Evolution of the gas system control for flight

Slides:



Advertisements
Similar presentations
TRD Emergency Actions for Temperature Control: (1) Heaters On/Off (2) Pump On/Off K. Andeen 20 March 2013.
Advertisements

Hands-On Microsoft Windows Server 2008 Chapter 11 Server and Network Monitoring.
CH 13 Server and Network Monitoring. Hands-On Microsoft Windows Server Objectives Understand the importance of server monitoring Monitor server.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
7/17/2002R. Henning -- TRD Gas Slow Control1 TRD Gas System Slow Control at MIT- Cambridge AMS TRD Meeting, CERN, July 2002 U. Becker, B. Demirkoz, P.
CH 13 Server and Network Monitoring. Hands-On Microsoft Windows Server Objectives Understand the importance of server monitoring Monitor server.
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
Timer Alarm. What Is The Timer Alarm? The Timer Alarm provides a method for triggering time- based alarms during script playback.
Cooling Test Results on fuzzy carbon substrate Setup in Lotima Room Used water/glycol mix (70/30 by wt) Neslab chiller to set temp Small pump to get the.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Gaseous N2 -196⁰C Vacuum Liquid N2 -196⁰C Radiation shields Outer wall
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Gas system Commissioning procedures and status
How SCADA Systems Work?.
MAUVE CO2 cooling review
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
JPL Autonomous Space Mission Simulation
Module 1: System Overview
AMS Summary 16:00 on Thu 29 Mar 2018 (GMT 088) To
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Wed 24 Oct 2018 (GMT 297) To
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Wed 31 Oct 2018 (GMT 304) To
August 23, 2000 R.N. Dubois Dow Chemical
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Thu 15 Nov 2018 (GMT 319) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
AMS Summary 16:00 on Wed 21 Nov 2018 (GMT 325) To
AMS Summary 16:00 on Wed 14 Nov 2018 (GMT 318) To
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To
16:00 on Thu 8 Nov 2018 (GMT 312) To 16:00 on Fri 9 Nov 2018 (GMT 313)
AMS Summary 16:00 on Fri 9 Nov 2018 (GMT 313) To
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Fri 23 Nov 2018 (GMT 327) To
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
Diagnostics Analytical 920 LC Semi-Prep 940 LC
AMS Summary 16:00 on Wed 23 Jan 2019 (GMT 023) To
AMS Summary 16:00 on Wed 9 Jan 2019 (GMT 009) To
AMS Summary 16:00 on Fri 11 Jan 2019 (GMT 011) To
AMS Summary 16:00 on Mon 14 Jan 2019 (GMT 014) To
AMS Summary 16:00 on Thu 24 Jan 2019 (GMT 024) To
AMS Summary 16:00 on Wed 13 Feb 2019 (GMT 044) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
ISRC and LEBT Vacuum System Design
LEBT water cooling system
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
AMS Summary 16:00 on Wed 10 Jul 2019 (GMT 191) To
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
AMS Summary 16:00 on Thu 04 Oct 2018 (GMT 277) To
FOAMPRO 2001 / 2002 Pump Panel. FOAMPRO 2001 / 2002 Pump Panel.
Infokall Enterprise Solutions
Presentation transcript:

Evolution of the gas system control for flight WINCAN Macro WINCAN WINCAN Diagnostic WINCAN Basic stop not ok ok WINCAN Monitor Code and Manual available at: http://www.cern.ch/spada/AMS/ F.Spada – AMS TIM April ‘06

ISS <-> ground data communication – software location WINCAN Macro state definitions JMDC HRDL WINCAN Monitor check list ISS GROUND WINCAN Macro State definitions, mixing) log files PC WINCAN Diagnostic WINCAN Basic user interfaces WINCAN Monitor display TRD Status display F.Spada – AMS TIM April ‘06

Security checks Security conditions to be verified before operating on the system On valves: Forbidden to open a valve if the last temperature readout is too old or if temperature is under a fixed threshold Forbidden to open a valve if a heater is on (not enough power) Before opening a valve on the tank - D vessel line, disable the upstream one (avoid two valves open at a time) On heaters No heater on if a Marotta valve is open (not enough power) Keep average dissipation (duty cycle) under a fixed threshold These conditions are automatically taken into account in what follows F.Spada – AMS TIM April ‘06

Defined states of the gas system/1 To minimize the communication with space: define states of the system – the definition resides on the JMDC from ground only send command “bring system in status x” Examples of defined states: state “Ground” Disable all Marotta Heaters off box S Disable all Marotta Close V8 Pumps off HV off Heaters off box C manifold Close all VA, VB, VC, VD F.Spada – AMS TIM April ‘06

Defined states of the gas system/2 state “Empty” bring to “Ground” state box S bring to “Ground” state box C verify temperature open V4 box S ok not ok open V18 box C heaters on bring to “Ground” state box S bring to “Ground” state box C verify pressure in D not ok ok F.Spada – AMS TIM April ‘06 stop

Defined states of the gas system/3 state “Ready” bring to “Ground” state box S bring to “Ground” state box C manifold bring to “Ground” state verify temperature open V8 box C ok open all VA, VB, VC, VD manifold not ok heaters on F.Spada – AMS TIM April ‘06

Defined states of the gas system/4 state “Run” bring to “Ready” state box S bring to “Ready” state box C manifold bring to “Ready” state verify P2 ok not ok stop pumps on box C verify temperature HV on box C ok not ok F.Spada – AMS TIM April ‘06 heaters on

Diagnostic procedures/1 Example of a procedure to determine the status of electromechanical components: check of the Marotta valves in the box S after a dysfunctional behaviour of the pressure in the D vessel. F.Spada – AMS TIM April ‘06

Diagnostic procedures/2 open V1A open V2A open V3A V1A = ok V1B = ? V10A = ? V10B = ? V2A = ok V2B = ? V3A = ok V3B = ? V20A = ? V20B = ? measure P2A ok stop not ok measure P2B ok stop P2A = ko not ok open V10A open V2A open V3A measure P2 V1A = ko V1B = ? V10A = ok V10B = ? V2A = ok V2B = ? V3A = ok V3B = ? V20A = ? V20B = ? ok stop not ok F.Spada – AMS TIM April ‘06

Diagnostic procedures/3 open V20A open V20B open V2B open V3B V1A or V10A = ok V1B = ? V2A or V3A = ko V10B = ? V2B = ok V3B = ok V20A = ok V20B = ok measure P2 ok stop not ok open V1B open V2B open V3B (V1A & V10A) or V20A or V20B = ko V1B = ok V10B = ? V2A = ? V2B = ok V3A = ? V3B = ok measure P2 ok stop not ok F.Spada – AMS TIM April ‘06

Diagnostic procedures/4 open V10B open V2B open V3B measure P2 (V1A & V10A) or V20A or V20B = ko V1B = ko V10B = ok V2A = ? V2B = ok V3A = ? V3B = ok ok stop not ok open V20A open V20B open V2A open V3A V1A & V10A = ko V20A & V20B = ok V1B or V10B = ok V2A = ok V2B or V3B = ko V3A = ok measure P2 ok stop not ok stop P2a, P2b ko??? F.Spada – AMS TIM April ‘06

Summary WINCAN split in four branches Basic Monitor Macro Diagnostic Security conditions included Defined states of the system To do: Continue with safety study More diagnostic procedures … F.Spada – AMS TIM April ‘06

State “Ground” F.Spada – AMS TIM April ‘06 Box S Manifold disable V1a disable V1b disable V10b disable V2b disable V3b disable V20b disable V4b close VimA close VimB close VimC close VimD i = 1, …,5 (6) m = 1, …,8 heaters off Box C disable V6a disable V18a disable V6b disable V18b close V8a close V8b heaters off CP1 off CP2 off F.Spada – AMS TIM April ‘06 HV off