Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 1 LCTPC Collaboration Meeting 18. May 2011 Status LP – PCMAG Modification – Testbeams.

Slides:



Advertisements
Similar presentations
P.Colas D.Attié, W.Wang, I.Giomataris CEA/Saclay, France K.Fujii T.Fusayasu, K.Kato, M. Kobayashi, T. Matsuda, O. Nitoh, A Sugiyama, T. Watanabe KEK/IPNS,
Advertisements

TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
R&D plan for ILC ( ILD) TPC in (LC TPC Collaboration) LCWA09 Tracker Session 02 October 2009 LC TPC Collaboration Takeshi MATSUDA DESY/FLC.
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
CEA-Saclay G. De Lentdecker November 30 st 2011 o G. De Lentdecker Université Libre de Bruxelles Kalman Filter in MarlinTPC.
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
Gas Tracking Summary: Gas Tracking IWLC October 2010 Geneva Takeshi MATSUDA DESY/FLC and KEK/IPNS 1.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
A TPC for the Linear Collider P. Colas, on behalf of the LCTPC collaboration Instrumentation for Colliding Beam Physics 2014 Novosibirsk, Russia.
TDC-Related Processors in MarlinTPC/branches/oschfer by Oliver Schäfer MarlinTPC EVO-Meeting, 30 th April 2009 University of Rostock DESY Hamburg EUDET.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
Research and development of Micromegas detector and related devices (Project N° ) Updated progress report and second extension request (up to March.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 The Silicon TPC System EUDET Extended SC meeting 1 September 2008 Jan Timmermans NIKHEF.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CLAS12 Forward Tracking: Status and Challenges
Large Prototype TPC using Micro-Pattern Gaseous Detectors
Technical Design for the Mu3e Detector
Readiness of the TPC P. Colas What is left before final design?
Progress with pixelised readout of gaseous detectors
IFR Status Summary W. Baldini on behalf of the IFR Group
Large Area Endplate Prototype for the LC TPC
Progress with pixelised readout of gaseous detectors
P. Colas for the LC TPC collaboration
DESY Test Beam Facilities - Status and Plan
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
A TPC for the Linear Collider
Toward the final design of a TPC for the ILD detector
Recents Analysis Results From Micromegas TPC
TPC Paul Colas Technical meeting, Lyon.
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
Tracker Software Status
Ron Settles MPI-Munich ALCPG09 Testbeam Session
L H C A T L A S International Collaboration on the LHC Project
EUDET Extended SC meeting 31 August 2009
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 1 LCTPC Collaboration Meeting 18. May 2011 Status LP – PCMAG Modification – Testbeams (on behalf of Ralf Diener) Software and Simulation Status

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 2 Large Prototype Field Cage > Based on experience with small prototypes  Made of composite materials  Ø 72cm, ↔ 61cm > Due to fabrication imperfection:  2nd field cage planned  Mandrel worked over and measured

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 3 T24/1 Test Beam Setup > Built inside EUDET > Set up in DESY II test beam, area T24/1 (e+/e- from 1 to 6 GeV/c) > Comprises:  PCMAG magnet mounted on movable lifting stage (3 axis): Control and safety system being worked on in last 2 weeks of May  HV and gas system including slow control system (constantly under extension)  Cosmic and beam trigger (just updated)  Laser calibration system > Outer silicon detector for reference - work in progress (based on ZEUS vertex parts) :  Helix driver card missing, could be rebuild (plans available) and integrated with EUDAQ, but building & programming needs manpower both people working on it dropped out)

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 4 Past Test Beams > 2008:  Nov-Dec Micromegas module w/ resistive anode (T2K electronics) > 2009:  Feb-Apr 3 Asian GEM Modules w/o Gating GEM (3,000ch ALTRO electronics)  Apr TDC electronics with an Asian GEM Module  Apr-May Maintenance of PCMAG  May-Jun Micromegas w/ two different resistive anodes (New T2K electronics) Setup and test of laser–cathode calibration  Jun GEM+Timepix (Bonn)  JunInstallation of PCMAG moving stage and SiTR support  July TDC electronics with an Asian GEM module ALTRO electronics study w/ Asian GEM  July-Aug Full installation of PCMAG moving stage  AugMicromegas w/o resistive anode with laser- cathode calibration  Sept Bonn GEM module ( A small aria GEM with ALTRO electronics)  NovMicromegas with SiTR > 2010:  MarchMicromegas using PCMAG movable table.  March and Sept 3 Asian GEM modules w/ gating GEM or a field shaper using the PCMAG movable table (7616ch ALTRO electronic)  DecOctpuce (8 Ingrids) test on LP with 1T (Saclay/Nikhef) > 2011:  AprFirst test of DESY GridGEM module (B=0T)  MayNew AFTER electronics for Micromegas Installation of new cosmic trigger logic

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 5 Test Beam Schedule – Near Future > : T24 used by other group → no beam in T24/1 > :Mounting of DESY module and measurements with cosmics (no beam available) > : Beam measurements with DESY module > : Asian module measurements > :Shutdown of test beams at DESY till mid August Warm up of PCMAG > End July: packing of PCMAG, shipping to Japan

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 6 Test Beam Schedule – Farer Future > Late 2011/early 2012:  7 Micromegas modules w. AFTER electronics (without magnetic field)  Tests with S-Altro 16 electronics > 2012:  Continuation of LP1 tests (with magnetic field)  LP2 (advanced endplate) tests at test beam > Late 2012/2013: Move to hadron test beam for some months

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 7 PCMAG > PCMAG (designed for airborne experiments)  Persistent Current, superconducting MAGnet  Thin coil and wall (0.2X 0 ), no return yoke  Liquid Helium reservoir  Moved to DESY in Dec 2006  Tested and mapped in (cooperation of DESY, KEK and CERN) Accuracy of > Dimensions and data:  Coil: Ø 1.0 m, ↔ 1.3 m, weight: 460 kg  Central magnetic field: up to 1.2T  Liquid He capacity: 240L (max. 10 days)  Operational current: 430A (1T)

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 8 cryo modules will be installed PCMAG Modification > Up to now: filling manually with liquid He  Expert work, many steps to be taken carefully → error-prone > Magnet modification inside AIDA project:  No filling, but using closed circuit with cryo modules  Safe, easy and efficient operation + Portability > Schedule:  Test beam end: 10.July 2011 → warm up of magnet  End of July: shipping to Japan  Ready in the beginning of 2012 > Status: Preparations ongoing  Details of installation being planned (cable/tube lengths, packaging, etc.)  Close contact to Japan  Open question: cooling water for the compressors reservoir will be removed 2 > Up to now: filling manually with liquid He  Expert work, many steps to be taken carefully → error-prone > Magnet modification inside AIDA project (+contrib. by KEK+DESY)  No filling, but using closed circuit with cryo modules  Safe, easy and efficient operation + Portability  No persistent current mode, PSU always connected > Schedule:  Test beam end: 10.July 2011 → warm up of magnet, End of July: shipping to Japan, Ready in the beginning of 2012 (March?)  Might be pushed a few weeks back, due to delays with Toshiba > Status: Preparations ongoing  Details of installation being planned (cable/tube lengths, packaging, etc.)  Open question: cooling water for the compressors (search for water chiller ongoing)

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 9 Example of Modified System with similar Coil 2 cryo coolers (50K, 4K) mounted on chimney Helium gas compressors for the 2 cryo coolers Water Chiller behind the two compressors Magnet chimney with the 2 coolers on the side

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 10 Software: MarlinTPC > Working reconstruction chain from raw data (LCIO input) to track finding > For pad based data:  Pulse Finding (single channel data)  Hit Building (space point reco) > Pixel data:  Cluster Finding (from TOT/time measurement)  Hit Building (space points) > Pattern recognition works, three options > Within/Uses Marlin framework:  Geometry description (GEAR)  Data format/Persistency (LCIO)  Conditions Data (LCCD) > In use (at least started) for all types of modules that were tested

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 11 Software: Current workplan and Needs > Information management improvement  Data location on grid  Converter programs for ALTRO, AFTER electronics (and pixel?)  Geometry and pad mapping info > Conditions data access and usage (almost done) > Reconstruction – Fitting:  Currently no fitter truly works in MarlinTPC  KalTest is a good option, but extra effort is needed (e.g. geometry description)  Other option is still work in progress (possibly with direct connection to alignment) > Reconstruction – Alignment and Calibration  Very important but no common tools so far  Makes little sense without a working fitter

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 12 Simulation status > Several different approaches existing in MarlinTPC  Simple Geant Hit smearing (used e.g. for ILD simulation)  Charge cloud approximation (used e.g. for the Likelihood fitter technique)  Detailled ionisation and drifting & (fixed) parametrised amplification > None that fit exactly our needs:  Possible single electron level from ionisation to readout plane  Different amplification structures  Ion backdrift studies > (Possible) Solution: Garfield++ by Rob Veenhof and Heinrich Schindler in collaboration with RD51  Some experience already there  PhD candidate + C.R. will start to work on/with it > Other parts also there  Ion Backdrift studies (Torsten Krautscheid)  Photo dots for calibration (Jason Abernathy)

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 13 Summary Slides by Ralf for easier digestion

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 14 Testbeam Setup > Field cage:  Due to fabrication imperfection: 2nd field cage planned  Status: Mandrel worked over and measured > Setup at T24/1:  PCMAG magnet mounted on movable lifting stage (3 axis): Control and saftey systems currently being completed  Cosmics trigger logic just updated  HV and gas system including slow control  Laser calibration system  Outer silicon reference detector in progress, some problems due to missing parts

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 15 cryo modules will be installed PCMAG Modification > Up to now: filling manually with liquid He  Expert work, many steps to be taken carefully → error-prone > Magnet modification inside AIDA project:  No filling, but using closed circuit with cryo modules  Safe, easy and efficient operation + Portability > Schedule:  Test beam end: 10.July 2011 → warm up of magnet  End of July: shipping to Japan  Ready in the beginning of 2012 > Status: Preparations ongoing  Details of installation being planned (cable/tube lengths, packaging, etc.)  Close contact to Japan  Open question: cooling water for the compressors reservoir will be removed 2 > Up to now: filling manually with liquid He  Expert work, many steps to be taken carefully → error-prone > Magnet modification:  Inside AIDA (+ contrib. by KEK, DESY)  No filling, but using closed Helium circuit with cryo modules  Safe, easy and efficient operation + Portability > Schedule:  Test beam end: 10.July 2011 → warm up of magnet  End of July: shipping to Japan  Ready in the beginning of 2012 > Status: Preparations ongoing  Details of installation being planned: cable/tube lengths, packaging, cooling water, etc.

Christoph Rosemann | LCTPC Collaboration Meeting | 18. May 2011 | page 16 Test Beam Planning > Near future (2011)  June: DESY GridGEM module with ALTRO electronics  June/July: Asian GEM modules with ALTRO electronics  From mid July to beginning 2012: PCMAG modification > Farer Future  Late 2011/early 2012: - 7 Micromegas modules w. AFTER electronics (without magnetic field) - Tests with S-Altro 16 electronics  2012: - Continuation of LP1 tests (with magnetic field) - LP2 (advanced endplate) tests at test beam  Late 2012/2013: Move to hadron test beam for some months