1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory 06-16-2009.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Balsa Glider Construction
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
DHCAL Construction Status Lei Xia Argonne National Laboratory ALCPG2009, Albuquerque.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Mass production and mechanical structure P. Pakhlov (ITEP)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Dry Mounting. It is as easy as + $ %  It is as easy as + $ %  Plus Trim 2 Corners Press.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
DHCAL Construction Status Lei Xia Argonne National Laboratory CALICE Meeting, September 16 – 18, 2009 Université Claude Bernard Lyon I, France.
Concept Design for LBNF Far detector (LAr single phase)
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
BM&N STS ladders assembly in VLHEP
Profiler Mechanics Update
Stator Plan & Schedule Chris Booth 2nd March 2009
GRPC development in Lyon
European DHCAL Meeting 13/06/08
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RPC built a new plastic (peek doped with CB)
Status of straw production straw module assembling
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
GRPC activity for EuDHCAL in IHEP-Protvino
Renovation of the 45-year old PS magnets
DOM integration meeting
Radiation Laboratory Meeting
Balsa Glider Construction
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
STAR TOF MRPC Mass Production & Q.C. (USTC)
Balsa Glider Construction
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Limited Streamer Tube Project Summary
Balsa Glider Construction
Presentation transcript:

1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory

2 Outline  Preparation List 1.Glass sheets 2.Edge Frames + HV Connection Holder 3.Insulating tubing and fishing line 4.Resistive Paint 5.Accessories: gas tube, HV connecters 6.Tools: epoxy, injector, mixer gun, mixer, RTB, clips  Prototypes of Larger RPCs 5 RPCs (3 thick-thick RPCs, 2 thick-thin RPCs) 2 small exotic RPCs were repainted with the preferred paint. 1.Mechanical Performance (ok!) 2.Performance Test (different paints, difference design.)  RPC Manufacture, Yield Estimation  Cassette (Module) Assembly

3 Preparation List  Glass: delivered √ 300 thick glass sheets thin glass sheets Thickness: thick(1.09mm), thin(0.84mm) Dimension: 32.0cm*96.0cm, not perfectly identical(<+-0.5mm) Design Plan: 1)baseline:2-glass design (thick + thin) 2)Option: 1-glass design (thick ) Difficulty: two Front-End Board per RPC. How to connect them and keep the same size as the glass sheet.

4 Preparation List (cont.)  Edge Frames 1.Close to finalizing the fixture 2.Need to build one RPC with the frames produced by this fixture to check whether the longer sides of RPC are acceptably even and straight. 5 mins per set

5 Preparation List (cont.)  Insulating tubing & fishing line: Delivered, √ Same as the tubing we used before  Resistive Paint: 1-5MΩ / □,good uniformity, smooth surface 1.Most difficult part. 2. struggling on this issue. After tried all the possibilities we can try, we finally have one solution.( 60% black component+40%green component. Need to try out ) Delivered √ need to order again and delivery is quick. 3.Developping a spraying machine to control the quality of the paint.

6 Preparation List (cont.)  Resistive Paint:

7 Preparation List (cont.)  Resistive Paint: D. Underwood ?

8 Prototype Performance  3 Larger RPCs Three of them are 2-glass design 1)1.2mm+1.2mm glass sheets with old Licron paint. 2)1.2mm+0.85mm glass sheets with white paint 3) 1.2mm+0.85mm glass sheets with black paint. (surface resistivity is quite large)  2 exotic RPCs repainted with the black paint Lei spayed the paint really well: 2~4MΩ/sq. Measurement shows it’s Humidity independent. 90% efficiency

9

10 ~1.3 ~1.55 ~2.1

11 Long-term Stability  All the Larger RPCs haven’t had anything bad for 3 months.  2 exotic RPCs are also running well after 1-month running.

12 RPC Manufacture  Manufacture Procedures Step 0: Spay resistive paint Step 1: Fix the Edge Frames Step 2: Glue One Side Glass Labor-Consuming Step 3: Mount Fishing Line and gas pipes Labor-Consuming Step 4: Glue the Other Side Glass Labor-Consuming Step 5: Install HV Connecter and holder Easy to Learn and Operate Have drafted an instruction

13 Yield Estimation  We will parallelize RPC production and we will find enough space for this, so 1 Chamber per day per person is reasonable.  So far, we have two people who can do this job. We will train at least one more technician to join us. 120 RPCs -> ~2.5 months (2 technicians) 40 RPCs -> < 1 month(2 technicians)

14 Cassette Assembly Fixture for assembly Cassette (copper) Avoid to put much more weight on the Front-End Board and RPC 1.Hold all the 3 RPCs 2.Cooling the Front- End Board 3.Help lifting

15 Summary  We are ready for mass production if the following things are done: 1.building one RPC with the frames produced by this fixture to check whether the longer sides of RPC are acceptably even and straight. 2.Try 2 more ratios of the resistive paint to obtain the surface resistivity we need. Coming Soon!

16 The End Thanks!

17

18