Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
The Preparatory Phase Proposal a first draft to be discussed.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
SPSC114 summary for EATM Lau Gatignon / EN EATM, 15 July 2014 Open Session:OPERA, ICARUS, NA63, COMPASS, CLOUD, P349 (pbar polarization) Closed Session:Neutrinos.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Vacuum System P. Chiggiato TE-VSC
WP13: Access to Plasma Beam testing facilities
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Oct 22 Group Leaders Planning meeting
ELENA installation and commissioning status
East Hall under construction
Installations up to Start of Commissioning
ELENA Beam Transfer Workpackage
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
The ELENA Safety Documentation «time to prepare the safety clearance»
M.Jonker CTC MPO-WG status
C.Carli Budget and Planning ELENA Project Review, 15th October 2013
ELENA Technical Coordination
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Experience with an IT Asset Management System
Potential Milestones A timeline to finish in one year
ELENA Extra Low ENergy Antiproton Ring
Present and Future test facilities for High-intensity Targetry CERN
Bunker Internal Review Welcome & Charge
Test Beamline System Requirements and Charge to PDR Committee
X-Ray Endstation Design & Management/Commissioning
ThomX – Commissioning Meeting – 25/01/2018
X-Ray Endstation Systems (XES) 2006 Schedule
Laser Und XFEL.EU Experiment
Detector Proto-Technical board Sep 30, 2010
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille, P. Belochitskii) P. Belochitskii (Machine Physics& Parameters) T. Eriksson (Integration, Commissioning & Operation) G. Tranquille (E-cooler & Diagnostics) H. Breuker (User interface & Safety) Integration and Installation Committee (C. Carli, T. Eriksson) Work Packages ELENA Project Structure Installation and planning: N. Gilbert Integration, production, Validation: F. Butin S. Pasinelli (Software definition& Integration) AD Consolidation T. Eriksson W. Oelert (External institutions Contact) F. Butin (Integration, production, Validation) W. Bartmann (Beam Transfer)

ELENA Committees and Meetings Beam Physics and Performance Committee (BPPC)  Define the parameters of the ELENA ring and the transfer lines to ensure that they fit the physics requirements (Ring optics, electron cooling, instrumentation, injection & ejection, ion source ….).  Chaired by Gerard Tranquille and Pavel Belochitskii with Olav Berrig scientific secretary ELENA Installation and Integration Committee (IIC)  Practical Implementation of the machine and lines discussed in the BPPC (space available/required for equipment, general infrastructure, civil engineering ….)  Chaired by Christian Carli and Tommy Eriksson with Bertrand Lefort scientific secretary Meetings of both committees on Thursdays  Frequency of Installation and Integration Committee: maximum every second week alternating with BPPC … depending on needs (open issues) Transfer lines WS/ S. Maury 25th of January 2012

ELENA Committees and Meetings Communication between committees: issues identified in Installation and Integration Committee may be trigger re-discussion in BPPC Invitations to both committees and project meetings to one and the same mailing list  Keep everybody possibly interested informed,  People should not feel obliged to attend meetings in case they are convinced that they are not needed  If some people concerned are not invited, please inform us (and feel free to forward invitations) Transfer lines WS/ S. Maury 25th of January 2012

ELENA – Present Layout in AD/ELENA Hall Transfer lines WS/ S. Maury 25th of January 2012

PROPOSAL TO MEASURE THE GRAVITATIONAL BEHAVIOUR OF ANTIHYDROGEN AT REST (SPSC-P-342) From the SPSC meeting (17 th and 18 th of January 2012) The SPSC further reviewed the proposal to measure the gravitational behaviour of antihydrogen at rest, SPSC-P-342. The Committee appreciates the carefully worked out proposal and acknowledges the elegance of the proposed methods as well as the interest of the physics addressed. The Committee received additional information satisfactorily answering the points raised in the review process. In the light of this the Committee recommends approval of the experiment. The committee advises the collaboration to proceed towards an MOU with a detailed schedule and defined commitments of the partners. Transfer lines WS/ S. Maury 25th of January 2012

ELENA Workpackages Transfer lines WS/ S. Maury 25th of January 2012 Just an example: all names and numbers are pure fictive !

Contributions from outside Institutes

Some preliminary milestones Ring optics and layout: Spring/2012 Transfer lines: Mai/2012 (?) TDR: October/2012 (Review of the project?) Manpower/budget profiles and schedule: March/2012 Magnets design: December/2012 (?) AD Hall preparations: 01/ /2014 ELENA Installation: 01/ /2015 ELENA commissioning: from 04/2015 p or H- or no source: 12/2011 Design of the new building: 10/ /2012 (Discussions started !) Delivery of the new building: 10/2013 Moving the kicker platform: 10/ /2014 AD Start-up: 05/2014 Transfer lines WS/ S. Maury 25th of January 2012

Transfer lines WS In the ELENA Project transfer lines are very important with a need to build electrostatic transfer lines for the experimental areas and to do so we need first to learn about that. Experts are invited (ISOLDE, COCKROFT, ASACUSA, …) Have a nice discussion, definition and convergence to our needs. Have a nice meeting ! Transfer lines WS/ S. Maury 25th of January 2012