CLB/DAQ meeting, Paris APC, 05 September 2012 1 DAQ in infrastructure and DU foot P. Lamare (CPPM)

Slides:



Advertisements
Similar presentations
Orion Telecom Networks Inc VCL-E3 OLTE 34Mbps Optical Line Transmission Equipment Slide 1 Updated : January 1st, , Avenue of Fountains,
Advertisements

KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
By E. Anassontzis, A. Belias, E. Kappos, K. Manolopoulos, P. Rapidis on behalf of the KM3NeT Collaboration.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
6/10/2003 – e.heineVLVnT facility-power1 EFNI H K Introduction Hypothesis Topology, technical constrains Redundancy, budget constrains Grounding Reliability.
Smart-Grid: Power Distribution and Monitoring Application Cheryl Limas, Daniel Rendon, Advisor – Dr. David Wetz, Advisor – Gregory Turner Department of.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
INSTRUMENTATION NEEDS FOR THE CALIBRATION UNIT …AS A WORK DOCUMENT Pascale Keller KM3Net Meeting CPPM, january 2013 Inputs from : Miguel Ardid, Tassos.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
Page 1 NEPTUNE Alternate System Design Peter Phibbs 7-8 January 2003.
The Trigger and Data Acquisition System for the KM3NeT neutrino telescope Carmelo Pellegrino Tommaso Chiarusi INFN - Sezione di Bologna VLVnT 2015 | Rome,
What? Deployment of the first full KM3NeT string, a.k.a Detection Unit. Thanks to Aart Heijboer for the nice drawings!
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
MEUST infrastructure power system and control/command Power system  Onshore New power hut UPS Variable power  Offshore Artery cut Local energy DU supply.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
Introduction of Laser Evaluating Technology to Street Leak Surveys Ashraf Salha APA Group Gas Speak Colloquium September 2015.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
Global overview of the Optical Network for KM3Net Phase 1 Sander Mos KM3NeT Collaboration Meeting 30 January 2013 Marseille.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
Site for the PPM-DU String Layout Possible Site / Properties Power / Communication Contribution / Planning R.Papaleo, P.Lamare, E.Heine Bologna.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
The Neutrino Telescope of the KM3NeT Deep-Sea Research Infrastructure Robert Lahmann for the KM3NeT Consortium Erlangen Centre for Astroparticle Physics.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
PPM-DU (WORKING DOCUMENT, DO NOT PUBLISH) A three DOM Detection Unit in place of an Antares string. Nikhef for KM3NeT: PPM-DU optical network DRAFT!, designed.
DOM developments Mini DOM PPM-DOM in Antares PPM future WP F-L.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
CLB demonstration board & prototype tests (CLB: Central Logic Board) 1 WPFLElectronics PPMCLB F. Louis.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
WPFL General Meeting, , Nikhef A. Belias1 Shore DAQ system - report on studies A.Belias NOA-NESTOR.
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
PPM 30/10/2012. In-situ validation programme Oct/Nov 2012: VEOC prototype in Atlantic (monitor fibres, pressure) Dec(?) 2012: multi-PMT.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Positioning system Hardware
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Status Optical System KM3NeT
Deep-sea neutrino telescopes
DAQ read out system Status Report
Computing and Software – Calibration Flow Overview
On behalf of Patrick Lamare
Concluding remarks E. Migneco
Pasquale Migliozzi INFN Napoli
Institute of Nuclear Physics Polish Academy of Sciences
APC - Calibration Unit (Electronics implantation part)
Els de Wolf 20 February 2012, Catania
How SCADA Systems Work?.
Data transport architecture over fiber and/or copper
Kostas Manolopoulos Tasos Belias
TDR of PMT: Timing issues
Junction Boxes for KM3NeT
PPM-DOM. SPM DOM LCM SS-part ILxx
SUBMITTED BY, S.GUGAPRIYA( ) A.BOOMADEVI( ) INTERNAL GUIDE,
M.Bou-Cabo, J.A. Martínez.-Mora on behalf of the ANTARES Collaboration
Introduction to Networks
ANTARES time calibration
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
THE ANTARES SITE SECONDARY JUNCTION BOX
Characteristics of Reconfigurable Hardware
The Instrumentation Unit of The KM3NeT Calibration Unit
S OPTICAL COMMUNICATIONS AND INSTRUMENTS
Moxa Embedded Solution on IEC 61850
Fiber Optic Transmission
Presentation transcript:

CLB/DAQ meeting, Paris APC, 05 September DAQ in infrastructure and DU foot P. Lamare (CPPM)

CLB/DAQ meeting, Paris APC, 05 September Capo Passero Infrastructures layout Toulon ‘’Ring-like’’ geometry up to 6 nodes AC distribution up to nodes 36 user ports per node ‘’Star-like’’ geometry (PJB-SJB) DC distribution 8 user ports per SJB

CLB/DAQ meeting, Paris APC, 05 September  Main functions of infrastructure: o Power distribution to DUs, Calibration Units and Sea Sciences o provides optical network for the data transmission of DUs, CUs and SS o Hold some instrumentation  Infrastructure control/command independent from DUs detector control and data taking o Dedicated fibres o Dedicated software  Some instrumentation and optical network components of the detector located in the infrastructure but controlled by detector control (to confirmed)  Implementation of infrastructure could be slightly different for a Low Energy (LE) detector compared to High Energy (HE) detector Generalities

CLB/DAQ meeting, Paris APC, 05 September Optical network scheme of the detector Scheme for Capo Passero For Toulon globally the same, except PJB removed and more DUs per node (SJB)

CLB/DAQ meeting, Paris APC, 05 September Control at the DU foot Do we need a CLB at the DU foot?  Power: Perhaps o Power on/off DU: switch at the SJB (node) output o AC/DC converter in Toulon? Control needed?  Data transmission: No o No optical components in the DU foot (in the OFM at the middle of the line)  Instrumentation: o HE detector: Yes? In Toulon Some instrumentation could be located on DU foot for Toulon (or in Calibration Unit if in the field?) as no SJB distributed in the detector field as in Capo Passero o LE detector No No instrumentation on the DU foot (expected to be on CU) CLB at the DU foot perhaps needed in Toulon

CLB/DAQ meeting, Paris APC, 05 September DU tests What is available?  Electrical shore station to communicate with 1 DOM (present CLB design)  Optical test bench for 1 DOM What has to be developed?  Optical shore station  Electrical shore station for multiple DOMs  PC with run control  Software o Test set-up o Data analysis

CLB/DAQ meeting, Paris APC, 05 September DAQ in PJB, SJB and nodes Why DAQ/CLB needed in JB/nodes?  To control and monitor optical network for DU data transmission o Optical switch for timing calibration o Optical amplifier EDFA (?)  To control and monitor instrumentation o Hydrophone for acoustic positioning o Laser beacon o Current meter (?) One CLB with OLT in each JB or node needed at least for acoustic and laser beacon (one dedicated wavelength for each). Same CLB than in DOM preferably.

CLB/DAQ meeting, Paris APC, 05 September JB/nodes tests What is available?  Electrical shore station to communicate with 1 CLB (present CLB design) What has to be developed? o Optical shore station (all wavelengths needed but not at the same time) o Optical calibration system o PC with software (Run Control?) to communicate with CLB

CLB/DAQ meeting, Paris APC, 05 September Summary  CLB necessary in infrastructure but controlled by detector control (RC)  CLB in JB/nodes to be defined, is it the same as in DOM?  CLB in DU foot to be decided  Tools to be developed for testing (also needed for data taking)  CLB for JB/nodes and equipment needed before DU as infrastructure deployed early