DECam in 2014 - Overview Alistair Walker Version 3 December 1 2013 Ver 4 Updates Jan 21 2014 1.

Slides:



Advertisements
Similar presentations
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
1 Wireless for CELT? (Or: An astronomer thinks about BSAC and BWRC) Marshall Perrin Ay 250.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
LBT Q Engineering and Software Review ENGG Engineering General.
Software Status Sonja Vrcic Socorro,
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
1 Progress for July 16, 2011 We woke up to 9+ inches of new heavy snow.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
SAC Report Povilas Palunas 2/23/ Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
1 Progress for July 18, 2011 Morning Safety Meeting was held in the Control Room today. Tom & Herman worked with Jim Hughes (remotely) and made a temporary.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Heat Pump Water Heaters: Interior, Ducted Installations Presentation to the Regional Technical Forum December 13, 2011 Ben Larson, Ecotope
Alistair Walker - DECam Instrument Scientist Tim Abbott – Blanco Telescope Scientist CTIO/NOAO DES Collaboration Meeting Oct The Blanco Telescope.
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
ELENA installation progress F. Butin / ELENA collaboration.
The Blanco telescope and its instruments: a status report
Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
Blanco TCS Upgrade PDR Introduction Tim Abbott. This review This Introduction –Panel, Motivation, Goals & Specifications, Staff Encoders & servos – Michael.
ACTR Project #477 - Increase Cooling of Blanco Dome Update: Brooke Gregory 9Apr2015.
The Blanco Environmental Control System Alistair R. Walker November
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Technical resources schedule
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
IBBelle: Status & Plans
CTIO Weather Station renewal
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco Primary Mirror Cooling Protocol
Blanco Environmental Control System
Francois and Lau EATM 17 July 2012
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Alistair Walker Version 3 December
CTIO Weather Station renewal
Project Manager’s Report + DC/MoM Report
SPS cryogenic proximity equipment and SM18 validation
2011/ 07/06 Jacqueline Yan IPBSM
TripleSpec 4 Status and Coming Steps
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
DECam Filter/Shutter Installation and Filters Installation
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March ver 2
Status of the cryogenic system for B180
POMO Meeting ZTF REQUIREMENTS
IBBelle: Status Commissioning at MPP Transport to KEK
FourStar 4K x 4K JHK imager
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
SNS Cryoplant Commissioning Past Experiences
HL-LHC upgrade at IPHC news
Blanco TCS Upgrade PDR 23 Aug 2007
USP-IAG Universidade de São Paulo
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Presentation transcript:

DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan

Preamble This presentation covers FY14 (October to September ) DECam is a system – it is much more integrated with the telescope and facility than earlier instruments. Which means that everything has to work! 100% of (observing) telescope time in 2013A and 2013B. Probably >90% of (observing) telescope time in 2014A and 2014B 2

DECam Issues Today Why is CCD S30 not working?(Marco Bonati, Peter Moore, with Juan Estrada) FAULT APPEARS INTERNAL – STILL UNDER DISCUSSION, INCLUDING STEVE HOLLAND Is the non-functioning of the hexapod actuator #6 incremental encoder a wiring/connector problem? (Telops, ADS) YES - FIXED Check the SISPI computers and replace dying disks (CISS) REGULAR “MAINTENANCE” Pumping one cryo head, poor vacuum in the LN2 line segments (1S, 1R) where they pass into the PF cage (Telops) NO RESOLUTION YET, BIG ISSUE Understand the in-DECam humidity variations (Telops) MAY ENGINEERING Shutter hardware errors (see later), software errors (Klaus, Marco) ON- GOING, RUNNING TESTS FOR THE BONN SHUTTER FOLKS F/8 Handler problems (included for completeness but not mentioned again in this document) ON-GOING 3

DECam Issues Today II CCDs low light level non-linearity (Marco Bonati, Fermilab) TESTS SHOW THAT BIAS ADJUSTMENTS DO NOT FIX THIS, WILL (CONTINUE TO) FIX IN THE REDUCTION PIPELINES LN2 system CRIo reconstruction (Marco Bonati, Rodrigo Alvarez) – install May 2014 START IN MARCH (TBC) Improve robustness of wires and fibers associated with the Monsoon crrates (Telops, ETS, to be defined). NO PROGRESS YET 4

Regular Maintenance – the Biggies LN2 pump replacement. – The time for the next replacement is May – There have been some pump and controller improvements, and the pump is now on a UPS. – There are plans for further pump improvements including changing the operation (pressure, flow) parameters but it is not clear yet whether we will ever be in the situation of 12-month changes. MORE DISCUSSION AS SOON AS FERMILAB TESTS ARE COMPLETE Resources: Freddy Muñoz + TELOPS one week 5

Regular Maintenance – the Biggies Filter and Shutter mechanisms – We need to grease the slides etc – The shutter has already given signs of “sticking” – It’s a big deal to remove them from the instrument – We also have a new filter coming to install – Schedule for March 2014 MARCH RESOURCES: Patricio Schurter a/o Freddy Muñoz + Telops. For filter handling: Roberto Tighe and ? Time: one week 6

More Regular Maintenance Data Acquisition System Marco Bonati is a critical resource NESLAB system, Cage cooling system (Telops, Freddy Muñoz) Facility Utilities (Telops) – Dry air – LN2 – Vacuum – Gycol – Power Mountain Power (DECam has power monitoring installed, Telops) BLANCO JIRA SYSTEM NEEDED (ACTR 472 Manager T. Abbott) YES, AS OF JANUARY 10 Computer disks (CISS) Mountain network (CISS) 7

DECam Environment Improvements Cage Covers (in progress). (ACTR 442, Freddy Muñoz + Instrument Shop) – Then the cage cooling system will work IN PROGRESS, ALMOST READY FOR FINAL INSTALLATION Blanco hydraulic bearing oil cooler (ACTR ?, Telops, Edison Bustos) – Tim proved (again) that the oil is really hot DONE! Dome air conditioning - install, then optimize (ACTR new, Brooke) – The ETS resources are needed for the console room roof modifications IN PROGRESS New ECS algorithm – better control of the primary mirror temperature (ACTR 464, Alistair, Edison Bustos) A TEMPORARY AD-HOC ALGORITHM IS BETTER THAN THE OLD ONE Lag the high pressure helium lines from the compressor to the LN2 tank (Telops) NOT YET DONE New, reliable DIMM (New Project, Andrei, Edison Bustos) PARTS ON ORDER 8

Other Telescope Improvements that will benefit DECam Blanco Primary Mirror Support System - New high-resolution hardware allowing use of a LUT for astigmatism (at least) as a function of sky position (ACTR 470, Tim, Michael Warner) PROTOTYPE INSTALLED, AS OF Jan 13, UNDER TEST New dome encoders – a SIGNIFICANT number of DECam images are occulted by the dome ( Manuel Martinez, Andres Montane, ready for by the end of November) INSTALLED, WORKS, TUNING OF CONTROL UNDERWAY Wind blind encoding? (ACTR ?) NO PROGRESS 9

Still More Telescope Improvements Understand and improve telescope pointing (ACTR 443, Tim, Rolando Cantarutti, Omar Estay) Better integrate TCS and the DECam hexapod (associated with the above) UNDER DISCUSSION Understand the Active Optics System and Image Quality Including the BCams (DES team, Roberto, Alistair…) ON- GOING More telemetry: cage temperatures, anemometer, accelerometers (Kevin Reil-SLAC, Michael, Telops) ACCELEROMETER INSTALLED Jan 14, ANEMOMETER ARRIVED 10