The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.

Slides:



Advertisements
Similar presentations
Construction Method, Material Selection & Building Services
Advertisements

Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Structural System Overview
Skyscraper Construction
Tunnelling Methods.
Concrete Pre Cast Panel By Peter Spence ID:
Lecture Goals Slab design reinforcement.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Innovating in a compact environment
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
TOPIC 2: TYPES OF FOUNDATION
ERT352 FARM STRUCTURES FOUNDATION DESIGN
2001 Winter Presentation. Site Location Site View.
John Osborne GS/SE March 2013
Homebush Bay Rail Link l 700 lineal metres of precast concrete arch l 9 different profiles.8 x 2.5 to 19 x 8 l 900 units. l Reinforced soil with precast.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
FROM UNDERGROUND … Address: 59, 3 rd September Str. GR 10433, Athens, Greece s:
Topic B2 Sub-structure groundworks
Reading Structural Drawings
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Latest Advancements in Instrumentation, Monitoring and QA/QC Techniques for Deep Excavation Support Systems: Al Hilal Project, Abu Dhabi – A Case History.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
1. Out line  Site description  Architectural Design.  Structural Design  Environmental Design.  Mechanical design  Safety design An-Najah National.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
The Tunnel Dismantling Machine (TDM)
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
DIAPHRAGM WALLS.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
LP Consulting Pty Ltd A Consulting Engineering Firm LP Consulting Australia Pty Ltd is a boutique Consulting Engineering firm Australia that was established.
Structural aspects related to the vacuum vessel of the SHIP Project
Ryan Thurston | Duncan McLennan
Acciona Infrastructuras Canada
Foundations of Technology Construction
An-Najah National University
RIBA Plan of Work 2013.
Integrated design Of Fuel Station
Arch205 Materials and building construction 1 foundation
4th Annual Construction Law Summit
Arch205 building construction foundation
Framing the House                                                                                                                   
6 MMC (Off Site Production)
The sport hall.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
N.N.Som Consulting Geotechnical Engineer
Cebus Rimon Industrialized Construction Ltd
North Shore at Canton The Pennsylvania State University
Foundations of Technology Construction
Project: 250 West Street, Columbus, Ohio
An Introduction to Subway Construction Technology
CIC BIM Competition Presentation Template & Content Guide
RIBA Plan of Work 2013.
Muskat Secondary School Project
Life Cycle Costing.
Presentation transcript:

The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005

NMR City Project – Overview William Street Station – Facts and Figures Challenges Faced in Design - Design Elements - Major Constraints - Multi-Disciplinary Interfaces - Solutions Adopted Key Concepts for Design Delivery William Street Station 23 rd November 2005

Perth Yard Portal William Street Station Esplanade Station Cut and Cover / Dive Structures Bored Tunnel NMR City Project - Overview 23 rd November 2005

NMR City Project - Overview Client: Public Transport Authority (PTA) Main Contractor: Leighton Kumagai Joint Venture (LKJV) Principal Consultant: Maunsell Australia Pty Ltd Architects: Hassell Spowers Joint Venture (HSJV) Electrical and Mechanical: Alstom Australia 23 rd November 2005

William Street Station - Facts and Figures 138m long station box 29m wide at the northern end Track level 17m below ground 27,000m 3 of concrete 4,000 tonnes of reinforcement 70,000m 3 of excavation “Top Down” construction During operation – 16 Trains per peak hour (in each direction) – 50,000 passengers per day 23 rd November 2005

Challenges Faced in Design Design Elements Major Constraints Multi-Disciplinary Interfaces Solutions Adopted 23 rd November 2005

Design Elements 4. Excavate to concourse 6. Excavate to base 11. Backfill 3. Roof 5. Concourse 9. Column encasement 1. Diaphragm walls 7. Base and track slab 12. Operational 10. Platform/ internal structure 2. Barrette & plunge columns 8. Minipiles Construction Stages

Major Constraints 23 rd November 2005 Location and Position - Existing roads, buildings and services - Future development

Wellington Building William Street Station - Constraints 23 rd November 2005 (Copyright HSJV. Concept.)

Major Constraints 23 rd November 2005 Location and Position - Existing roads, buildings and services - Future development Wellington Building - Design of Underpinning - Support during excavation - Control of movement and deflections

The Wellington Building 23 rd November 2005

Major Constraints 23 rd November 2005 Location and Position - Existing roads, buildings and services - Future development Wellington Building - Design of Underpinning - Support during excavation - Control of movement and deflections Noise and Vibration - During construction - During operation Tunnel Boring Machine (TBM) - Traversing and launching from the station - “Soft Eye” to allow breakthrough - Interface between bored tunnel and station

23 rd November 2005 Tunnel Boring Machine (TBM) (Copyright LKJV.)

Multi-Disciplinary Interfaces 23 rd November 2005 Rail - Rail alignment and level - Transit space Architecture - Station concept - Space and light - Passenger flows

Concourse Level 23 rd November 2005 (Copyright HSJV. Concept.)

Platform Level 23 rd November 2005 (Copyright HSJV. Concept.)

Multi-Disciplinary Interfaces 23 rd November 2005 Rail - Rail alignment and level - Transit space Architecture - Station concept - Space and light - Passenger flows Electrical and Mechanical - Tunnel ventilation - Room sizes - Lighting, HV and LV supply, communications, fire services

23 rd November 2005 Station Plant Rooms

Solutions Adopted 23 rd November 2005 Diaphragm Wall Design Underpinning Design Concourse Design

23 rd November 2005 Diaphragm Wall Design Typical panels 30m long x 6.4m wide x 1m thick Toe level 11m below base slab level Supports the excavation during construction - Minimal noise and vibration compared to sheet piling - Can be installed within 1m-2m of existing buildings - GFRP reinforcement used at headwalls to allow breakthrough of TBM Forms the station box when operational - Designed for future development over and next to the station - Designed to withstand a 1 in 2000 year seismic event

23 rd November 2005 Diaphragm Walls

23 rd November 2005 Underpinning Design Minipiles supporting building and station roof installed from basement of existing building New station roof slab constructed in basement of existing building 5000t building load transferred from existing foundations onto new roof slab Deflections controlled during excavation using flatjacks Any damage to building to be limited to “very slight”

23 rd November 2005 Underpinning

23 rd November 2005 Concourse Design Concourse required for station layout and operation Also acts as a permanent prop to the diaphragm walls 600mm thick Critical part of architectural concept 27m long central void propped with massive steel sections Design force of 17,000kN with a moment of 1,600kNm

Concourse 23 rd November 2005

Key Concepts for Design Delivery 23 rd November 2005 Positive relationship with client Appreciation of multi-disciplinary relationships Close collaboration with construction team Design team based on site Creativity

NMR City Project – Overview Facts and Figures Challenges Faced in Design - Design Elements - Major Constraints - Multi-Disciplinary Interfaces - Solutions Adopted Key Concepts for Design Delivery William Street Station 23 rd November 2005

The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore Senior Engineer – Rail Maunsell Australia Pty Ltd 629 Newcastle Street, PO Box 81, Leederville, WA 6902 Tel: (08) (LKJV Project Office) 23 rd November 2005