10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.

Slides:



Advertisements
Similar presentations
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Advertisements

HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
CMX Collection file for current diagrams 30-Apr-2014.
MicroTCA in CMS Not Official! Just my opinions... Greg Iles 6 July 2010.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
E. Hazen1 New DCC Status and Software issues Eric Hazen, Phil Lawson, Shouxiang Wu, Jim Rohlf, Arno Heister, Jason StJohn Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
A Compact Trigger Architecture for SLHC
HCAL Data Concentrator Production Status
uTCA A Common Hardware Platform for CMS Trigger Upgrades
Task T - CMS at LHC Global Calorimeter Trigger
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Status of the oSLB project
AMC13XG (XG = Ten Gigabit)
ECAL OD Electronic Workshop 7-8/04/2005
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister,
Matrix Processor / Backplane Design Details
USCMS HCAL FERU: Front End Readout Unit
GEM for CMS Electronics Overview
RPC Electronics Overall system diagram Current status At detector
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University

10/28/09E. Hazen FNAL Workshop2 DTC Requirements ● Clock / Controls ● Receive TTC and/or upgraded controls stream ● Distribute clock and synchronous controls ● DAQ ● Readout DAQ data, optionally perform ZS or SR ● Transmit to SLink (via adapter) and/or new DAQ ● Must be an MCH card for connectivity ● Could eventually perform minimal MCH functions

10/28/09E. Hazen FNAL Workshop3 Existing HCAL Crate (complex cable plant!) Front-end Fibers (8x) Total 48 ch/HTR CAEN VME Bridge HTR VME Module DCC VME Module TP to RCT Vitesse serial TTC fanout VME Module HTR to DCC LVDS serial TTC/clocks SLink-64

10/28/09E. Hazen FNAL Workshop4 MicroTCA HCAL Crate

10/28/09E. Hazen FNAL Workshop5 Vadatech VT891 - commercial uTCA crate AMC 1 - SuperHTR AMC 2 - SuperHTR AMC 3 AMC 4 AMC 5 AMC 6 AMC 7 AMC 8 AMC 9 AMC 10 AMC 11 AMC 12 DTC (MCH2) MCH1 MCH1 (commercial): Ethernet, management interface MCH2 (DTC): Clock/controls distribution, DAQ

10/28/09E. Hazen FNAL Workshop6 MCH Mechanics (in progress) Front panel space very tight! Barely room for 3 SFP+ and TTC receiver T1 T2 T3 T4 MCH requires 4 connectors Plan is to use 2 PCBs, with connectors only at other two sites. Front panel Harting AMC, MCH plug connectors Harting MCH flex adapter

10/28/09E. Hazen FNAL Workshop7 DTC Clock / Controls PCB

10/28/09E. Hazen FNAL Workshop8 DTC DAQ board SFP+ Virtex 5/6 FPGA MCH Connect or 3 (4) Fabric D to AMC 1-12 DAQ MCH Connect or 3 (4) Fabric E to AMC 1-12 Spar e DAQ fiber Ethernet fiber Spare fiber Clock / Controls from Clock PCB ~ 6Gb

10/28/09E. Hazen FNAL Workshop9 Status and Plans ● Goal -- Test beam summer 2010 with uTCA system! ● Good news: FY10 funding approved as req'd ● SuperHTR / miniCTR2 card built at Minnesota and under test ● uTCA test crates available at BU, MN ● Detailed design just starting for DTC

10/28/09E. Hazen FNAL Workshop10 Spare Slides

10/28/09E. Hazen FNAL Workshop11 MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger platform for CMS Example “Matrix” card developed by LANL

10/28/09E. Hazen FNAL Workshop12 DTC Board Stack ● Build boards 1, 2 first ● Board 1: Power, controls ● Board 2: Clocks ● Build boards 3, 4 second ● DAQ concentrator

10/28/09E. Hazen FNAL Workshop13 DTC Block Diagram

10/28/09E. Hazen FNAL Workshop14 Typical MicroTCA Backplane Typical 12-Slot MicroTCA Backplane (Schroff)

10/28/09E. Hazen FNAL Workshop15 Typical MicroTCA Backplane Two MCH “Hubs” One will be commercial (for system control) (for HCAL, second will be our DTC)

10/28/09E. Hazen FNAL Workshop16 Typical MicroTCA Backplane 12 identical AMC slots (for HCAL, SuperHTR)