Mikolaj Cwiok, 10 June 2009 RPC Operation Day Towards LB configuration through TS: Improvements to CCU ring stability Mikolaj Cwiok – University of Warsaw.

Slides:



Advertisements
Similar presentations
Cable Testing.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
CSS Lecture 2 Chapter 3 – Connecting Computer Components with Buses Bus Structures Synchronous, Asynchronous Typical Bus Signals Two level, Tri-state,
Router. Switch Repeater Cable is the medium through which information usually moves from one network device to another. It used to connect one network.
Network Cabling and Wireless Network
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Computer Communications and Networking (CCN)
Transmission lines.
PROFIBUS wiring/installation can be done with:
Local Area Networks School of Business Eastern Illinois University © Abdou Illia, Spring 2015 (March 9, 2015)
Larg. Week, April 2002, Electronics Meeting1 Progress Report On Electronics Activities in Paris Bertrand Laforge LPNHE Paris CNRS/IN2P3 – Universités Paris.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
Review For Exam 2 School of Business Eastern Illinois University © Abdou Illia, Spring 2006 Wednesday 2/22/2006)
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Local Area Networks School of Business Eastern Illinois University © Abdou Illia, Spring 2007 (Week 8, Tuesday 2/27/2007)
12th Workshop on Electronics for LHC and Future Experiments Valencia Sept F. Loddo I.N.F.N. Bari An RPC-Based Technical Trigger for the CMS.
Network Cabling Presentation by: Dani Johnson, Dominik Pecararo, Tommy Yowell.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
LECTURE#6 - CABLES Asma AlOsaimi. Copper Coaxial Cable - Thick or Thin Unshielded Twisted Pair - CAT 3,4,5,5e&6 Optical Fiber Multimode Singlemode Wireless.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Geneva CMS Week, RPC Operation Review Anton Dimitrov RPC Detector Review Hardware Status and New Technical Procedures.
Data and Computer Communications Eighth Edition by William Stallings Chapter 15 – Local Area Network Overview.
Cisco I Introduction to Networks Semester 1 Chapter 4 JEOPADY.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
Fatima Alibrahim Intro. to Telecommunication MISY3312
Network Topology and LAN Technologies
ZTF Grounding or Yes, there are two paths you can go by
An Introduction to Transmission Media
HyperTransport™ Technology I/O Link
CCS Hardware Test and Commissioning Plan
Readout System of the CMS Pixel Detector
Network Media Types COMPUTER NETWORKS 4TH Edition Chapter3
A few ideas about detector grounding and shielding D. Breton
Totem Readout using the SRS
Meeting on Services and Power Supplies
DT & RPC Grounding STATUS
Networks in our daily life
Jan Królikowski Warsaw University
Test Slab Status CALICE ECAL test slab: what is it all about?
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Fill-pattern Control System for KEKB
RPC Detector Control System
Overview of T1 detector T1 is composed by 2 arms
RPC Detector Control System
on behalf of Barrel RPC Collaboration
RPC Front End Electronics
Local Area Networks School of Business Eastern Illinois University
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Differential Signal Path for 64 ch ZTF Mosaic
RPC Electronics Overall system diagram Current status At detector
RPC Detector Control System
Digitally subtracted pulse between
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Data Concentrator Card and Test System for the CMS ECAL Readout
Presentation transcript:

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Towards LB configuration through TS: Improvements to CCU ring stability Mikolaj Cwiok – University of Warsaw for the Warsaw RPC Trigger Group 10 June 2009

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Presently CCU token-rings are needed for: 1. LB/CB configuration from Flash (e.g. after power on). 2. Setting up FEB thresholds, FEB monitoring. 3. Masking noisy strips. 4. Collecting LB/CB monitorables. 5. Changing LB/CB firmware stored in Flash. There are 18 CCU-rings (10 barrel + 8 endcaps) In the future: Tasks 1) & 3) will be initiated by a TTC command. Introduction Eth cables Opto fibers DOH Eth cables 1 CCU-ring = 6 LBBs = 12 CBs FE C Topology of a CCU ring

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Introduction Original concept for TRACKER needs

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Electrical part CCU copper signal cable: CAT6 Ethernet cable as a medium. 8 signal wires (4 twisted pairs). Common shielding + aluminium foil for each signal pair. In our case: 3 pairs are used for CLOCK, DATA & RESET signals, 1 pair is reserved for GND. It was decided some years ago that: – Ground pins and shielding should be connected to the CB ground only at one end (LVDS transmitter side) – Between UXC floors signal pins should be galvanically insulated by means of LAN-transformers (LVDS receiver side).

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Problems 1. RF pickups: Despite using CAT6 shielded Ethernet cables the external EM noise sources present in the UXC cavern (e.g. nearby power cables, some electric equipment) are capable to corrupt 40MHz CLOCK and DATA signals or to trigger unintended RESET signals. 2. Limited VME crate bandwidth: Happens when too many CCU operations are demanded by LBB XDAQs at the same time (we use 18 FECs in 3 CCS boards in the same VME crate). Examples of such “conflicting” tasks are: setting FEB thresholds, reading FEB temperatures, reading LB/CB monitorables, programming LB/CB Flash memories. I will not address this second issue in this talk.

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Grounding scheme (present) GND_pins GND_shield CCU cable GND_out GND_in LAN-trafo CBCB LB B GND_cb GND_lbb CBCB LB B GND_cb GND_lbb LVDS transmitter LVDS receiver Signal pins are not shown for simplicity LBBs in the same rack: LBBs in different racks on different floors: OK, we are avoiding ground loops......but now cables are susceptible to RF pickups! GND_pins GND_shield CCU cable CBCB LB B GND_cb GND_lbb CBCB LB B GND_cb GND_lbb LVDS transmitter LVDS receiver Signal pins are not shown for simplicity

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Tests in the lab The problem was reproduced at the test stand in Warsaw: - a 5 meter CCU cable connecting two CBs, - a 220V power cable parallel to the CCU one over the distance of 2 meters, - fluorescent lamp or electrical motor acting as a “noise generator” for 220V bus, - # of errors was counted directly on the FEC mezzanine by triggering on {LINK_OK=false} OR {FEC_ERROR=true} condition. Different solutions were tested, including: - small modifications of the Control Boards, - different cable shielding scenarios.

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Control Board improvements ● Before LVDS receiver for CLOCK, DATA and RESET signals: ● After LVDS receiver for RESET signals only:   2 x 50   nF  nF 100 

Mikolaj Cwiok, 10 June 2009 RPC Operation Day LBBs in the same rack: LBBs in different racks on different floors: Still no ground loops and RF pickups are significantly reduced now. GND_pins GND_shield CCU cable CBCB LB B GND_cb GND_lbb CBCB LB B GND_cb GND_lbb LVDS transmitter LVDS receiver Signal pins are not shown for simplicity Shielding improvements GND_pins GND_shield CCU cable GND_out GND_in LAN-trafo CBCB LB B GND_cb GND_lbb CBCB LB B GND_cb GND_lbb GND_external LVDS transmitter LVDS receiver Signal pins are not shown for simplicity

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Summary 1. A way to reduce RF pickups by CCU cables seem to be in hand. 2. Will try it on two CCU-rings first (15-19 June): - RB-2 NEAR → modify cables and CBs, - RB-1 NEAR → modify only CBs. 3. If this works, will modify CB and/or CCU cables on all other rings in July before magnet tests start.

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Backup slides

Mikolaj Cwiok, 10 June 2009 RPC Operation Day CCU rings for RPCs Example for Barrel and YE1 Example for Barrel and YE1

Mikolaj Cwiok, 10 June 2009 RPC Operation Day CCU rings for RPCs Optical part: Connects FEC with DOH on the CB Two redundant signal paths called “A” and “B”. Each path uses 4 fibres: CLOCK_in, DATA_in, CLOCK_out, DATA_out Two CBs are equipped with DOH mezzanines Electrical part: Two redundant signal paths called “A” and “B” Interconnects: 6 LBBs (12 CBs) in barrel wheels and YE1 disks or 3 LBBs (6 CBs) in YE3 disks. 3 differential signals: CLOCK, DATA, RESET CAT6 Ethernet cables having: 4 individually shielded wire pairs, common outer shielding grounded at one end 4 LAN transformers between UXC floors Currently ring “B” cables are disconnected from all CBs

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Control Board improvements Test of 5m cable

Mikolaj Cwiok, 10 June 2009 RPC Operation Day Final improvements