Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012

Slides:



Advertisements
Similar presentations
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
Advertisements

Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Final Review Meeting, September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
HIE-ISOLDE Project Status Report
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
HIE-ISOLDE Project Y. Kadi (EN-STI) On behalf of the HIE-ISOLDE Coordination team.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
The HIE-ISOLDE Faraday Cup
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
Summary of LOIs to INTC (24 June 2010). Call for Letters of Intent (deadline May 21) 34 Letters submitted 284 Participants from 76 Laboratories in 22.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ISOLDE & HIE ISOLDE Status and Plans Richard Catherall EN-STI ISOLDE Technical Coordinator IEFC Workshop 7 th – 9 th March 2012.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
HIE-ISOLDE Status Report
PH Department News Discussion with management
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
for the EURISOL Steering Committee
Naming convention Rules
Update on the Ethernet Network Installation Campaign
HIE-ISOLDE Project: Planning & Resources
Report on HIE-ISOLDE Status & International Advisory Panel Meeting
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
PH Dept News Long shutdown 1: Baseline Project
Progress towards Pulsed Multi-MW CERN Proton Drivers
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Present and Future test facilities for High-intensity Targetry CERN
HIE-ISOLDE contribution packages
SLHC-PP kick-off meeting, CERN 9 April 2008
Beam Line to the HiRadMat Test Facility
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012

OUTLINE 2  Scope of HIE-ISOLDE  Upgrade of ISOLDE Facility: HIE-ISOLDE  R&D Activities  Outlook for 2012

ISOLDE: the ISOL-type RIB facility at CERN 3 Pulsed 1.4 GeV Proton beam Courtesy D. Voulot

4 Courtesy F. Wenander

Motivation 5 The High Intensity and Energy (HIE) ISOLDE project builds on the success of the REX-ISOLDE post-accelerator and will focus on the upgrade of the REX facility but also aims to improve the target and front-end part of ISOLDE to fully profit from upgrades of the existing CERN proton injectors (LINAC4 and PSB Upgrade): Higher energy for the post-accelerated radioactive beam More beams (Intensity wise and different species) Better beams (High purity beams, low emittances, more flexibility in the beam parameters)

HIE-ISOLDE aims at increasing the energy of these RIB up to 10A MeV and their intensity by a factor 10 6 Energy Upgrade: The HIE-ISOLDE project concentrates on the construction of the SC LINAC and associated infrastructure in order to upgrade the energy of the post- accelerated radioactive ion beams to 5.5 MeV/u in 2015 and 10 MeV/u by 2016 Intensity Upgrade: The design study for the intensity upgrade, also part of HIE-ISOLDE, starts in 2012, and addresses the technical feasibility and cost estimate for operating the facility at 15 kW once LINAC4 and PS Booster are online.

NuPECC Long Range Plan 2010 Timeline for RIB Facilities 7

Superconducting LINAC installed in Three Phases 8 3 stages installation 1.2 MeV/u 3 MeV/u 5.5 MeV/u 10 MeV/u Now >2017

HIE-ISOLDE SC LINAC 9

R&D activities (2008 – 2011) 10

Proposed stage 1 HEBT layout

Latest HEBT design – stage 2b All details on EDMS (HIE-ISOLDE/HEBT LINES OPTICS AND LAYOUT)  Drawings, layout tables and (new) madx reference optics files

Planning 13 ? ?

14 Civil Engineering Compressor and Cold Box Building Civil Engineering finished summer 2012 Autumn 2012 !

B. 170 B. 198 B. 199 Racks sub systems Electrical systems: Oct 2012 – June 2013

16 Cooling & Ventilation Cooling & Ventilation: Oct 2012 – June 2013 B. 199 cold box building B. 198 compressor building Experimental hall 170

17 Modular Linac & Cryo Line Courtesy: Stephane Maridor Cryo Cold Line- stage 1: January 2014 – June MeV/u Linac CM 1&2 - stage 1: August 2014 – October 2014 Sep 2014 – Feb 2015

18 Cryo Cold Line- stage 2 Modular Cryo Line Linac CM High-β 1,2,3&4 - stage 2a Courtesy: Stephane Maridor 2016 ? 10MeV/u

19 Cryo Cold Line- stage 2 Modular Cryo Line Courtesy: Stephane Maridor  2017 ? Linac CM High-β 1,2,3 & 4, Low-β 1&2 - stage 2b Chopper Line and Chopper Line

Call for Letters of Intent (deadline May ) 34 Letters submitted 284 Participants from 76 Laboratories in 22 Countries 30 LOIs make use of the Energy and Intensity increases; 4 of the intensity upgrade only Major mechanisms are Coulex (13) and transfer(16); elastic scattering(3); fission(2) (3) letters concern masses and moments; (4) astrophysics and (5) major new instrumentation Major subjects: Nuclear shapes ; Shell evolution; Halo properties; Nuclear astrophysics

Miniball + T-REX Segmented Ge array Inner Si-strip detection for charged particles (T-REX) No show stopping beam requirements but would benefit from slow extraction and buncher/chopper setup Geometrical properties Energy properties (FWHM values) Timing Power MINIBALL (+general purpose reaction chamber) <3mrad mm FWHM diameter (at MeV/u energy)* En. Spread: <1e-3 En. Accuracy: <1% En. Stability: ? Would profit from microstructure required by HELIOS About 26 kW

Helios Solenoid for transfer reactions Needs buncher/chopper for TOF measurement with 2 ns resolution setup Geometrical properties Energy properties (FWHM values) TimingPower HELIOS 3mrad + 5mm FWHM diameter at 5-10 MeV/u En. Spread: <1e-3 En. Accuracy: <1% En. Stability: Important (for 10MeV/u): resolution <2ns on target repetition rate: 1/100 ns no background (<1% acceptable) below 25 kW

ACTAR Active target for resonant scattering and transfer reactions Allows to measure with very low intensities setup Geometrical properties Energy properties (FWHM values) TimingPower ACTAR (input: R. Raabe) <2 mrad + 3mm FWHM diameter at 5-10 MeV/u* En. Spread: <1e-2 En. Accuracy: En. Stability: About 25 kW

BUDGET 24

OUTLOOK 25  Civil Engineering Works completed  Installation of Main Services (EL, CV, others)  Decision on the procurement of Cryogenic Plant (FC Dec. 2012)  Ready to launch procurement of first batch of high-beta cavities => via CATE + others  Ready to launch procurement of CM1 and CM2 => via CATE  Ready to launch procurement of HEBT phase-1  Cost and Schedule Review (22-23 Nov. 2012)

26 Thank you HIE-ISOLDE web site -> CATHI-ITN web site ->

Acknowledgements The ISOLDE Collaboration The HIE-ISOLDE Project Team and groups within CERN Accelerator and Technology Sector The Swedish Knut and Alice Wallenberg Foundation (KAW ) The Belgian Big Science program of the FWO (Research Foundation Flanders) and the Research Council K.U. Leuven The CATHI Marie Curie Initial Training Network: EU-FP7- PEOPLE-2010-ITN Project number The Spanish Programme “Industry for Science” from CDTI 27

HIE-ISOLDE Project 1. Project Management 2. Linac Systems 4. Installation & Commissioning 4. Installation & Commissioning 3. Infrastructure & Integration 3. Infrastructure & Integration 8.3 Access System GS/ASE 8.2 Radioprotection DG/SCR HIE-LINAC Design Study 5. Target Study 6. Target Area and Class-A Lab Integration 7. Injection & Beam distribution 8.4 Access System GS/ASE 8. Safety 2.1 Cavity RF BE/RF 2.2 Cavity Design manufacturing EN/MME TE/VSC 2.3 Beam dynamics BE/RF-ABP 2.4 Cryomodules TE/MSC EN/MME 2.5 Beam Instrumentations BE/BI 2.6 SC Solenoid TE/MSC 2.7 Beam transfer line (magnets) TE/MSC 2.8 Linac Integration EN/MEF 2.9 Vacuum TE/VCS 2.10 Survey BE/ABP 3.4 Electrical systems EN/EL 3.5 Cryogenic system TE/CRG 3.6 Power converters TE/EPC 3.7 Industrial Control system EN/ICE 4.1 Single cavity test BE/RF 4.2 Cryomodule test BE/RF 4.3 Transport & Handling EN/HE 3.8 Beam Control system BE/CO 5.1 Target design EN/STI-HE 5.2 Front Ends EN/STI TE/EPC-ABT 5.3 Beam Diagnostics BE/BI 6.1 Layout upgrade EN/MEF 6.2 Cooling and ventilation EN/CV 6.3 Electrical systems EN/EL 6.4 Vacuum TE/VCS 6.5 Survey BE/ABP 6.6 Civil engineering GS/SEM 6.7 LL Control system EN/STI 7.1 Off line separator EN/STI 7.2 Separator areas EN/STI 7.3 Experiment Hall EN/MEF 7.4 Beam lines BE/ABP Steering Committee International Advisory Panel 8.1 Safety Coordinator GS/DI 3.1 Civil Engineering GS/SEM 3.2 Integration EN/MEF 3.3 Cooling ventilation EN/CV 3.9 Interlocks TE/MPE 4.4 Planning & Installation EN/MEF 4.5 Linac commissioning BE/RF-OP 1.1 Project Leader – Y. Kadi (EN/HDO) 1.2 Project Safety Coordinator – A.P. Bernardes 1.3 Technical Coordinator – M. Pasini BE/RF 1.4 Design Study Coordinator–R.Catherall EN/STI 1.5 Budget and Planning – E.Delachenal EN/GMS 1.6 Administration – E. Cochet EN/GMS Work Breakdown Structure

Acknowledgements 29 International Collaboration I. Goulas International Advisory Panel A. Bracco Steering Committee M. Huyse Physics Coordination Maria Garcia-Borge Linac System W. Venturinia Design Study R. Catherall Safety A.P. Bernardes Safety Working Group Design Study Working Group Linac Commissio ning Working Group Cryo- modules Working Group RF Accelerati ng Working Group Beam Dynamics Working Group Technical Coordination Y. Kadi Project Management Y. Kadi Infrastruct ure & Integration Working Group Infrastruct ure & Integration E. Siesling High- Energy Beam Transfer WG Physics Working Group

Research Training Themes Addressed by the CATHI Proposal (56 FTE over 4 years) Y. Kadi HIE-ISOLDE Proposal, IEFC, August 21, 2009 HIE-ISOLDE General Meeting, 19 March