LBT Q4 2008 Eng/SW Review SFWG – Software Group General Norm Cushing.

Slides:



Advertisements
Similar presentations
Web Trnsport Implementation TEA/TUG October 1-9, 2008 Saratoga Springs, NY.
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Client/Server Computing Ajay Kumar Shrivastava. Network Operating System (NOS) It manages the services of the server It exists at the session and presentation.
MCITP Guide to Microsoft Windows Server 2008 Server Administration (Exam #70-646) Chapter 11 Windows Server 2008 Virtualization.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
Installing software on personal computer
Computers & Employment By Andrew Attard and Stephen Calleja.
CAA/CFA Review | Andrea Laruelo | ESTEC | May CFA Development Status CAA/CFA Review ESTEC, May 19 th 2011 European Space AgencyAndrea Laruelo.
PCGRID ‘08 Workshop, Miami, FL April 18, 2008 Preston Smith Implementing an Industrial-Strength Academic Cyberinfrastructure at Purdue University.
CMPF124:Basics Skills for Knowledge Workers Introduction to Windows OS.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Software Review GCS – Guiding and Active Optics.
Welcome to the 2011 ACT User Meeting Jim Brod. Introductions Thank you for attending! 2.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
Nara Institute of Science and technology, Nara Prefecture, Japan CONFIGURATION AND DEPLOYMENT OF A SCALABLE VIRTUAL MACHINE CLUSTER FOR MOLECULAR DOCKING.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
DIT Campus Network Final Presentation Team Members Honoratha Shayo Vincent Jacob Ivan Masue Fredrik Andersson Ombeni Mnzava Sylvester Kimbi.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Implementation Review1 Archive Ingest Redesign March 14, 2003.
LBT Q Engineering/Software Review ROTRotators.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Software Development Cycle and Roles in a Project Team
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Cornell Information Technologies Information Systems/Data Delivery ACTUATE RETIREMENT PROJECT ASPC UPDATE 12/7/06 Objectives Primary - Retire Actuate Reduce.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Managed by UT-Battelle for the Department of Energy Clark Piercy ORNL Task Lead for Networking and Telecomm Update on Network Enhancements for Defense.
Successfully Implementing The Information System Systems Analysis and Design Kendall and Kendall Fifth Edition.
Distributed Systems Architectures Chapter 12. Objectives  To explain the advantages and disadvantages of different distributed systems architectures.
Chapter 1 Computer Technology: Your Need to Know
Software Hardware refers to the physical devices of a computer system.
Software Overview Sonja Vrcic
Cloud Challenges C. Loomis (CNRS/LAL) EGI-TF (Amsterdam)
IT Architecture Technical blueprint for evolving a corporate infrastructure resource that can be shared by many users and services processing systems hardware.
What is Virtualization Last Update
Prepared by: Assistant prof. Aslamzai
Universitat de Barcelona / FBG
Chapter 4: Routing Concepts
Design and Implementation
FY09 Tactical Plan Status Report for Site Networking
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Software Myths Deep Mann.
CS 31006: Computer Networks – The Routers
FY10 Tactical Plans for Enterprise Information Systems
OPS235: Lab 2 Virtual Machines – Part I
Optimizing the Use of an Integrated LMS:
Design and Implementation
FY10 Tactical Plans for Enterprise Information Systems
Chapter 7 –Implementation Issues
Chapter 8 Software Evolution.
Office of Superintendent of Insurance OSI Paperless, Web-based Environment – Project Change Request Presented to the DoIT Project Certification Committee.
Fundamental Concepts and Models
Tucson Unified School District
Business Services Goals and Objectives for /20/2019.
X-Ray Endstations Update
Akraino Lab IT Requirements for 2019 Budget
Presentation transcript:

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing

Jan 13, 2009LBTO Q Quarterly Review Progress Software Development Software Development Lucifer commissioning support. Members are still tired and productivity on new initiatives is still reduced. But, morale seems a bit better! Lucifer commissioning support. Members are still tired and productivity on new initiatives is still reduced. But, morale seems a bit better! Front Bent Gregorian Commissioning. On Going. Some work remaining. Front Bent Gregorian Commissioning. On Going. Some work remaining. Populate Telemetry from TCS subsystem. Data is being collected. Yippy! Populate Telemetry from TCS subsystem. Data is being collected. Yippy! Binocular Prime Focus. Delayed because of Lucifer commissioning and new Telemetry implementation efforts. Binocular Prime Focus. Delayed because of Lucifer commissioning and new Telemetry implementation efforts. Acquiring HBS PLC values and HBS State Machine Rework. Delayed. Acquiring HBS PLC values and HBS State Machine Rework. Delayed. Direct Gregorian Rotator control. Development has started. Much work remaining. Direct Gregorian Rotator control. Development has started. Much work remaining. Decide on LGS/TCS/AOS architecture. Still awaiting architecture decision from MPIA, (its been quiet). Decide on LGS/TCS/AOS architecture. Still awaiting architecture decision from MPIA, (its been quiet). High level Dynamic Balance Control. Nearing completion. Some work remaining. High level Dynamic Balance Control. Nearing completion. Some work remaining. Environmental Subsystem (to include LBTO Weather Station access by TCS). Is starting to get attention. Yippy! Environmental Subsystem (to include LBTO Weather Station access by TCS). Is starting to get attention. Yippy! Rotator GUIs need to be added to MCSPU and MCS subsystem. Almost completed. Rotator GUIs need to be added to MCSPU and MCS subsystem. Almost completed. Configuration Management improvements. Documented process. Handoff from Stephen to others allows extended vacations. Yippy! Configuration Management improvements. Documented process. Handoff from Stephen to others allows extended vacations. Yippy!

Jan 13, 2009LBTO Q Quarterly Review Progress cont. Tucson computer room Tucson computer room Electrical upgrade. Delayed until 2009 budget is released. Electrical upgrade. Delayed until 2009 budget is released. Rack refresh. In-progress. Rack refresh. In-progress. Network Network Private Fibers between Computer Room and Large Inst. Lab. Completed. Private Fibers between Computer Room and Large Inst. Lab. Completed. Cisco fiber and copper port increase (48 each). Completed. Cisco fiber and copper port increase (48 each). Completed. Characterization. Progress being made, some problems already identified. Characterization. Progress being made, some problems already identified. Documentation of network (copper and fiber). Some progress. More work remaining. Documentation of network (copper and fiber). Some progress. More work remaining. Architecture Re-design and Implementation. Delayed following further characterization and consulting. Should begin in early Architecture Re-design and Implementation. Delayed following further characterization and consulting. Should begin in early Install Hardware Infrastructure enhancements/upgrades Install Hardware Infrastructure enhancements/upgrades TCS Servers (Apr – May). Delayed. Planned for some time in 2009 using CentOS 5. TCS Servers (Apr – May). Delayed. Planned for some time in 2009 using CentOS 5. Memory upgrades to Mtn. TO workstations. Delayed until 2009 budget is released. Memory upgrades to Mtn. TO workstations. Delayed until 2009 budget is released. TEL Servers and databases. Mtn. Servers are Operational. Tucson Test Bed is delayed until TEL Servers and databases. Mtn. Servers are Operational. Tucson Test Bed is delayed until 2009.

Jan 13, 2009LBTO Q Quarterly Review Open Issues Technical Technical Network delays are continuing to be investigated. Network delays are continuing to be investigated. Network new architecture design and implementation needs to get started. Network new architecture design and implementation needs to get started. TCS should migrate to CentOS 5.x before the end of the 2009 monsoon season. TCS should migrate to CentOS 5.x before the end of the 2009 monsoon season. TCS should migrate to Qt 4 before the end of the 2009 monsoon season. TCS should migrate to Qt 4 before the end of the 2009 monsoon season. Need to migrate LBC to newer OS and C++ IIF interface to take advantage of ICE IIF interface. Need to migrate LBC to newer OS and C++ IIF interface to take advantage of ICE IIF interface. Web server consolidation, development, upgrade, and maintenance of existing tools needs to be championed and funded. Web server consolidation, development, upgrade, and maintenance of existing tools needs to be championed and funded. Schedule Schedule Lucifer commissioning is still severely taxing the group’s future work efforts. Extended effort must give way if “significant” new progress is to be achieved. Lucifer commissioning is still severely taxing the group’s future work efforts. Extended effort must give way if “significant” new progress is to be achieved. Binocular Prime Focus deployment delayed. Binocular Prime Focus deployment delayed. GCS GUI needs a lot of work and is behind schedule. GCS GUI needs a lot of work and is behind schedule. Dynamic Balance is almost finished. Dynamic Balance is almost finished. Telemetry usage by TCS subsystems is quite far along but needs some work. Telemetry usage by TCS subsystems is quite far along but needs some work. ECS completion and enhancements are not happening ? ECS completion and enhancements are not happening ?

Jan 13, 2009LBTO Q Quarterly Review Open Issues cont. Budget Budget 2009 budget was smaller than requested but its here. Yippy! 2009 budget was smaller than requested but its here. Yippy! Will not be possible to assume responsibility for DIMM, Lucifer, and LBC software. Will not be possible to assume responsibility for DIMM, Lucifer, and LBC software. Resource Resource Welcome back Titus. Yippy! Welcome back Titus. Yippy! Network Engineer/Administrator to carry out Network redesign implementation is not staffed. Will be utilizing consultant and IT staff. Network Engineer/Administrator to carry out Network redesign implementation is not staffed. Will be utilizing consultant and IT staff. Web services administration and development is not staffed. Web services administration and development is not staffed.

Jan 13, 2009LBTO Q Quarterly Review Planning Networking initiative Networking initiative Labeling cables (copper and fiber) cont. – 2009 Labeling cables (copper and fiber) cont. – 2009 Documentation of network (copper and fiber) cont. – 2009 Documentation of network (copper and fiber) cont. – 2009 Privatizing the TCS subnet Privatizing the TCS subnet Providing private instrument subnets – 2009 Providing private instrument subnets – 2009 Continue design of new networking architecture – Early 2009 Continue design of new networking architecture – Early 2009 Install Hardware Infrastructure enhancements/upgrades Install Hardware Infrastructure enhancements/upgrades New TCS Servers using CentOS 5.x as development test bed – New TCS Servers using CentOS 5.x as development test bed – New Mtn. TO workstations (not all). Scheduled after arrival of 2009 budget. New Mtn. TO workstations (not all). Scheduled after arrival of 2009 budget.

Jan 13, 2009LBTO Q Quarterly Review Planning cont. TCS Configuration Management TCS Configuration Management Operational and test builds deployed to telescope. Still needs work. Operational and test builds deployed to telescope. Still needs work. Branching for all development (no direct work being done on the software trunk). Still needs work. Branching for all development (no direct work being done on the software trunk). Still needs work. Merging into trunk only after telescope testing is concluded successfully. Still needs work. Merging into trunk only after telescope testing is concluded successfully. Still needs work. Software development and deployment managed as specific functional goals. Still needs work. Software development and deployment managed as specific functional goals. Still needs work. Software Development Software Development Prepare GCS for new AzCam control SW and MODS. Spring Prepare GCS for new AzCam control SW and MODS. Spring Enhance and finish GCS GUI Enhance and finish GCS GUI ICE support via IRS embedded in IIF Server. Feb ICE support via IRS embedded in IIF Server. Feb Work with INAF to have them migrate LBC to newer OS, C++, and ICE version of IIF. Monsoon Work with INAF to have them migrate LBC to newer OS, C++, and ICE version of IIF. Monsoon Complete Active Optics for Bent Gregorian commissioning (telescope and instrument). Early Complete Active Optics for Bent Gregorian commissioning (telescope and instrument). Early Direct Rotator. Spring Direct Rotator. Spring HBS. Not sure when this work will be executed. HBS. Not sure when this work will be executed. Binocular Pointing Binocular Pointing Collimation Collimation Telemetry Telemetry Environmental Subsystem (LBTO Weather Station) Environmental Subsystem (LBTO Weather Station) Dynamic Balance Dynamic Balance