13 th September 2012 – 0v6 Radiation Tolerant Power Converter Controls thanks to: TE/EPC/CC, Y. Thurel, A. Masi, M. Brugger, G. Spiezia.

Slides:



Advertisements
Similar presentations
Machine Protection – ISSC 2010B. ToddAugust 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 0v3 A Future Safety System?
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Machine Protection – ISSC 2010B. ToddAugust 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 0v3 A Future Safety System?
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Total Dose Effects on Devices and Circuits - Principles and Limits of Ground Evaluation-
Why a course  We will try to answer the following questions:  How do know I am in a “risky” area  I design a rad-tolerant electronic system (hardware/software)?
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Rad-Hard qualification for the LHCb RICH L0 electronics M. Adinolfi.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Space Radiation and Fox Satellites 2011 Space Symposium AMSAT Fox.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
Introduction to availability modelling in ELMAS Arto Niemi.
B. Todd et al. 25 th August 2009 Observations Since v1.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Hardware Architecture A. Voto, I. Dai, P. Oleniuk, B. Todd Standardisation of Automated Industrial Test Equipment for Mass Production of Control Systems.
Pawel Krakowski TE-VSC-ICM LHC R2E for vacuum control systems Vacuum, Surfaces & Coatings Group Technology Department Automation Forum-electronics session,
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
Thurel Yves – CERN / Chamonix 2010
A complete DC/DC converter ASIC for LHC upgrades S. Michelis, F. Faccio, G. Blanchot, I. Troyano CERN PH-ESE S.Saggini University of Udine, Italy Twepp.
CERN Converter Control Electronics Setting the Scene
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
CERN Dependable Design Example ITER – Machine ProtectionB. ToddMay 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Beam Related Machine.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
CERN Marc Magrans de Abril MPP – RBI DCCT Incident Beam Lost in TI2 Event Analysis and Proposed Mitigations SPS and LHC MPP
B. Todd, A. Apollonio, S. Gabourin, S. Uznanski Principles and Experience in the 1v2 Design & Operation of Dependable Systems.
Analyzing & Building Electrical Circuits.  Predict the effects of switches, resistors and other circuit diagram symbols.  Draw circuit diagrams for.
CERN Converter Control Electronics Strategy for LHC Machine Electronics : Limitations & Risks
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Thanks to: A. Short, Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 1v1.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
Electrical circuits, power supplies and passive circuit elements
The Survey of the Power Supply Reliability at SSRF
Rad (radiation) Hard Devices used in Space, Military Applications, Nuclear Power in-situ Instrumentation Savanna Krassau 4/21/2017 Abstract: Environments.
Bending crystals for magnetic and electric dipole moment measurements
contribution to the round table discussion
AUTO SWITCH OFF OF TV WHILE SCREEN GOES WITOUT VIDEO
Electrical circuits, power supplies and passive circuit elements
Setup beam intensities for FCC-hh
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
VIDEO ACTIVATED RELAY TO CONTROL
Islamic University of Gaza
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Perspective on future challenges for very high energy hadron colliders
Accelerator and Experiment Interface Session: LS2, LS3
the CERN Electrical network protection system
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Status and evolution of radiation dose on 60A power converters
Collimator Control (SEUs & R2E Outlook)
CSP Meeting CERN CERN Accelerators in th November 2010
HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

13 th September 2012 – 0v6 Radiation Tolerant Power Converter Controls thanks to: TE/EPC/CC, Y. Thurel, A. Masi, M. Brugger, G. Spiezia et al…

CERN TWEPP 2012 CERN CERN Accelerator Complex Lake Geneva Geneva Airport CERN LAB 1 (Switzerland) CERN LAB 2 (France) Proton Synchrotron (PS) Super Proton Synchrotron (SPS) Large Hadron Collider (LHC) 27km long 150m underground

CERN TWEPP 2012 CERN, the LHC and Machine Protection CERN 3 of 23 CERN Accelerator Complex Large Hadron Collider (LHC) Beam-1 Transfer Line (TI2) Beam-2 Transfer Line (TI8) Beam Dumping Systems Super Proton Synchrotron (SPS) 100us for one turn,

CERN TWEPP 2012 CERN CERN Accelerator Complex CMS ALICE ATLAS LHC-b

CERN TWEPP 2012 CERN CERN Accelerator Complex CMS ALICE ATLAS LHC-b

CERN TWEPP 2012 CERN CERN Accelerator Complex CMS ALICE ATLAS LHC-b

CERN TWEPP 2012 Introduction Power Converters = Power Supplies Critical for operation of CERN’s machines Direct impact on beam quality Direct impact on machine availability x x x x x x LS 1-2 ≈6.5≈3 x ≈1 x Year Peak Energy [TeV] Peak Intensity [p] Peak Luminosity [cm -2 s -1 ] 7 [1,2,3]

CERN TWEPP 2012 Introduction Power Converters = Power Supplies Critical for operation of CERN’s machines Direct impact on beam quality Direct impact on machine availability x x x x x x LS 1-2 ≈6.5≈3 x ≈1 x Year Peak Energy [TeV] Peak Intensity [p] Peak Luminosity [cm -2 s -1 ] 8 LS1 = Long Shutdown #1 – from 2013 to 2014 – upgrade magnet interconnects LS2 = Long Shutdown #2 … [1,2,3]

CERN TWEPP 2012 Introduction Power Converters = Power Supplies Critical for operation of CERN’s machines Direct impact on beam quality Direct impact on machine availability x x x x x x LS 1-2 ≈6.5≈3 x ≈1 x Year Peak Energy [TeV] Peak Intensity [p] Peak Luminosity [cm -2 s -1 ] 9 Function Generator Controller F Increasing energy and intensity = increasing levels of radiation in machine environment existing converter controls would have low availability when higher energies and intensities are reached in the LS 1-2 era GC Function Generator Controller FGClite a design optimised for high availability in radiation = the next 25 years of LHC [1,2,3]

CERN TWEPP 2012 Power Converters & Controls

CERN TWEPP 2012 Magnet Powering Circuit 11

CERN TWEPP 2012 Magnet Powering Circuit 12

CERN TWEPP 2012 Magnet Powering Circuit 13

CERN TWEPP 2012 Power Converter 14

CERN TWEPP 2012 Power Converter Closed Loop Current Regulation Converter State Control (ON/OFF/RESET) Machine Protection Interlocks Diagnostics 15

CERN TWEPP 2012 Power Converter Types 16 [4,5]

CERN TWEPP 2012 Power Converter Types Function Generator Controller F G C 17 [4,5]

CERN TWEPP 2012 Radiation Effects

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) prompt cumulative 19

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) defects accumulate and gradually destroy the silicon lattice 20

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) SIO 2 21

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) SIO 2 22

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) accumulate and gradually degrade the transistor function SIO 2 23

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) electrons collected by junctions creating parasitic current SE Transient (SET) SE Upset (SEU) SE Functional Interrupt (SEFI) SIO 2 24

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) CMOS parasitic bi-polar transistors… Switch on = short drain to source… SE Latch-up (SEL) 25 N P N P N P

CERN TWEPP 2012 in a nutshell 1. Displacement Damage (DD) 2. Total Ionising Dose (TID) 3. Single Event Effects (SEE) cumulative prompt SE Latchup (SEL) SE Transient (SET) SE Upset (SEU) SE Functional Interrrupt (SEFI) Non-Ionising Energy LossGrays lifetime! random in time failure! Cross-section mitigation is possible… 26

CERN TWEPP 2012 Surface Buildings Power converters are installed in one of five areas with machine radiation risks: none Perpendicular galleriesnone - low Parallel gallerieslow Alcovesmedium - high LHC Tunnel high [6]

CERN TWEPP 2012 Power converters are installed in one of five areas with machine radiation risks: Power Converter

CERN TWEPP 2012 Power Converter Types 29 [4,5] ≈1000 FGClite needed… FCG2

CERN TWEPP 2012 FGClite

CERN TWEPP 2012 FGC2 31

CERN TWEPP 2012 Function 32

CERN TWEPP 2012 Software versus Programmable Logic 33 µPDSP

CERN TWEPP 2012 Interesting Points use several FPGAs, figure the rest out later… Is this becoming a standard design practice? power converter electrical interface = same Programmable Logic needs special attention in mission critical systems Voltage Source, Interlocks, DCCT will all be the same interface power converter operational functions = same The LHC is still going to be the LHC after LS1… FGC2 PCAD 2002 Xilinx Schematic Entry Altium Designer VHDL FGClite FGC2 hardware documentation limited… 10 years… technical motivations in the mind of previous experts FGClite hardware requirements document = reverse engineering FGC2 before starting… Ouch! 34

CERN TWEPP 2012 Design Flow

CERN TWEPP 2012 Design Flow for Radiation Tolerance 36

CERN TWEPP 2012 Design Flow for Radiation Tolerance Class 0 (C 0 ) Class 1 (C 1 ) Class 2 (C 2 ) components known to be resistant, or easily replaced, conceptual design not influenced by these components. components potentially susceptible to radiation, in less-critical parts of the system. Substitution of parts or mitigation of issues is possible with a re-design. components potentially susceptible to radiation, in more-critical parts of the system. The conceptual design is compromised if these components do not perform well. Substitution of parts or mitigation of issues would be difficult. Resistors, capacitors, diodes, transistors… Regulators, memory, level translators… ADC, FPGA, fieldbus driver 37

CERN TWEPP 2012 Design Flow for Radiation Tolerance 38

CERN TWEPP 2012 Design Flow for Radiation Tolerance 39

CERN TWEPP 2012 Design Flow for Radiation Tolerance 40

CERN TWEPP 2012 Design Flow for Radiation Tolerance 41 [7]

CERN TWEPP 2012 Lifetime & Reliability

CERN TWEPP 2012

CERN TWEPP 2012

CERN TWEPP 2012 Stress screening Run in Burn in Maintenance Plan considered by Reliability Analysis Programmable Logic?

CERN TWEPP 2012 FGClite Reliability Requirements acceptable failure rate < 40 per year… Mean Time Between Failures > hours (1000 units x 8800 hours per year) / 40 electrical SEE radiation cross-section cross-section <1 x > hours 46 [7]

CERN TWEPP 2012 FGClite Reliability Requirements acceptable failure rate < 40 per year… Mean Time Between Failures > hours electrical SEE radiation cross-section <1 x > hours equipment lifetime > 25 years… electrical DD / TID radiation >200 Grays design for 25 years 47

CERN TWEPP 2012 In Closing…

CERN TWEPP 2012

CERN TWEPP 2012

CERN TWEPP 2012 Visions of the Future “Fly like you test, test like you fly” risk is never zero mitigate the risks in every other way first more simple function = better move equipment… shield equipment …is the equipment’s function really needed? it does the minimum needed… it does it very well... risks assessed for additional features… Trust… but verify specify function... formalise if needed… test against function… follow the V-model… make tests as realistic as possible = test-bench function, test environment As Low As Reasonable Possible (ALARP) follow a strict development plan basic design has to be rock solid before adding complications for radiation to design a system for use in radiation… 51 [8]

CERN TWEPP 2012 Visions of the Future “Fly like you test, test like you fly” risk is never zero mitigate the risks in every other way first more simple function = better move equipment… shield equipment …is the equipment’s function really needed? it does the minimum needed… it does it very well... risks assessed for additional features… Trust… but verify specify function... formalise if needed… test against function… follow the V-model… make tests as realistic as possible = test-bench function, test environment As Low As Reasonable Possible (ALARP) follow a strict development plan basic design has to be rock solid before adding complications for radiation to design a system for use in radiation… in machine protection 52 [8]

CERN TWEPP 2012 fin – thank you!

CERN TWEPP 2012 References From the Chamonix Performance Workshop [1] 54 Extracted from [2] Extrapolated from W. Herr’s talk: “Luminosity Performance Reach After LS1” [3] Derived from [4] Photographs courtesy Y. Thurel et al, from: “LHC Power Converters the Proposed Approach” [5] Diagram background is from [6] Figures and flow derived from work by Y. Thurel and S. Uznanski[7] Several sources – not an original statement from CERN. E.G. [8]