Wim Weterings Remy Noulibos

Slides:



Advertisements
Similar presentations
Kicker SloW (KSW) magnets and Generators PSB 160 MeV H - injection L. Feliciano TE/ABT.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Transfer Line Linac4 to PSB: Injection Aperture Limitations.
1. BI.STR Stripping Foil exchanger: Controls hardware & spending 2 Pieter Van Trappen PVT - TE-ABT-EC.
Injection foils and handling system Review on PSB 160 MeV H - Injection 9-10 November 2011 W. Weterings C. Boucly, M. Hourican, R. Noulibos, Y. Sillanoli.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Status Report of the PSB Half-Sector and Stripping Foil Test in L4T
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
1 1. Some recent views ( ) 2 Linac tunnel
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
ISIS Upgrade Modelling Dean Adams On behalf of STFC/ISIS C Warsop, B Jones, B Pine, R Williamson, H Smith, M Hughes, A McFarland, A Seville, I Gardner,
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
Principals of fast injection and extraction R. Apsimon.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Some ideas to optimise PSB injection chicane Wim, Brennan, Jan, Masamitsu.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LIU – EVM status and next steps
The TV Beam Observation system - BTV
J.-L. Sanchez Alvarez(PSB-EIC)
LINAC4 ADVISORY COMMITTEE
Wire Scanner / A.Demougeot
ELENA installation and commissioning status
Online check lists Half Sector Test
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
LIU–PLI report LIU PSB meeting.
ELENA Beam Transfer Workpackage
LIU-PSB Status and Outlook
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
HALF SECTOR TEST: a test for the future PSB injection
WPs concerned by L4 connection:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
LIU Wire Scanner Series Costs
Update on the PSB Transfer Lines
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

Wim Weterings Remy Noulibos General description of TL and PSB injection Review the activities on ABT systems for the LIU-PSB 10-09-2014 Wim Weterings Remy Noulibos

ABT components and related elements PSB Injection Region Proton Distributor BI.DIS System of pulsed magnets, which kick slices of the 160 MeV H- beam from LINAC4 to different vertical positions at the vertical septum BI.SMV. Vertical Septum BI.SMV Beam slices are further deflected by BI.SMV septa into the BI.BVT vertical dipole to achieve the required booster beam level separation of 360mm between each ring. H- Charge-Exchange System The beam is injected through a graphite stripping foil BI.STR to convert ~98% of the beam to H+, using 4 magnets BI.BSW creating the injection bump and a 4 horizontal kickers KSW, outside the injection region, producing the painting bump. Related Control systems for all Equipment

LIU-PSB timeline for H- injection agreed by the LIU project. 77th IEFC meeting INDICO event 212744 Planning Stripping foil Test Stand installation Q1 2015 Half Sector Test Wim Weterings, LIU 2013, April 12, 2013

Related Workunits of this Presentation 92154 Booster injection modification studies (no budget) 96123 Injection zone Support structure 92163 Provide foil handling system 130456 Stripping Foil Mechanical Units (Half Sector Test) 92123 130456 92163

Injection Zone Support Structure PSB Injection region after modification to H- Injection

Injection Zone Support Structure The required support structure for installation and alignment of equipment The specifications is clear and study ongoing. 1 unit due Q2 2016.

Injection Zone Support Structure Description Injection zone Support structure APT wu 96123 Wu responsible wim.weterings@cern.ch Budget code 65733 42kchf 2012? Jobs have been paid, but drawings not yet delivered. Not found in CET by me See next slide Metrics per year in kCHF Year 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 PV 18 31 67 65 52 EV 23 AC 42 58 New PV 25 80 Design Jobs Manufacture

Injection Zone Support Structure

Beam Observation System (BTV) with Foil Handling Unit Radiation Hard Camera Mirrors and Optical Filters Stepping motor Beam Observation System (BTV) with Screen retracted Magnetic coupling Vacuum Chamber Foil Changer 1 prototype (to be installed Q1 2015 – L4 Stripping Foil Test Stand) 6 Foil handling units (inconel chambers in BSW WU). The specifications is clear and complete. 1 unit due for Half Sector Test (HST), Q4 2015. 5 unit due for Q2 2016.

Foil Handling Unit 1 proto is being build and will be used for the stripping foil test stand Description Provide foil handling system APT wu 92163 Wu responsible wim.weterings@cern.ch Budget code 65732 Metrics per year in kCHF Year 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 PV 13 18 12 7 6 115 189 99 EV 29 1 16 AC 15 24 27 New PV 100 120 20 Prototype and HST Box

Stripping Foil Mechanical Units L4T: new Linac4 to Linac2 transfer line Bettina Mikulec, INDICO 300182 Part 2: PSB half-sector test installation Part 1: H- stripping foil test stand + BTV unit BI Technical Board 27/02/2014 12

Linac4 Masterplan Bettina Mikulec, INDICO 300182 Prepare stripping foil installation Install HST Services Finalise HST installation BI Technical Board 27/02/2014

Stripping Foil Test Stand – What is included “Prototype” Stripping Foil Unit with support structure. The specifications is clear and complete. 1 unit due Q4 2014. Installation Q1 2015 F. Bertarelli, J. Coupard, M. Vretenar have decided that the prototype only needs to be manufactured for 12/2014. This means we will only assemble and cannot test our mechanism before installation in L4 To be clarified ! Support feet & Survey equipment (99232) Stripping Foil Test Stand (65732)

Stripping Foil Test Stand – Sector 1.1 Beam Current Transformer (BCT) Beam Vacuum Valve Vacuum Valve Stripping Foil Test Stand

Half Sector Test – What is included “Operational” Stripping Foil Unit with BSW2-3 vacuum chambers will be installed, so no cost involved for workunit 130456. 1 unit due for Half Sector Test, Q4 2015. Striping Foil Unit BSW4 BSW3

Stripping Foil Mechanical Units Description Stripping Foil Mechanical Units * APT wu 130456 Wu responsible wim.weterings@cern.ch Budget code 99232 * Half-sector test Metrics per year in kCHF Year 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 PV 13 2 EV 4 AC New PV 13 2 Not clear, we already spent money