Independent Evaluator Services   Contract Requires a Baseline Evaluation   Assets are either Equipment or Structures   Est. Replacement Value to.

Slides:



Advertisements
Similar presentations
Tips, Tricks & Unusual Infrared Solutions Presented by: Kim Lewis
Advertisements

The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Antique wooden step ladders. The electrician has his name on everything including these folding chairs used for their lunches.
Tam Valley School Modernization - Phase 1 Summer 2011.
1 Zero Tax Increase Referendum: Community Information Session.
MAINTENANCE MANAGEMENT Module 9
PowerPoint ® Presentation Chapter 32 Ordering and Receiving Materials Materials Supply Chain.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Source One Source One Network and Building Solutions.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
SUNY Canton Facilities Project Update Miscellaneous.
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
SURFACE NOISE CONTROLS. Source Path Receiver NOISE EXPOSURE CAN BE REDUCED BY:  APPLYING CONTROLS TO THE SOURCE (S)  BLOCKING THE PATH (S)  ENCLOSING.
Instrumentation: ground and noise Temperature Measurement.
 Review Alpena Biorefinery Hearing Conservation Program  Types of Hearing Protection Devices Employee Safety Training
Employment Level: 375+ Contract Relationships: 300+ Midwest Operations: 4 States (IA, IL, OK, CO) Sow Inventory: 60,000+ Finish Inventory: 750,000+
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
How to build a two storey house
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
Meg Thornton/IMPC-FWA-PWE/(907) 11/04/2008 UNCLASSIFIED 1 OF 18 Army Cost Analysis for Stabilization and Demolition of.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Finishing the Building
Building Plans.
Elevating the Quality of Life in the District. INVITATION FOR BID (IFB) Elevating the Quality of Life in the District DEFINITION: An Invitation for Bid.
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
The 3 parts of an electronic system are :
2009 IPC Energy Benchmarking Survey Initial Results Survey of 2008 operations.
Application – Identifying, Listing Equipment, and Documentation
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Tangible Property Regulations Presented by David W. Jennings, CPA.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
WALLS.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
March 4, What is a switch?  switch: a component made of conductive material that controls the flow of current through the circuit.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Saxe Middle School Renovation
AND AFTER INSTALLATION Technical Director, NASSCO
Boiler Room Atmospheric Boiler Power Boiler.
How Completed Interiors Are Achieved: Designing & Building
Photo Album by V. Venkatesan.
Pest Management.
. Level 3 Air Conditioning Inspections for Buildings
Infrared Inspection Services in UAE
Alcínia Zita Sampaio Miguel M. Ferreira Daniel P. Rosário
Contractor Open House and Diversity Networking Event
Fleet Turnover Transitioning Your Contract With a Healthy Fleet Health.
Town of Dunn Sanitary District No. 3
From AS :   Part 4— Commissioning, operation and asset management
Value of contract: Length of contract: Contract start date:
Facilities Projects Update
Using Sketchup for Home Contracting
Building & Property Committee
Ocean Sands Condo Association Annual Meeting January 19, 2019
Park Place Wesleyan Gala 2019
Mount Vernon Community School
Project: Wiring a Building
Community Practice Asset Management.
“ Construction of a Hospital Building” Submitted by: Zuhaib Alam 15PWIND0402 Submitted To: Prof.Rashid Nawaz Department of Industrial Engineering University.
Presentation transcript:

Independent Evaluator Services   Contract Requires a Baseline Evaluation   Assets are either Equipment or Structures   Est. Replacement Value to be determined   Service Life to be determined by Evaluator   Evaluator to inflate Assets by CPI

Independent Evaluator Services  Process to Remaining Service Life  Process to determine Remaining Service LifeEquipment: a. Visual inspection b. Review instrumentation b. Review monitoring instrumentation c. Review repair and replacement records d. Consult with manufacture’s specifications

Independent Evaluator Services   Manage Assets Structures – –Evaluator is to provide Functionality and Structural Evaluation – –Visual Inspection and Video Recording of the following: a.Buildings, earthwork, concrete, doors, hatches, stairwells, and windows b. All piping c.Structural components

Independent Evaluator Services   Visual Inspection and Video Recording of the following (continued): d.Walkways, roads, and all paved areas. e.Fencing and outside yard lights. f.Finished systems such as paint, sealants and other finishes. g. Wet wells, sumps, and lids h. Floors and floor coverings, ceilings and roofs

Independent Evaluator Services   Managed Assets Equipment - Critical Assets a. Perform diagnostic testing b. Perform vibration analysis c. Conduct tests on lubricants d. Test electrical motor circuits

Independent Evaluator Services   Each Structure will be Rated   Evaluator is to deliver report within 180 days   Cost of evaluation to be split 50/50