JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch.

Slides:



Advertisements
Similar presentations
JCOMMOPS SOT IV. SOOPIP Developments Web Site reliability POGO research cruise database to be developed as part of the SeaDataNet project Release.
Advertisements

The Way Forward From JCOMM-IV Some Personal Perspectives D.E.Harrison NOAA/PMEL & Univ. Wa. JCOMM-IV Technical Symposium Yeosu, South Korea May 2012.
OOPC 12th Session UNESCO Argo-Oxygen Program Overview White paper produced by writing team lead by Nicolas Gruber Scientific justification for measuring.
Data Buoy Cooperation Panel Hester Viola
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
Argo Status & issues for ADMT Argo TC ADMT#13 November 2012, Hyderabad.
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
JCOMM in-situ Observing Platform Support Centre & Argo M. Belbeoch Sept Hangzhou, CHINA.
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Argo Status Argo TC AST#13 March 2012, Paris nations maintain the global array and 20 more fill regional gaps 18 countries active in 2011 (16 inactive)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Status Argo TC, M. Belbeoch.
JCOMM Observing Programme Support Centre International Coordination and Gliders EGO #4, Cyprus Yves Desaubies Mathieu Belbeoch Hester Viola.
BPO Science Program14 December 2014Webiinar We cannot manage what we do not measure: Martin Kramp - JCOMMOPS Ship Coordinator.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
JCOMM in situ Observing Platform Support Centre JCOMMOPS
Zenghong Liu & Jianping Xu State Key Lab of Satellite Ocean Environment Dynamics The Second Institute of Oceanography, SOA GOVST-V , Beijing.
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
Argo workshop in Ghana, December Argo data status & data access.
ISABP meeting, Rio, August 2004 (1) DBCP DBCP 19 th session –Held in Angra dos Reis, October 2003 –Louis Vermaak presented report on ISABP.
Argo & New Telecom. Systems Technical Workshop Introduction and Summary. ADMT#11 October 2010, Hamburg/Germany.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
JCOMM OCG ROUNDTABLE September 2015 JCOMM in-situ Observations Programme Support Centre.
IOC Assembly June 2015 JCOMM in-situ Observations Programme Support Centre.
10 th Argo data management 2009 Toulouse What is new at GDACs ?
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS Johan Stander, co-president, JCOMM David Meldrum, co-chair,
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
WE Surface-based GOS for Weather May 2008 Up-date.
2nd Workshop on WIGOS Data Quality Monitoring and Incident Management (Geneva, December 2015) JCOMM Quality Monitoring and the role of JCOMMOPS Etienne.
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
JCOMM in-situ Observations Programme Support Centre
Project Office Progress Champika GALLAGE DBCP Coordinator/ OceanSITES Project Office OceanSITES th Steering Committee and.
Global Ocean Observing System & Argo by JCOMMOPS www. jcommops
IBPIO Programme report
Report of the Rapporteur on Marine Observing Systems
Argo & Google Ocean.
Jon Turton (JCOMM OCG Vice-Chair)
Cervical Screening Programme, England, : Graphs
M. Belbéoch, 8 June 2018 Global Argo Status M. Belbéoch,
JCOMM in-situ Observations Programme Support Centre www. jcommops
IBPIO Report 2015/2016 Intercessional Period
NHS Cervical Screening Programme, England, : Graphs
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
Candyce Clark JCOMM Observations Programme Area Coordinator
IMPROVING GLOBAL FORECASTS OF WEATHER & OCEAN CONDITIONS
JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola
Argo Status Argo TC, M. Belbeoch
JCOMM in-situ Observations Programme Support Centre www. jcommops
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
Challenges & opportunities for developping regional cooperation
International Argo Data Management Team
Argo Status Argo TC, M. Belbeoch
JCOMM in-situ Observations Programme Support Centre www. jcommops
JCOMM in-situ Observations Programme Support Centre
Support for SOT Activities
Discussion of Argo Implementation
Visualization of Global Argo Metadata:
Argo Information Centre & Argo Users
Presentation transcript:

JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch

JCOMM in situ Observations Programme Support Centre 04 March 2016Outline 1.Overview –Performance Indicators –Network –National Contributions –Coverage 2015 –Network evolution –Survival rate –Data flow status 2.Implementation –National Contributions distribution –National Contributions evolution –Density, Coverage –Age, Age Hot Spots Analysis –Plans 3.Data Flow –Pending floats –Delays by DAC –Timeliness by DAC –Observations –DM/RT status 4.Instrumentation –Models distribution –Models evolution –Models survival –Telecom. Systems distribution –Telecom Systems evolution 5.Operations –Deployments –Ships –Karahoa’s contribution –Publication rate 6.Communication –Design –Maps –Status –News

JCOMM in situ Observations Programme Support Centre 04 March 2016 GoodAverageBad Performance Targets TargetsInitialGlobalDeepBio IMPLEMENTATION ActivityNb of active units in the design targets = 3000, 4400, 1000, 900 OperationalityNb operational units vs targets in the design IntensityNb of units deployed (t -365) in the design targets =750, 1100, 250, 225 Coverage (Yearly)Nb of well sampled 3X3 grid element over last year see coverage map Coverage (monthly)Nb of well sampled 3X3 grid element over last month DATA FLOW DeliveryNb of operational vs registered units Quality (TEMP, PSAL)Nb of Profiles flag=‘A’ vs total (last month) DM ProcessingRation DM/DM eligible profiles Timeliness (FR, US)Nb of profiles distributed within 24h (last month) INSTRUMENTATION Reliability (75, 150)Nb of platforms surviving 75 or 150 cycles vs total deployment date [t-750; t-1115] or [t-1500; t-1865]

JCOMM in situ Observations Programme Support Centre 04 March 2016 Performance Indicators (%) IndicatorInitialGlobalDeepBio IMPLEMENTATION Activity Operationality Intensity Coverage (Yearly)7055 Coverage (monthly)5443 DATA FLOW Delivery94 Quality (TEMP, PSAL)93, 91 DM Processing69 Timeliness (FR, US)85, 84 INSTRUMENTATION Reliability (75, 150)75, 48 Very goodGoodAverageBad

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview

JCOMM in situ Observations Programme Support Centre 04 March 2016

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Network growth, distinct floats distributing observations at GDACs (monthly)

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Survival Rate by float generation

JCOMM in situ Observations Programme Support Centre 04 March 2016Overview Data flow obs (RT/DM): 20 Obs/Day

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Distribution of operational floats by country

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Country growth

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Country growth (zoom/ no US)

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation Age = (Latest Observation date – Deployment date)

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

JCOMM in situ Observations Programme Support Centre 04 March 2016Implementation

JCOMM in situ Observations Programme Support Centre 04 March 2016 Plans vs Density/corverage

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow Confirm float status (e.g. deployment failure) or enable data distribution

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow GDACs Delays

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow Timeliness

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow

JCOMM in situ Observations Programme Support Centre 04 March 2016 Data Flow as of 01/03/2016

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Models evolution

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Models evolution (zoom – no APEX)

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Survival chart model

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Distribution

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Sensors

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Telecommunication Types (55% Argos, 45% Iridium)

JCOMM in situ Observations Programme Support Centre 04 March 2016Instrumentation Telecommunication Types Evolution

JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

JCOMM in situ Observations Programme Support Centre 04 March 2016Operations

JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

JCOMM in situ Observations Programme Support Centre 04 March 2016Communication

JCOMM in situ Observations Programme Support Centre 04 March 2016Operations Publication rate

JCOMM in situ Observations Programme Support Centre 04 March 2016Communication Maps ftp://ftp.jcommops.org/Argo/maps/LATEST/ JCOMMOPS Ocean Observing Systems Status ftp://ftp.jcommops.org/Argo/Doc/ AIC.pdf ftp://ftp.jcommops.org/Argo/Doc/ AIC.xlsx News