Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update.

Slides:



Advertisements
Similar presentations
Battery Replacement Procedure For Gekko, Vyper, Cobra & Vytec.
Advertisements

Peter-Raymond Kettle MEG Review February Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad.
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
P.-R. KettleMEG Review July MEG Beam Line Studies.
Sensor For Cellular Activity Supervised by : Yossi Hipsh Preformed by: Assaf Haim Ohad Fremder.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Construction and Installation of the CLIC Experimental Area
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
Peter-Raymond Kettle MEG Review February MEG Commissioning & Engineering Run 2007.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
Tokyo - Topical Meeting, March Peter-Raymond Kettle Beam Line Update End-Caps End-Caps Insertion System Insertion System Target System Target System.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
FourStar Status Eric Persson (OCIW) Presented By.
Peter-Raymond Kettle MEG Review February BeamBeam LineLine StatusStatus.
L-band test stations in End Station B Richard Swent.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
P.-R. KettleMEG Review January MEG – Beam Line Studies Present Status & Overview since July 2002.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Director’s Review Dec 1999 DO Timeline Old Version J F M A M J J A S O N D J F M D Install silicon front-end ICD FPS Lum (L0) CFT install/hookup.
911Shield Initial APP Download. 911Shield Initial Setup Screen  Once the App is installed on your device it will require setup information as shown on.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
MEG I Accounting & Retrospective Peter-Raymond KettleMEG Fukuoka Meeting October
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
The Next Generation of a Gamma Irradiation Facility GIF++
ALICE 5 o’clock meeting Wk 51.
HAMANASI Truss Installation Graphics February 2014
St. George Infrastructure
EHN1 Extension planning
The LHCb Installation Story
CMS Area Working Group Meeting
CLAS12 Commissioning with Cosmincs
10/month is the present production rate 2 FTE + sporadic contributions
How to Download, Install, and Update AVG Antivirus?
CUORE Detector Calibration System
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Hall C SHMS & Configuration Status
In-Class Scheduling Exercise
T-489: Induced Activity and Residual Dose Rates
Polarized 3He target installation
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update

Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20072 Beam Schedule Update Beam Line + TC-associated: End  -Beam Commissioning 3/5 SU-Tests 7/5 BTS Warm-up 8/5 – 20-5 Remove BTS + Beam Line 21/5 – 25/5 Remove DS EC + Dc Rail System 21/5 - 25/5 Remove US EC + N 2 -Bag + Clean N 2 -Seal 29/5 – Clean N 2 -Seal 29/5 – 31-5 Install New US N 2 -Bag + US EC + Tests 1/6 - 17/6 + US EC + Tests 1/6 - 17/6 Install US TC 18/6 -25/6 Install Concrete Shielding Wall Kottmann et al. 27/6 DC Installation 25/6 – 6/7 Install New DS N 2 -Bag + DS TC 7/7 – 22/7 Install DS EC + Insertion System IS 23/7 -29/7 COBRA Gas Tests 2/8 -12/8 Beam Line + TC-associated: End  -Beam Commissioning 3/5 SU-Tests 7/5 BTS Warm-up 8/5 – 20-5 Remove BTS + Beam Line 21/5 – 25/5 Remove DS EC + Dc Rail System 21/5 - 25/5 Remove US EC + N 2 -Bag + Clean N 2 -Seal 29/5 – Clean N 2 -Seal 29/5 – 31-5 Install New US N 2 -Bag + US EC + Tests 1/6 - 17/6 + US EC + Tests 1/6 - 17/6 Install US TC 18/6 -25/6 Install Concrete Shielding Wall Kottmann et al. 27/6 DC Installation 25/6 – 6/7 Install New DS N 2 -Bag + DS TC 7/7 – 22/7 Install DS EC + Insertion System IS 23/7 -29/7 COBRA Gas Tests 2/8 -12/8

Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20073 Beam Schedule Update cont. C-W + Beam Line: Arrival C-W 15-16/5 Installation + finish Infrastructure Area 21/5 – 15/6 Arrival Beam Line Elements 21/5 – 25/5 Beam Line Set-Up + Testing (without/with COBRA) 21/5 – 17/6 Remove C-W Beam Line (DC-Install) 18/6 – 24/6 Install C-W Beam Line post Detector installation 2/8 - 12/8 Detector installation 2/8 - 12/8 C-W + Beam line Full Test + Calo. Calib. 12/8 ~ 9/9 C-W + Beam Line: Arrival C-W 15-16/5 Installation + finish Infrastructure Area 21/5 – 15/6 Arrival Beam Line Elements 21/5 – 25/5 Beam Line Set-Up + Testing (without/with COBRA) 21/5 – 17/6 Remove C-W Beam Line (DC-Install) 18/6 – 24/6 Install C-W Beam Line post Detector installation 2/8 - 12/8 Detector installation 2/8 - 12/8 C-W + Beam line Full Test + Calo. Calib. 12/8 ~ 9/9