Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.

Slides:



Advertisements
Similar presentations
Hellenic Ministry for the Environment, Spatial Planning and Public Works Greek Experience on the Implementation of EPER REPORTING IN GREECE Η ΕΛΛΗΝΙΚΗ.
Advertisements

School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Activation of equipment - overview Chris Theis, Helmut Vincke - DGS/RP.
Andre Henriques DGS/SEE LIU-PSB. S AFETY R EQUIREMENTS & S AFETY F ILE 14 TH F EBRUARY 2013 February 2013.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
1 1. Some recent views ( ) 2 Linac tunnel
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
Management System Part II: Inventory of Radiation Sources – Regulatory Authority Information System (RAIS)
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Radiation Protection computing tools Gérald Dumont HSE/RP.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Inquiry about Radioactive Workshops & Storage needs A status report Presented by L.Bruno Checked by P.Carvalho-Correia, M.Hatch, P.Strubin, T.Wijnands.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Sascha Schmeling & Emmanuel Tsesmelis LHC RRB Scrutiny Group Autumn Meeting August 2009.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety aspects of LIU Outline: Safety documentation management
LIU / HL-LHC Cost and Schedule Review
Safety aspects of LIU Outline: Safety documentation management
Preliminary Decommissioning Plan for the Canadian Light Source
East Area Renovation Project Team meeting # 2 – EDMS News
PRESENTATION OF MONTENEGRO
Module Planned exposure situations Public exposure (GSR Part 3)
Maintenance Scheduling
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Safety Documentation EHN1
Forecasts for waste and radioactive material storage
Injector De-cabling Project
Buffer Zones - Status Report
Research Reactor Decommissioning Demonstration Project (R2D2)
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
Radioactive Waste and Material Storage in the Frame of LS2
EP Experiments safety validation process Safety Permits
MAINTENANCE PLANNING AND SCHEDULING
13 Production and Business Operations 13-1 Types of Production
RECORDS AND INFORMATION
RCF Plenary Session 21 September 2018
Van Wert, OH Water and Wastewater Element Training
Chemical Purchasing.
Radioactive Waste and Spent Fuel Management in Hungary
The IAEA Safety Standards
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
How to explain positions, parts and assets to dummies?
Radwaste: status & way forward
Safety in the East Area Renovation Project
Presentation transcript:

Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016

Safety File contents for the waste Two aspects shall be addressed in the Safety File: The waste produced during the life-cycle (installation/upgrade, commissioning, maintenance and operation). The dismantling of the facility and disposal of the components of the machine at the end of life time. For conventional and radioactive waste.

Safety File contents: conventional waste According to the LSAs, the project shall establish the inventory of conventional waste and chemical waste (i.e. estimation of annual quantity of waste produced, per category). The estimate shall be done by category and total mass or volume, detailing to which phase of the life cycle of the project it corresponds. Category of conventional waste: Category of chemical waste: SMB-SC-LS is responsible for the collection, disposal, transport, selection and elimination of conventional waste. They ensure: Regular collection for small quantities, Collection on request (to be paid by the requestor) for large quantities or certain category of waste.

Forecasts for conventional waste for LIU-PSB, LIU-PS Are there any conventional/chemical waste for the LIU-PSB and LIU-PS ? If so, please fill in the Excel file attached to the presentation:

“Disposal of radioactive material Any radioactive equipment for which no future use is identified must be considered as a radioactive waste and must be transferred to the radioactive waste treatment centre. In order to arrange for proper storage and facilitate the elimination of the waste, the equipment responsible for the project must inform the HSE-RP group as early as possible and provide to the best of his/her knowledge information on the waste generated. The required specifications are the type of item, the quantity, the type of material (chemical composition), geometrical information (dimension, mass, volume) the radiological information (history of irradiation, cooling time when applicable, etc.).” (extract from the global LIU LSA, EDMS , 2012) Safety File contents: radioactive waste

Forecasts for radioactive waste and material storage The aim is to allow HSE-RP to assess the level of radioactivity and classify the material and waste at an early stage for proper storage/elimination. HSE-RP presented to the LS2 day in September 2015 the forecast for radioactive material and waste production during LS2. HSE-RP mentioned that regular updates are required to allow the timely provision of storage space.LS2 day The forecasts for the 1 st exercise done in 2015 were collected by the RSOs, compiled by HSE-RP for the radioactive waste and SMB-SC for the material storage. They cover all machines and activities, not only LIU. Are all LIU forecasts included? To be reminded that for radioactive waste, the following HSE-RP procedure shall be followed: « CERN’s Internal Acceptance Criteria for Radioactive Waste », EDMS EDMS

Forecasts for radioactive waste for LIU-PSB, LIU-PS Data extraction for the PSB and PS: - Are these items related to LIU-PSB, LIU-PS? - Are there missing items for LIU-PSB, LIU-PS?

Forecasts for radioactive material storage for LIU-PSB, LIU-PS Data extraction for the PSB and PS : - Are these items related to LIU-PSB, LIU-PS ? - Are there missing items for LIU-PSB, LIU-PS?

THANK YOU !