream from IFs. Sampler-Filter / Recording System / Correlator. Each is directly relevant to main discussion areas at this meeting.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 3 VLBA 4-Gbps Data Path Upgrade Replace All Equipment Downstream from IFs MHz 2 bits / Nyquist sample → 4 Gbps. Target completion: Wideband Sampler/Filter module. Wideband Recording system. Wideband Correlator.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 4 Wideband Sampler/Filter Module Replaces BBCs / Samplers / Formatter Initial NRAO Concept Exploit expertise in FPGA design developed in EVLA project. Transfer functionality implemented there to a VLBA application. Outlook for rapid completion matched personnel availability. Target: end of FY First US VLBI Meeting (Haystack, 06/10/25-26) Recognized potential synergy with Haystack DBE-2 plans. Initiated joint collaborative development.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 5 Wideband Sampler/Filter Module [2] NRAO/ Haystack Development Scope expanded to accommodate VLBI-2010 requirements. Increased bandwidth; doubled sampler clock. Added fast memories for corner-turning. Two-board concept to support both VLBA and VLBI-2010 usage economically. iBob-2 Learned about UCB/CASPER plans for iBob-2 at end of March. Inadequate capacity as specified, but possibly could be expanded. Possibly attractive option, but also possible delay. Timescale for design completion not clear. Scope and organization of international collaboration not clear.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 6 Wideband Sampler/Filter Module [3] Current NRAO Status Internal mandate to complete prototype by end of FY Will probably adopt two-track approach (pending outcome of this meeting). Rapid Completion of 4-Gbps “VDBE” Prototype Matched to basic VLBA requirements, plus whatever else can fit and be included without significant delay. In-depth review by Mike Revnell this afternoon. Parallel, Longer-Term Collaboration on iBob-2 … with UCB/CASPER, Haystack, South Africa, et al. Matched to VLBI-2010 requirements. Re-evaluate if design ready when 4-Gbps prototype complete.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 7 Wideband Recording System Major Gap in NRAO Development Efforts Urgently need a way to transmit 4-Gbps data from new wideband sampler/filter to wideband correlator. First US VLBI Meeting (Haystack, 06/10/25-26) Decided to approach Conduant Corp. about potential “Mark 5C” system, capable of continuous recording at ≥ 4 Gbps. Haystack/NRAO Visit to Conduant (07/2/12) Agenda included 4-Gbps recording. … in addition to many other, more immediate concerns. Encouraging indications that could be achieved. … using Conduant’s new “Amazon” board, and well before 2011.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 8 Wideband Recording System [2] NRAO Status Internal funding requested to support Conduant Mark 5C development. Seek to be involved in ongoing design. Hope to learn much from presentations later this morning.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 9 Wideband Correlator Replaces Original VLBA Correlator Sufficient capacity to keep up with current and future mix of VLBA observations. Significantly enhanced bandwidths, spectral resolution, integration times, special processing modes, and flexibility. Continuity of results across transition. Two Different Options Under Consideration …

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 10 Wideband Correlator [2] Software Correlation on Cluster System ‘DiFX’ software written by Adam Deller at Swinburne University. Variety of peripheral software required to interface to VLBA, most already complete. Software free; cluster hardware cost TBD. Everyone’s favorite option – if we can afford 4-Gbps system. Mini-cluster under construction for test purposes; internal funding requested for intermediate-scale system. In-depth review by Walter Brisken Tuesday morning.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 11 Wideband Correlator [3] Hardware Correlation on EVLA WIDAR … designed by Brent Carlson at DRAO. Use excess capacity in 32-station system. Hardware free; software may be expensive and/or late. Additional complications in control & resource allocation. Availability may be fairly late for 2011 target date. Dedicated Mini-WIDAR for VLBA … using additional boards of same design. Hardware might be contributed by Canada; software might be less expensive. In-depth reviews by Craig Walker Tuesday morning.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 12 e-VLBI NOT Part of VLBA Sensitivity Upgrade Project NRAO has had a negligible involvement in operational e-VLBI. Recent VLA-Westford test series providing some welcome encouragement. … from preparations at least, even if no solid results yet. US e-VLBI Roadmap document should be finalized, with inclusion of Arecibo input. In-depth review by Steve Durand Tuesday afternoon.

2007 / 5 / 14 – jdrSecond US VLBI Technical Coordination Meeting 13 Thank you