Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON,

Slides:



Advertisements
Similar presentations
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Advertisements

PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
- Purpose - Main sequences - Resources (manpower and GSE), including location -Main activities of the assembly and integration of the subsystems -Final.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
- Grounding - Harness Shielding - PDM Electrical Architecture - DP Electrical Architecture EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Pierre.
EUSO-BALLOON CDR – Agenda (I). Internal interfaces overview Batteries and Low Voltage power Supplies PDM interfaces DP interfaces HK Interfaces List of.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
- Software block schemes & diagrams - Communications protocols & data format - Conclusions EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE F. S.
- Battery Pack Technical Specifications - Battery Pack Design Descriptions - Battery Pack Connection Diagram - Battery Pack Architecture EUSO-BALLOON DESIGN.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino.
IR CAMERA EUSO BALLOON JEM-EUSO Balloon CDR, CNES, Toulouse. December 18, 2012 José Santiago Pérez Cano. Orbital Aerospace, Madrid, Spain. Héctor Prieto,
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
- Where are the entry points of the instrument - Physical External links - Overview of the External Interfaces - Status - Conclusion EUSO-BALLOON DESIGN.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Recommendation and actions EUSO EUSO-BALLOON FLIGHT REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Wrap up previous actions.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
EUSO BALLOON phase A review CNES, Mechanical design of the instrument approach for integration and tests Peter von Ballmoos, IRAP Toulouse.
SDK Phase 0 Software simulation environment on PC Assumed underway by Nintendo iReady can provide GB to RS232 adapter –allows GB to be connected to PC.
AGATA Pre-processing team report AGATA Week, July 2008.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
The whole instrument Tests performed Conclusions EUSO-BALLOON, EUSO-BALLOON flight review 04/06/2014 P. Barrillon on behalf of the many hard workers involved.
The EC-UNIT P. Barrillon on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
The PDM-block M. Casolino on behalf of JEM-EUSO collaboration EUSO-BALLOON Phase A review 2 nd February 2012, CNES, Toulouse.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
- Timeslots for the EUSO-Balloon flight - The campaign organization DESIGN FLIGHT REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris, France.
EC_ASIC drawing (1) ASIC BASIC FASIC D 68 pi ns ASIC A 68 pi ns ASIC C ASIC E 120 pins ABCDEF 68 pi ns 68 pi ns 68 pi ns 68 pi ns.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 Euso-balloon Lenses A)Design: - Alex Zuccaro (now at ESTEC) - Yoshiyuki.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
- Overview of the subsystems - The Photodetector Module and its components - The Data Processing and its components - The Power Pack - Summary of subsystems.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
EUSO BALLOON Battery Power Pack (PWP) RIKEN/UAH Héctor Prieto, Katsuhiko Tsuno, Marco Casolino 1.
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
Anomalies &/or differences with the configuration Explanations, analyzes, impacts Updates EUSO-BALLOON, Flight review 04/06/2014 Guillaume Prévôt (APC)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
CSNSM SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
EUSO-BALLOON DESIGN REVIEW ORGANIZATION Naples, November the 9th, 2012 Guillaume Prévôt 1 EUSO-BALLOON, 9th progress Meeting 2012.
Michel DUPIEUX IRAP Progress Meeting LAL 02/03/ EC interface with PDM.
Pierre PRAT Progress the Michel DUPIEUX.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
EC electronic status. Outline Reminders History EC-front unit status EC_ASIC status What next ? 2.
Jean Evrard (CNES), Gilles Roudil (IRAP), Peter von Ballmoos (IRAP) 7 september 2012, LAL current gondola design changes based on - requirement for tunable.
The EC-front development plan and planning S. Ahmad, P. Barrillon, D. Cuisy, S. Dagoret, P. Dinaucourt, R. Sliwa, JL. Socha EC design review – LAL – 1.
The Importance of Solar Car Project Management
Bill Raynor Naval Research Lab
Collect and share knowledge
Calorimeter Mu2e Development electronics Front-end Review
Double Star Progress Meeting #3 Beijing 2 July, 2002.
EM pre-integration review
Concept of ACSF TAN (Type Approval Number)
EC board for JEM-EUSO Design investigations
Peer Review Agenda (Suggested).
Student Assignment Review Advisory Committee
New Calorimeter Trigger Receiver Card (U. Wisconsin)
The Importance of Solar Car Project Management
LIU BWS Firmware status
Presentation transcript:

Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON, 9th progress Meeting 2012

first flight in spring 2014 from Timmins (48°34' N, 81°22' W) CNES campaign starts March 1st 2014 => EUSO BALLOON is to be flight-ready in Timmins by end of february flight scenarios have been elaborated by Jean Evrard for the december flight review => we can make it, but must stay on tight schedule first light / first flight

Timmins

EUSO-BALLOON, 5th progress Meeting Timmins

the lenght of the astronomical night at Timmins (48°34' N, 81°22' W)

PDM- MAPMT - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints Documents- 1 st versions for dec DR have been read by Pascale EUSO-BALLOON Dashboard meet dec DR

PDM- MAPMT : Gain measured - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC : brazing process suspected - EC Proto E waiting for Matra - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board under tests in Corea, expected at LAL mid-Nov - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W ? Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints, Documents- very little is written up for the december DR EUSO-BALLOON Dashboard meet dec DR

PDM- MAPMT - EC : Front Boards OK, EC-Units OK, Proto M OK - EC ASIC - EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board - meca : Top: manuf.. Bottom follows, modif ok except HVPS DP- CPU, CCB, and communication (CLOCK) : OK - HK, tests DP / HK - LVPS and interfaces - S/W CPU : Low level protocol and interfaces, other S/W Architecture- Electrical : "interior"/"exterior", design frozen - Mechanical, design frozen, study on struct. integrity going - Thermal, ongiong, first results Lenses- manufacturing on track AIT/AIV- planning started IRCAM- position on gondola, safety constraints Documents- 1 st versions for dec DR have been read by Pascale EUSO-BALLOON Dashboard meet dec DR

Since the last progress meeting APC Paris, October the 12th The electrical prototype has been received by LAL (before potting) EC ASIC card has been sucessfully tested (before data transmission tests) We fixed the design of PWP The delivery of 19 missing MAPMTs + UV filters on going (december 2012) Cockroft Walton and switches prototypes have been tested at APC (and a bit modified to be adapted to MAPMTs) PDM board delay : 6 PCBs produced and partially tested, delivery at LAL is scheduled for end of November, we are trying now to organize EC- ASIC/PDM Board communication tests DP tests are undergoing in Naples Thermal analysis has been done The documentation is well-advanced (architecture documents, Technical specification for CPU software, PAIE, updates of Phase A documents, ICD, etc.) 10 EUSO-BALLOON, 9th progress Meeting 2012

Since the last progress meeting (2) PWP design defined See Hector Prieto’s presentation Ec_ASICs electrical tests has been done See Pierre B.’s presentation CW and switches tests has been done See Ph Goro.’s presentation Writing of the electrical architecture Document See Michel’s presentation Writing of the mechanical architecture Document See Peter’s presentation Thermal architecture analysis (Document on going) See Gustavo’s presentation Tests of HK & LVPS communication Phase A documents actualized See Andrea‘s presentation Writing of the CPU software Document See Francesco’s presentation 11 EUSO-BALLOON, 9th progress Meeting 2012

Since the last progress meeting (3) Interfaces Control Document has been defined and commenced See Sylvie’s presentation PAIE Document (about integration) well advanced See Sylvie’s presentation Verification matrix to the technical requirements has been defined See Guillaume’s presentation List of the steering committee’s actions See Guillaume’s presentation 12 EUSO-BALLOON, 9th progress Meeting 2012

The work to be done 13 EUSO-BALLOON, 9th progress Meeting 2012 Ending the work on the interfaces and writing the related documentation (mechanics I/F, cables, pinout assignment, etc.) Ending the communication tests Performing the HK / LVPS Boards communication tests before mid-december Performing the CCB / PDM Board communication tests before mid-december Organizing and performing the EC-ASIC / PDM Board communication tests before mid-december Defining the software specifications Testing on the EC electrical prototype before end after potting Writing the last versions of the documents

Questions and Problems Expected progresses on PDM board ‘stand alone’ tests Expected progresses on PDM board / Ec-ASIC communication tests Expected progresses on PDM board / CCB communication tests 14 EUSO-BALLOON, 9th progress Meeting 2012

The Goal of this meeting Discussing the last programmatic aspects before CDR Review Discussing the expectation of the different documents written for the CDR Review Listing actions 15 EUSO-BALLOON, 9th progress Meeting 2012