General Trends and Summary New gas generation is presently increasing faster than supply. However a slowing economy and less rapid demand in the industrial.

Slides:



Advertisements
Similar presentations
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Advertisements

Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
Financial Model.
Lignite Project By Ramic, Haris. GLOBAL OUTLOOK FOR ENERGY World energy consumption is projected to increase at about 1.8%/year between 2000 and 2030(driven.
Resource Adequacy in PJM
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Power Supply Options for Connecticut’s Energy Future Connecticut Energy Advisory Board Scott Davido President, Northeast Region NRG Energy, Inc. December.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
EE 369 POWER SYSTEM ANALYSIS
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
ENERGY MARKET PERSPECTIVE
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
0 CPUC / CEC Workshop Reporting and Tracking GHG Emissions for a Load Based Cap PG&E Reporting Emissions and Estimating Emissions from Unspecified Purchases.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Delivering commercial insight to the global energy industry Wood MackenzieEnergy Natural Gas Markets Enter an Era of Unprecedented Uncertainty.
Plug-in Vehicles and the Electric Grid Mark Kapner, PE Senior Strategy Planner Austin Energy
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
Generation Technologies in a Carbon-constrained World Steve Specker President & CEO October 2005.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Demand Response
Variable Load on Power Stations
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Enron North America. AC_01_ENA-1 Market-Making + Technology + Scale + Select Assets = Sustainable Competitive Advantage Enron North America North America.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Gas Turbine Power Plant
Zsuzsanna Csereklyei & David Stern
World Energy and Environmental Outlook to 2030
Aligning the Gas and Electric Markets: EDF Solutions
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Contents Introduction Focus area Wind scenarios
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Towards a 100% Renewable Energy Supply “Renewables Working Together”
Enron Generation Overview
Electricity Generation: Coal v/s N-Gas - Basic Economics
Distributed Generation
FUEL CELLS.
Electricity Generation: coal v/s n-gas - Basic Economics
Technology Comparison - IGCC
NS4960 Spring Term 2017 Japan: Energy Outlook
Sustainable Energy Planning for Autonomous Power System of Crete
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Overview of Coal-Fueled Power Plants
MRES Resource Operations in SPP
Texas oil and Gas Association Property Tax Representatives conference commodity price outlook March 7, 2018.
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
30th USAEE/IAEE North American Conference
Opportunities for Hydrogen-Based Energy Storage for Electric Utilities
City of Lebanon, Missouri Electric Department
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
New England Resource Adequacy
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Michigan Air Quality Division
New England Electricity Restructuring Roundtable September 18, 2009
Wholesale Electricity Costs
Joshua Linn (MIT and Resources for the Future)
NS4960 Spring Term 2018 Japan: Energy Outlook
California’s Clean Energy Future
Medium & Heavy Duty Electric Transportation Rate Designs at SCE
Sustainable Heating and Cooling in Sweden
Presentation transcript:

General Trends and Summary New gas generation is presently increasing faster than supply. However a slowing economy and less rapid demand in the industrial and commercial sectors will allow gas storage to return to normal levels by the fall. Greater than 50,000MW new gas gen in coal approx 500MW. Greater than 70,000 MW new gas gen in coal greater than 500MW. Interest in Coal is increasing due to economics, this will require gas to stay above >$3.50 to be economical. Interest in LNG is increasing due to economics, this will require gas to stay above >$4.50 to be economical. New coal plants will require base load to be economical. New coal plant issues are sitting, larger capital and longer lead time to build. Gas transportation bottlenecks will make LNG viable were transportation problems are encountered (coastal areas). Electricity transportation problems will make coal plants at existing sites marginal due transmission loading relief due to bottlenecks.

Eastern Interconnect Grid Overview Consists of the following NERC regions: –NEPOOL –NYPP –PJM –ECAR –MAIN Approximately 600,000 MW of installed capacity –44% coal –29% gas –14% nuclear Distinct summer and winter daily load profile –Graphical description to come for each NERC region The majority of maintenance outages occur in the spring and fall Capacity margin for 2001 is approximately 13% –Capacity margin is defined as the excess installed capacity over peak load (considered reserve) –MAPP –SPP –FRCC –SERC

Eastern Interconnect Fuel Consumption and New Generation

New Gas Generation

Eastern Interconnect & Ercot New Gas Generation vs Installed Coal Gen 13,501 23, ,093 90,650 37% EIC Total48,590 66, , ,542 46% ERCOT10,158 5,230 65,875 15,446 23% NEW GAS GENInstalled Through 2000

Fuel Consumption

Forward Power Production Note Decreasing Heat Rates Over Time

Hub Specific Trading Information

Forward Power Prices (5X16)

Cinergy Monthly Price (Megawatt Daily) Note absence of price spikes in summer 2000 and increasing Q prices

Coal Information

Background Information The production cost difference between two different generation sources is $13/Mw-hr VOM = variable operation and maintenance costs

CCPP-Coal Generation Cost Spread Current long-term curves show greatest generation cost spread in recent history FRCC is particularly gas overpriced WSCC is gas overpriced due to delivery constraints CCPP = Combine Cycle Power Plant

Background – New Generation As new capacity enters service, supply constraints will diminish Power “peaks” will flatten Price of power will now be driven more by underlying commodity Result: Except in WSCC, dampened “spikes” with highly coupled power and fuel prices

Coal Background Generation Production Costs (Fuel + VOM) Eastern Interconnect Generation Mix If gas price drops below $2.50/MMBtu delivered, the coal and CCPP stacks begin to “flip” Announced or newly completed plants –NatGas= 300,000 Mw –Coal= Negligible The gas portion of the power stack is increasing, while the coal portion is shrinking Result: Higher “floor” prices for power

Coal Emissions Background Emissions of New Coal Plants Coal is getting cleaner Clean-up techniques are getting better and more cost effective New technologies (IGCC) are reducing emissions even further

Opportunity - - Asset Play Economics Assumptions $1200/Kw Coal construction costs $650/Kw CCPP (gas) construction costs 30% 70% 90% Capacity Factor 1000 Mw plant Heat Rates –IGCC = 8200 Btu/Kw-hr –CFB = 9500 Btu/Kw-hr –CCPP = 6800 Btu/Kw-hr Power Curves –FRCC (ICF) –FRCC (Desk) –ERCOT (Desk) –WSCC (Desk) Results

Technology Comparison - IGCC Pros Integrated Gasification Combined Cycle Basically a coal gasifier connected to a regular combined cycle plant Uses well known power island technology gas turbines Has very low emissions easier to permit in “difficult” states Provides fuel optionality can easily shift between NatGas and Coal gas Overall higher capacity factor potential Potential shorter construction schedule Improved heat rate (~8200) Potential staggered approach (SS/CC/IG) Potential bi-product revenue streams (Argon, CO 2, etc) Can be modularized would provide a staggered COD schedule (250Mw year 1, 500 Mw year 2, etc) Potential “clean coal” money Cons Potential first year low coal capacity factor Newer, less-proven technology Potential higher capital costs Potential higher VOM costs

Technology Comparison - CFB Pros Potential lower capital costs than IGCC Circulating Fluidized Bed Potential lower VOM costs Can use a variety of coals including very low quality “waste coal” - - allows significant coal delivery cost reductions Less complicated technology than IGCC Lower emissions than older technology “pulverized coal” Can be modularized - - installed in blocks of 100Mw - 250Mw Potential “clean coal” money Cons No fuel optionality - - designed for coal only Higher capacity factor while on coal No byproduct revenue streams Potential longer construction schedule

NERC Region Profiles Eastern Interconnect and Ercot

EASTERN INTERCONNECT

NEPOOL

PJM

NYPP

ECAR

MAIN

MAPP

SERC-TVA

SERC-VACAR

SERC- SOCO

SERC

SPP

FRCC

ERCOT