USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, 2002 1 E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - - D4 A12 A13 B12 - B13 - - -

Slides:



Advertisements
Similar presentations
Some cryostat scintillator slides for Monday’s meeting Michigan State University.
Advertisements

Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Start Counter Construction Update Eric Pooser 08/21/2014.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Mass production and mechanical structure P. Pakhlov (ITEP)
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Off-Axis Collaboration Meeting Feb 7, 2004 Richard Talaga, Argonne (Liquid) Scintillator Structure Workshop Report Workshop Purpose –To review the current.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
V. Bobillier1 Cable installation status.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
IST 126 Computer Networks Spring, What is a Computer Network? A group of computers and other devices that are connected together in order to share.
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
ATLAS Internal ID Service Integration
Teleconference ACS – FREIA 31th May 2017
Detector building Notes of our discussion
WBS 1.03 Readout Systems Scope, Cost and Schedule
LIU Wire Scanner Milestones June 2017
Status of Prototype Preparation and SiPM Characterization
Scintillator module status
Services Layout – Update
Design of the He and HB ODU
IFR detector mechanics
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Success is when preparation meets opportunity
Preparations for test of
NA61 status and plans Preliminary spectra for T2K 2009 run
GLAST Large Area Telescope
Tagger Microscope Mounting, Shielding & Cooling
Project planning and status (February 2018)
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
Project planning and status (May 2018)
LCGT f2f meeting ICRR Kashiwanoha
Calice Tile-HCal and Tail-catcher/Muon Tracker
US-HiLumi – Shipping Post Assembly Status
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Outsourcing for the BGC
Presentation transcript:

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B B ITC Scintillator Project

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Responsibilities MSU –Produce ITC fiber assemblies for EB instrumentation - 99% completed –Design, construct and test prototypes of crack (E3, E4) scintillators - completed –Purchase scintillator (E1:E4) –Purchase & Prepare WLS fibers (E1:E4) –Assemble, test & install crack scintillators - purchase and assembly of mechanical components pending submission approval of drawings UTA –Design, construct and test prototype of gap (E1, E2, C10) scintillators - in progress –Assemble, test & install gap scintillators

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Gap Scintillator Design

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Crack Scintillator Design

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Optical Paths

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Envelope

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Mounting Proposal

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Special Mounting

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Issues & Status Funding/production status –Funding (USATLAS) OK’d for gap scintillators –Funding OK’d for crack scintillator mechanical components - Production delayed pending TC approval of drawings Special Modules –Fiber assemblies for modules with special ITC submodules is almost completed (except for 1 special module type) –Prototype mounting brackets have been made for modules with modified inner R - attached after EB assembly - allows us to use standard scintillators on all modules - one didn’t fit Light Covers –Plastic film to cover fiber cables, connectors - detailed design in progress

USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, Further testing –More Test Beam signal levels ? –Cs Scans - signal levels ? –Radiation hardness tests ? –Check mounting & light covers on EB pre- assembly Issues & Status (cont.)